Dorchester County, South Carolina
Town of Harleyville is a town in Dorchester County, South Carolina. Town of Harleyville adopts its own zoning, so inside its limits Town of Harleyville’s rules apply, not the county’s. 12 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Dorchester County page.
Construction, alteration, demolition, change of use or occupancy inside Harleyville town
“it is unlawful to construct, reconstruct, alter, demolish, change the use of, or occupy any land, building, or other structure without first obtaining the appropriate permit.”
Development inside Harleyville town before a certificate of occupancy is issued
“an inspection of the development to determine its conformance to this ordinance, the harleyville land development ordinance and other applicable codes and regulations will be required prior to the issuance of a certificate of occupancy.”
Development inside Harleyville town
certificate of occupancy fee: 100 USD per application
“an inspection of the development to determine its conformance to this ordinance, the harleyville land development ordinance and other applicable codes and regulations will be required prior to the issuance of a certificate of occupancy.”
All land within the corporate limits of Harleyville town, Dorchester County, SC
“the regulations set forth in this ordinance govern the development and use of all land and structures - built and natural environments - within the corporate limits of the town of harleyville.”
Harleyville town
“all land within the corporate limits of the town of harleyville is hereby divided into districts as described and as depicted on the accompanying document, the town of harleyville official zoning map.”
Lots subdivided after the ordinance's effective date, all districts including single-family residential and rural residential, inside Harleyville town
minimum lot size: >= 0.5 acre (boundary line adjustment)
“lots to be subdivided after the effective date of this ordinance in all districts shall be at least ½ acre (.50 ac.) in area.”
All districts inside Harleyville town
inhabitable heated floors above grade: <= 25 feet (special exception) · all other structures: <= 100 feet (special exception)
“inhabitable heated floors shall not be elevated more than twenty-five feet (25') above grade.”
Manufactured homes inside Harleyville town
minimum roof pitch: >= 3:12
“all units shall be usdhud-approved (bearing such seal), meeting the certified under the national manufactured housing construction and safety standards act and the sc manufactured housing standards.”
Subdivision of land inside Harleyville town
“lots to be subdivided after the effective date of this ordinance in all districts shall be at least ½ acre (.50 ac.) in area.”
Parcels outside rural residential districts inside Harleyville town
minimum public frontage (non-RR): >= 20 feet (rural residential and legacy landlocked parcels)
“all parcels, except those in rural residential zoning districts and those nonconforming landlocked parcels legally existing prior to adoption of this ordinance, shall have at least twenty feet (20') of frontage along a public rightof-way.”
Zoning and related permits inside Harleyville town
zoning permit: 250 USD per application · certificate of occupancy: 100 USD per application · special exception: 500 USD per application · variance: 250 USD per application
“additionally, costs for outside reviews (ie. engineering, utilities, stormwater), that may be required will be the responsibility of the applicant.”
Zoning permits inside Harleyville town
“a zoning permit will be issued only after it is demonstrated to the satisfaction of the zoning administrator that all land development and zoning codes will be met.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Harleyville or Dorchester County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Harleyville publishes no rule on the point, not that none exists. Dorchester County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Harleyville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.