Parker's Crossroads is a city in Henderson County, Tennessee. Parker's Crossroads adopts its own zoning, so inside its limits Parker's Crossroads’s rules apply, not the county’s. 18 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Henderson County page.

Answers from the rulebook for Parker's Crossroads

Parker's Crossroads’s own rules

  • Building permitRequired

    Excavation for, construction, moving or alteration of any building including accessory buildings inside Parker's Crossroads city

    • Permit issued by the city manager or designee
    • Applicant submits dimensional sketch or scale plan
    • Permit becomes void six months from issuance unless substantial progress has been made
    • A fee will be charged

    permit validity without substantial progress: 6 months

    “it shall be unlawful to commence the excavation for the construction of any building, including accessory buildings, or to commence the moving or alteration of any building, including accessory buildings, until the city manager or his designee has issued a building permit for such work.”
  • InspectionsLimited

    Final inspection for zoning conformity before occupancy inside Parker's Crossroads city

    • Final inspection within three days after notice of readiness, checking conformity with the zoning ordinance only
    • Enforcing officer may inspect buildings or premises as needed to enforce the ordinance
    • Construction-code inspections not found

    final inspection timeframe: <= 3 days

    “within three (3) days after notification that a building or premises or part thereof is ready for occupancy or use, it shall be the duty of the city manager or his designee to make final inspection thereof”
  • Certificate of occupancyRequired

    Land or buildings erected or altered in use inside Parker's Crossroads city

    • Issued by city manager or designee upon finding conformity with the zoning ordinance
    • Refusal must be stated in writing with the cause
    “no land or building or part thereof hereafter erected or altered in its use of structure shall be used until the city manager or his designee shall have issued a certification of occupancy”
  • Local zoningPresent

    Land inside Parker's Crossroads city limits (Henderson County, TN)

    • Ordinance originally adopted 11/05/1987; amended 2021 and 2024 (Ordinance No. 112, May 2, 2024)
    • Authorized under T.C.A. 13-7-201 through 13-7-210
    “the lands within the corporate limits of the city of parker's crossroads, tennessee, are divided into districts designated as follows”
  • Zoning districtsPublished

    Zoning districts inside Parker's Crossroads city

    • Boundaries shown on the official zoning map incorporated into the ordinance; map not reviewed
    “r-l residential district r-2 residential district c-l general commercial district a-o agriculture-open space district provisions l-1 light industry district provisions”
  • Minimum lot sizeSpecified

    A-O agriculture-open space district inside Parker's Crossroads city

    • All lots or building sites must be on public streets
    • Minimum lot width 125 feet at the building setback line

    minimum lot or building site: >= 1 acre · minimum lot width: >= 125 feet

    “no farm, ranch, or other parcel of land shall be reduced in area to provide separate lots or building sites of less than one acre in area. all lots or building sites must be on public streets.”
    2 more reviewed findings on this topic
  • SetbacksSpecified

    A-O agriculture-open space district inside Parker's Crossroads city

    • Front yard 30 feet in planned subdivisions
    • Rear yard 35 feet on county, state, federal highways; 30 feet in planned subdivisions

    front yard on highways: >= 50 feet (30 feet in planned subdivisions) · rear yard on highways: >= 35 feet (30 feet in planned subdivisions) · side yard, single-story: >= 20 feet (plus 5 feet per additional story)

    “the side yard shall be a minimum of twenty (20) feet for a single-story structure, plus an additional five (5) feet for each additional story.”
    2 more reviewed findings on this topic
  • Lot coverageSpecified

    A-O agriculture-open space district inside Parker's Crossroads city

    maximum lot coverage: <= 20 percent

    “permitted structures, both principal and accessory, shall cover no more than twenty (20) percent of total land area.”
    One more reviewed finding on this topic
    • Specified — R-1 and R-2 residential districts, dwellings and accessory buildings, inside Parker's Crossroads city
      “maximum lot coverage by all buildings (1) dwellings & accessory 35 percent (2) churches 40 percent (3) other uses 50 percent or less as required by the bza.”
  • Building heightSpecified

    R-1 and R-2 residential districts inside Parker's Crossroads city

    • Lots under 50 feet wide at building line: 1.5 stories or 25 feet
    • Accessory buildings may not exceed two stories
    • Unoccupied poles, spires, towers, antennae may exceed if set back their height plus 10 feet

    maximum height: <= 35 feet (or 3 stories) (25 feet/1.5 stories on lots under 50 feet wide)

    “no building shall exceed three (3) stories or thirty-five (35) feet in height.”
    One more reviewed finding on this topic
  • Living in an RVLimited

    RV/travel trailer occupancy inside Parker's Crossroads city

    • Travel trailer parks only in A-O district, on appeal to the Board of Zoning Appeals
    • Park must be 3+ acres; maximum stay 90 days per travel trailer
    • Site plan needs approved water, sewer, gas (if applicable) and electric permits
    • Intended for transient construction labor in Henderson County
    • No travel trailer closer than 500 feet to an existing residence
    • RVs and travel trailers are excluded from transient lodging in C-1
    • Individual-lot RV occupancy in residential districts not addressed

    maximum stay: <= 90 days (travel trailer parks only) · minimum park size: >= 3 acres

    “the maximum length of stay for each travel trailer shall be 90 days.”
  • Manufactured homesLimited

    Mobile/manufactured homes inside Parker's Crossroads city, by district

    • Permitted in A-O district; mobile home parks in A-O only on appeal
    • R-2 excludes single wide mobile homes on single lots
    • R-1 lists only single-family dwellings (mobile homes not listed)
    “detached single family homes, duplexes, and mobile homes.”
  • Permit processPartial

    Building permit application inside Parker's Crossroads city

    • Application to city manager or designee
    • Refusal stated in writing with the cause
    • Permit void after six months without substantial progress
    • Application forms and fee schedule not found
    “in applying to the city manager for a building permit, the applicant shall submit a dimensional sketch or a scale plan indicating the shape, size, height, and location on the lot of all buildings to be erected, altered, or moved and of any building already on the lot.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Parker's Crossroads or Henderson County directly.

  • Owner-builder exemption — Owner-builder exemption inside Parker's Crossroads city
  • Building code adopted — Building code adoption inside Parker's Crossroads city
  • Minimum dwelling size — Minimum dwelling size inside Parker's Crossroads city
  • Camping on your land — Temporary camping on private land inside Parker's Crossroads city
  • Tiny homes — Tiny homes inside Parker's Crossroads city
14 more unanswered
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Parker's Crossroads publishes no rule on the point, not that none exists. Henderson County’s page lists the county offices to call.

← All of Henderson County: county rules, score and offices