Bolthole Index

Hamblen County, Tennessee

Building permits, zoning and land rules in Morristown, Tennessee

Morristown, Tennessee requires city building permits for new construction, issued through Building Inspections.1 Morristown administers its own zoning inside city limits.2 Public sewer availability limits private sewage disposal; where septic is allowed, TDEC handles septic permits for Hamblen County properties.34

At a glance

Building permits
City building permits and inspections required for new construction1
Zoning
City zoning; allowed uses depend on the parcel’s designation2
Septic
TDEC permits; private disposal prohibited where public sewer is available43
RV living
Conditional: zoning, stationary-structure code compliance and building-official permit5
Manufactured homes
Single-wide occupancy subject to house-trailer rules; floodplain standards also apply6
Agricultural exemption
Tennessee’s county agricultural zoning exemption does not apply to municipalities7

Who to call

Building permits

City of Morristown Building Inspections

City building permit applications and construction inspections

(423)585-4626

[email protected]

Planning & zoning

City of Morristown Development & Planning

City zoning and development questions

(423)585-4620

100 W. First North Street, Morristown, TN 37814

Septic permits

TDEC Knoxville Environmental Field Office

Septic inquiries and permit requests for Hamblen County properties

865-594-6035

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Morristown means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Morristown, TN?

Morristown requires building permits and inspections for new construction, renovations, remodels and additions.1 The city’s building-permit list also includes accessory structures such as carports, sheds and gazebos, so a small outbuilding should be discussed with Building Inspections before construction.1

Morristown’s published application process calls for an application, appropriate plans and fees, and planning approval may be needed before the building permit is issued.8 For residential projects, the city specifically says plans are not required “as such” and directs applicants to ask the office what the project requires.1

Who issues building permits in Morristown?

City of Morristown Building Inspections is the contact for city building permit applications and construction inspections; call (423)585-4626.1 Completed Building Inspections applications can be emailed to [email protected].1 Morristown directs applicants to contact the appropriate inspector to schedule an inspection appointment, with inspections scheduled as time allows.1

For zoning and development questions, contact Morristown Development & Planning at (423)585-4620 or its office at 100 W. First North Street, Morristown, TN 37814.9 Septic inquiries go separately to TDEC’s Knoxville office at 865-594-6035.10

Does Morristown have zoning, and what does it mean for RVs and tiny homes?

Morristown has city zoning, with residential, industrial, commercial and mixed-use areas; specific use permissions and dimensional requirements depend on the property’s zoning designation.2 Ask Morristown Development & Planning to review the parcel and proposed use before committing to a building layout.92

We could not confirm Morristown’s district-specific minimum lot sizes, setbacks, dwelling sizes or a definitive tiny-home or accessory-dwelling occupancy rule; ask Development & Planning for the applicable district requirements.119 Tennessee’s agricultural zoning exemption applies to counties and has no application to municipalities, so it does not establish an exemption inside Morristown.7

How do septic permits work inside Morristown?

Morristown prohibits septic tanks and other private sewage-disposal facilities where public sewer is available; private disposal is permissible only where public sanitary sewer service is unavailable and applicable wastewater rules are met.3 Resolve sewer availability before budgeting for an off-grid sanitation system.123

Where septic is allowed, TDEC administers septic permitting for Hamblen County properties, and a septic permit is required for construction, modification or repair.413 Obtain the septic permit before dirt work or building-pad construction.14 The installer must arrange final inspection before covering the system; approval leads to a TDEC Certificate of Completion.15

Can you live in an RV while building in Morristown?

Morristown treats pull-behind campers and motorized recreational vehicles as house trailers for occupancy purposes.5 Occupancy requires compliance with the plumbing, electrical, sanitary and building provisions applicable to stationary structures, a location conforming to city zoning, and a permit issued first by the building official.5 Ask Building Inspections and Development & Planning to review the proposed RV location before relying on the parcel as temporary housing.519

Morristown’s city-park camping prohibition applies to city-owned or city-leased parks; the private-land RV occupancy answer comes from the house-trailer rule.165 Single-wide mobile-home occupancy also falls under the house-trailer conditions.6

Building a home in Morristown: what are the steps in order?

  1. Ask Morristown Development & Planning to confirm the parcel’s zoning designation and proposed use; planning approval may precede the building permit.28
  2. Establish public sewer availability; if private disposal is permissible, obtain the TDEC septic permit before dirt work.314
  3. Ask Building Inspections what residential application materials are required, then submit the application and fees.18
  4. Arrange city construction inspections and, for septic, final inspection before the system is covered.115
  5. For projects subject to city stormwater permitting, complete acceptance of stormwater facilities, corrections and as-built approvals before a certificate of occupancy can be granted.17

What stays with Hamblen County, and what should Morristown buyers check?

TDEC’s septic responsibilities cover Hamblen County properties, while Morristown decides city zoning and handles city building permits.421 For land outside Morristown’s corporate limits, use the Hamblen County guide; the county subdivision regulations expressly govern land outside those limits.18

Inside Morristown, contact the city floodplain administrator about mapped flood hazards before grading, filling or building; floodplain review is managed locally.19 An entrance affecting state-highway right-of-way requires a TDOT driveway permit.20 We could not confirm a Morristown-specific private-well rule; raise the proposed water source with Development & Planning before purchase.9

Watch-outs

  • Public sewer availability can rule out a septic tank or other private sewage-disposal system in Morristown.3
  • An RV on private land in Morristown needs zoning conformity, applicable stationary-structure code compliance and a building-official permit before occupancy.5
  • For stormwater-permitted projects in Morristown, unfinished stormwater acceptance and as-built approvals can delay the certificate of occupancy.17

Sources

  1. City of Morristown Building Inspections (mymorristown.com)
  2. City of Morristown Small Business Guide (Morristown), quoted and re-checked
  3. library.municode.com (Morristown), quoted and re-checked
  4. Third-Party Permits & Final Inspections, quoted and re-checked
  5. Sec. 13-108. House trailers (Morristown), quoted and re-checked
  6. Sec. 13-108. House trailers (Morristown), quoted and re-checked
  7. Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule), quoted and re-checked
  8. City of Morristown Small Business Guide (Morristown), quoted and re-checked
  9. City of Morristown Development & Planning (mymorristown.com)
  10. TDEC Knoxville Environmental Field Office (hamblencountytn.gov)
  11. City of Morristown Small Business Guide (Morristown), quoted and re-checked
  12. Sec. 18-404. General provisions (Morristown), quoted and re-checked
  13. Septic System Construction Permit, quoted and re-checked
  14. Septic System Construction Permit (Tennessee statewide rule), quoted and re-checked
  15. Subsurface Sewage Disposal System (SSDS) Frequently Asked Questions, quoted and re-checked
  16. Sec. 20-102. City park rules and regulations (Morristown), quoted and re-checked
  17. Title 18, Chapter 5 stormwater program ordinance (Morristown), quoted and re-checked
  18. Subdivision Standards of the Hamblen County Regional Planning Commission, quoted and re-checked
  19. Statewide Floodplain Administrator Directory (Tennessee statewide rule), quoted and re-checked
  20. Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Morristown

Morristown’s own rules

  • Certificate of occupancyLimited

    Projects subject to Morristown stormwater permitting inside city limits.

    • All stormwater management facilities must be inspected and accepted.
    • Corrections must be made and accepted.
    • The as-built plan and plat must be approved by the city administrator or designee.
    “Certificate of occupancy shall not be granted until the following is satisfied: (a) All stormwater management facilities have been inspected and accepted by the stormwater program.”
  • Local zoningPresent

    Land inside Morristown city limits; the city adopts and administers zoning controls.

    • Specific use permissions and dimensional requirements vary by zoning designation.
    “Morristown is divided into various residential, industrial, commercial, and mixed use zones.”
  • Zoning districtsPartial

    Morristown city zoning classifications and map administration.

    • The opened official guide identifies broad categories but does not provide the complete district schedule or map.
    • Specific use permissions depend on the property's zoning designation.
    “Morristown is divided into various residential, industrial, commercial, and mixed use zones.”
  • Living in an RVLimited

    Occupancy of pull-behind campers and motorized recreational vehicles as house trailers on private land inside Morristown city limits.

    • The unit must comply with plumbing, electrical, sanitary, and building provisions applicable to stationary structures.
    • The location must conform to city zoning provisions.
    • A building-official permit must be issued first.
    • Double-wide manufactured homes are excluded from the cited house-trailer definition.
    “A house trailer is defined as a trailer fitted with accommodations for sleeping, eating, washing, etc., including but not limited to single-wide mobile homes, pull- behind campers, and motorized recreational vehicles, but excluding double-wide manufactured homes.”
  • Camping on your landProhibited

    Camping in city-owned or city-leased parks inside Morristown city limits.

    • Written approval of the Parks and Recreation director is an exception.
    • Approval is limited to unique situations such as Boy Scout/Girl Scout overnight group campouts.
    • Camping equipment must be removed and sites cleaned before departure.
    “Camping, whether tent, trailer, or other types of units, is prohibited in all parks, except with the written approval of the director.”
  • Manufactured homesLimited

    Single-wide mobile homes and manufactured homes treated as house trailers, and manufactured homes in special flood-hazard areas, inside Morristown city limits.

    • House-trailer occupancy requires compliance with stationary-structure plumbing, electrical, sanitary, and building provisions.
    • The location must conform to city zoning provisions and have a building-official permit.
    • In special flood-hazard areas, manufactured homes must meet the floodplain standards for new construction or specified elevation and anchoring requirements.
    “All manufactured homes placed, or substantially improved, on: (1) individual lots or parcels, (2) in expansions to existing manufactured home parks or subdivisions, or (3) in new or substantially improved manufactured home parks or subdivisions, must meet all the requirements of new construction.”
  • Off-grid sanitationProhibited

    Privies, septic tanks, cesspools, and other private sewage-disposal facilities inside Morristown city limits where public sewer is available.

    • Private disposal systems are permissible only where public sanitary sewer service is not available.
    • Alternative wastewater disposal must comply with applicable local, county, state, and federal laws, rules, and regulations.
    “It shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for disposal of sewage or other wastewater if public sewer is available.”
  • Mandatory utility hookupSewer (with conditions)

    Human-occupancy properties inside Morristown city limits that abut a street, alley, easement, or right-of-way containing a public sanitary sewer, and properties within an area where sanitary sewer service is available.

    • Suitable toilet facilities must be installed.
    • Connection must comply with MUC rules and the city chapter.
    • Private sewage disposal is permissible only when public sanitary sewer service is unavailable.
    “All houses, buildings, structures or properties of any type used for human occupancy, employment, recreation or other purposes [...] is hereby required [...] to connect such facilities directly with the public sewer.”
  • Permit processPublished (with conditions)

    Building permits inside Morristown city limits.

    • The applicant or contractor submits a permit application, appropriate building plans, and fees.
    • Detailed drawings stamped by a Tennessee-licensed design professional may be required for advanced projects.
    • Planning approval may be required before issuance of a building permit.
    “To obtain building permits, you or your contractor must submit a permit application, appropriate building plans, and fees to the Building Inspections Department.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Morristown or Hamblen County directly.

  • Owner-builder exemption — Owner-builder construction inside Morristown city limits.
  • Minimum dwelling size — Minimum dwelling size inside Morristown city limits.
  • Minimum lot size — Minimum lot size inside Morristown city limits.
  • Setbacks — Building setbacks inside Morristown city limits.
  • Lot coverage — Lot coverage inside Morristown city limits.
10 more unanswered
  • Building height
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Morristown publishes no rule on the point, not that none exists. Hamblen County’s page lists the county offices to call.

← All of Hamblen County: county rules, score and offices