Jefferson County, Tennessee
Baneberry is a city in Jefferson County, Tennessee. Baneberry adopts its own zoning, so inside its limits Baneberry’s rules apply, not the county’s. Septic permits inside Baneberry come from the state health agency. 16 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Jefferson County page.
Construction, moving or alteration of any building including accessory buildings inside Baneberry city
“it is unlawful to commence the excavation for the construction of any building, including accessory buildings, or to commence moving or alteration of any building, including accessory buildings until the baneberry building official has approved issuance of a building permit”
Work inside Baneberry city limits
“the most current editions, as adopted by baneberry city ordinances of: international residential code for 1- and 2- family dwellings international building code”
New construction inside Baneberry city
inspection fee: 175 USD each (owner pays for additional or failed inspections)
“within three days of such application, the building official shall make a final inspection of the property in question”
Land or buildings erected or altered in use inside Baneberry city
“no land or building hereafter erected or altered in its use, shall be used until such a certificate of occupancy has been granted.”
Land inside Baneberry city limits
“the baneberry zoning ordinance divides the community into districts within which restrictions and limitations are specified; permitted and special uses are established;”
Baneberry city zoning districts
“r-1, single family residential district 29-33 r-2, multiple-family residential district 33-34 c-1, commercial/business district 34-35”
R-1 single family residential district inside Baneberry city (R-2 same as R-1)
min lot area, no city water or sewer: >= 25000 sq ft · min lot area, city water only: >= 20000 sq ft · min lot area, city water and sewer: >= 13500 sq ft · min lot width: >= 75 ft
“without city water and sewer 25,000 n/a 75 30 15 30 35 with city water and without sewer 20,000 n/a 75 30 15 30 35 with city water and sewer 13,500 n/a 75 30 15 30 35”
R-1 single family residential district inside Baneberry city
front yard: >= 30 ft · side yard: >= 15 ft · rear yard: >= 30 ft
“with city water and sewer 13,500 n/a 75 30 15 30 35 r-2 same as r1 3,000 50 30 8 25 35”
R-1, R-2 and C-1 districts inside Baneberry city
maximum height: <= 35 ft (special permit from Board of Zoning Appeals)
“with city water and sewer 13,500 n/a 75 30 15 30 35 r-2 same as r1 3,000 50 30 8 25 35”
RVs and travel trailers on lots in the R-1 residential district inside Baneberry city
visiting RV maximum: <= 7 days
“recreational vehicles, boats, utility trailers, travel trailers, etc., not for commercial use, owned by property owners shall be permitted if they are parked behind the forward-most line of their home completely on their lot and under no circumstances to be used for a residence.”
R-1 residential district lots inside Baneberry city
visiting RV maximum: <= 7 days
“tents, trailers, portable or move-in buildings shall not be permitted on any lot. visiting r.v.s/travel trailers are permitted for a reasonable period - not to exceed seven (7) days.”
New construction with onsite sewage disposal inside Baneberry city
“copy of approved permit from the tennessee department of environment and conservation for construction of subsurface sewage disposal system.”
Subdividing and platting inside Baneberry city
“ordinance no. 211-5: an ordinance to adopt the revised subdivision regulations of the city of baneberry, tennessee”
Building permits inside Baneberry city
permit fee: 50 USD (non-refundable) · inspection fee: 175 USD each
“a non-refundable $50 permit fee plus inspection costs. inspections are $175 ea. a new home will have a minimum of 5 inspections.”
Building permits inside Baneberry city
“the applicant shall submit a site plan certified by a registered surveyor or engineer indicating the location of all: (1) lot lines;”
Baneberry does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Subsurface sewage disposal systems inside Baneberry city; city requires the TDEC permit with its building permit
“copy of approved permit from the tennessee department of environment and conservation for construction of subsurface sewage disposal system.”
We looked and could not find an official answer yet. Silence is not permission; ask Baneberry or Jefferson County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Baneberry publishes no rule on the point, not that none exists. Jefferson County’s page lists the county offices to call.