The Town of Greeleyville, South Carolina requires building permits for construction and other regulated work inside town limits.1 Greeleyville also requires town approval for sewer or septic connections, while SCDES provides state septic approval where public or community sewer does not serve the property.23 For land outside town limits, use the Williamsburg County guide.

At a glance

Building permits
Required for construction and other regulated work; apply to the building official.1
Zoning and setbacks
We could not confirm town zoning or setback schedules; ask the town clerk.4
Septic approval
State septic approval plus town connection permits and inspection.325
RV and tiny-home living
We could not confirm private-land occupancy rules; ask the town clerk and building official.4
Owner-builder
State exemption is conditional for an owner or family residence, with supervision and recording requirements.6
Building-permit timing
Valid for 12 months; work must begin within 6 months, subject to extension provisions.7

Who to call

Building permits

Town of Greeleyville — town clerk / building-official referral

Town contact for the clerk and referral to the building official; confirm the current application counter and zoning contact.

843-426-2111

3 Toby Place Greeleyville SC 29056

Septic permits

South Carolina Department of Environmental Services (SCDES)

State onsite wastewater approval, construction permits and installation inspections; ask for staff serving Greeleyville.

(803) 898-3432

[email protected]

2600 Bull St. Columbia, SC 29201

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Town of Greeleyville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Town of Greeleyville, SC?

Greeleyville requires an application to the building official before construction, enlargement, alteration, repair, movement, demolition or a change of building occupancy, as well as other regulated work.1 Greeleyville requires separate permits for the construction contractor and each plumbing, electrical, mechanical or gas-equipment contractor.1 Ordinary minor repairs may proceed without a building permit only with building-official approval and without violating the town building chapter.1 New-construction plans must include a septic or sewer permit, so settle wastewater approval alongside the house plans.1

Who handles building-permit applications in Town of Greeleyville?

Greeleyville’s code directs building-permit applications to the building official on the town’s form, with the required fee, work description, location and owner or authorized-agent signature.7 Start with the Town of Greeleyville contact listed here and ask the clerk to identify the current building official and application counter.4 The building official may require plans, specifications, computations, site drawings and a boundary survey.7 Town business-license-tax certification is required before building-permit issuance.7 We could not confirm a published town fee schedule; request the applicable building and trade-permit fees from the clerk before submitting.7

Does Town of Greeleyville have zoning, and can you live in an RV or tiny home?

We could not confirm an adopted Greeleyville zoning ordinance, zoning map, minimum lot size, minimum dwelling size or setback schedule; ask the town clerk for the rules applicable to the parcel.4 We also could not confirm private-land RV occupancy, temporary camping, tiny-home occupancy or accessory-dwelling rules in Greeleyville; describe the proposed use to the clerk and building official before buying.4 Greeleyville requires adequate facilities for liquid waste and human-excreta disposal before a place intended for human habitation is occupied.8 Wastewater approval therefore needs attention even while the proposed housing use remains unresolved.8

How do septic permits work inside Town of Greeleyville?

Greeleyville requires a clerk-issued permit for a public-sewer or sanitary-septic connection, and the town directly inspects and approves installation and connections.25 Where public or community sewer does not serve a proposed home or manufactured home, SCDES approval and a septic installation permit are required.3 Greeleyville’s sanitation code requires service connections for buildings needing water or sewer service unless the town receives the specified state permission for septic use.8 Ask the town about service availability before applying: state rules prohibit an onsite wastewater permit where public sewer is accessible.9 The SCDES application fee is $150, and the online application requires a plat or deed.10

What are the steps for building a home in Town of Greeleyville?

First, resolve water and sewer service with Greeleyville and obtain the applicable sewer or septic approval for the new-construction plans.81 Next, submit the town building-permit form, fee, work description and location, plus plans or a survey when the building official requires them.7 Arrange the required separate contractor permits and town business-license-tax certification before issuance.17 Greeleyville building permits are valid for 12 months, and work must begin within 6 months unless extended under the ordinance.7 During septic installation, the installer must contact SCDES for inspection before covering the system; town inspection and approval also apply.11

What should owner-builders check before building in Town of Greeleyville?

South Carolina’s owner-builder exemption applies conditionally to a residence intended solely for the owner or family, with no intent to sell or rent and no public access.6 The owner must personally sign the building-permit application, supervise construction and comply with applicable building codes and zoning rules.6 The owner-builder exemption does not authorize hiring an unlicensed residential builder or specialty contractor, and the owner must record the required notice with the register of deeds.6 Selling or renting within 2 years after completion creates a statutory presumption against the exemption unless otherwise approved by the commission.6 Ask Greeleyville’s building official how to document the exemption with the town application.7

Watch-outs

  • We could not confirm Greeleyville’s floodplain application procedure, certificate-of-occupancy requirements or driveway approval process; ask the town clerk for the responsible official before committing to a site.4
  • Greeleyville’s town connection permit does not replace SCDES septic approval or the installation inspection.211
  • South Carolina’s 2024 building codes are scheduled for local implementation on January 1, 2027; ask the Greeleyville building official which edition applies to the application date.12

Sources

  1. Greeleyville Code § 8-28, Building permit (Town of Greeleyville), quoted and re-checked
  2. Greeleyville Code § 28-31, Sewer connections required when provided (Town of Greeleyville), quoted and re-checked
  3. DHEC Onsite Waste Water Program description (Town of Greeleyville), quoted and re-checked
  4. Town of Greeleyville — town clerk / building-official referral (williamsburgcounty.sc.gov)
  5. Greeleyville Code § 28-31, Sewer connections required when provided (Town of Greeleyville), quoted and re-checked
  6. South Carolina Code Title 40, Chapter 59 — Residential Home Builders (South Carolina statewide rule), quoted and re-checked
  7. Greeleyville Code § 8-28, Building permit (Town of Greeleyville), quoted and re-checked
  8. Greeleyville Code § 28-63, Required for human habitation (Town of Greeleyville), quoted and re-checked
  9. Professional Soil Classifiers - Sewer Accessibility Verification (South Carolina statewide rule), quoted and re-checked
  10. South Carolina Department of Environmental Services (SCDES) (des.sc.gov)
  11. Greeleyville Code § 28-31, Sewer connections required when provided (Town of Greeleyville), quoted and re-checked
  12. 2024 Building Code Modification Index (South Carolina statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Greeleyville

Town of Greeleyville’s own rules

  • Building permitRequired

    Construction, enlargement, alteration, repair, movement, demolition, occupancy changes, regulated signs, and regulated heating equipment inside Greeleyville town limits.

    • A separate permit is required for the construction contractor and each plumbing, electrical, mechanical, or gas-equipment contractor.
    • Ordinary minor repairs may be made with building-official approval without a permit if they do not violate Chapter 8.
    • New-construction plans must include a septic or sewer permit.
    “When required, an owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure [...] shall first make application to the building official and obtain the required permits for the work.”
  • Who permits septicLocal (with conditions)

    Septic and sewer connection administration inside Greeleyville town limits.

    • The town requires permits for sewer and septic connections and directly inspects and approves installation and connections.
    • DHEC approval and rules also apply to septic systems.
    “The installation and all connections made to public sewers, when provided, and the building of all septic tanks and the drainage thereof and there from shall be done by the owner of the real estate and shall be under the direct inspection and approval of the town.”
  • Septic permitRequired

    Public-sewer connections and sanitary septic tanks inside Greeleyville town limits.

    • A clerk permit is required for a public-sewer or sanitary-septic connection.
    • Where sewerage facilities are unavailable, septic tanks require written DHEC approval and must comply with DHEC rules.
    • DHEC issues onsite-wastewater construction permits.
    “No connection shall be made with the public sewer, when provided, or sanitary septic tank unless a permit therefor has been obtained from the clerk.”
  • Septic inspectionRequired

    Septic tanks and sewer connections inside Greeleyville town limits.

    • The town directly inspects and approves installation and connections.
    • DHEC performs final inspections for onsite-wastewater systems.
    “Before completing the installation of the septic system, the installer must contact SCDES to schedule a time for the inspection of the septic system before it is covered.”
  • Off-grid sanitationLimited

    Off-grid liquid-waste and human-excreta disposal inside Greeleyville town limits.

    • Adequate disposal facilities must be installed before occupancy.
    • Water- or sewer-service buildings must connect unless DHEC grants special permission for septic.
    • Where sewerage is unavailable, septic tanks require written DHEC approval and compliance with DHEC rules.
    “Before any place of human habitation, commercial use, public assembly or any similar place intended to be used for such is occupied, the owner or occupant thereof shall have installed therein adequate facilities for the disposal of liquid waste and human excreta. No person shall occupy any such place until the provisions hereof have been compiled with. [...] All residences and buildings requiring water or sanitary sewer service shall be connected thereto for water and disposal of all sewage and similar waste originating on said premises unless the town receives a letter from the department of health and environmental control (DHEC) granting special permission for use of a septic tank.”
  • Permit processPartial

    Building-permit applications inside Greeleyville town limits.

    • Applications require the town form, required fee, work description, location, and owner or authorized-agent signature.
    • The building official may require plans, specifications, computations, site drawings, and a boundary survey.
    • New-construction plans must include a septic or sewer permit.
    • A town business-license-tax certification is required before issuance.
    • Permits are valid for 12 months; work must begin within six months, subject to stated extension and renewal provisions.

    permit validity: 12 months · commencement deadline: 6 months (unless extended under the ordinance)

    “Each application for a permit, with the required fee, shall be filed with the building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or his authorized agent. The application shall contain such other information as may be required by the building official. [...]. A permit issued shall be valid for 12 months from the date of issue.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Greeleyville or Williamsburg County directly.

  • Owner-builder exemption — Owner-builder exemptions inside Greeleyville town limits.
  • Certificate of occupancy — Certificate-of-occupancy requirements inside Greeleyville town limits.
  • Local zoning — Land inside Greeleyville town limits.
  • Zoning districts — Zoning-district publication for land inside Greeleyville town limits.
  • Minimum dwelling size — Minimum dwelling size inside Greeleyville town limits.
14 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Greeleyville publishes no rule on the point, not that none exists. Williamsburg County’s page lists the county offices to call.

← All of Williamsburg County: county rules, score and offices