Town of Great Falls, South Carolina requires residential building permits, with Chester County Building + Zoning listing the town within its building and zoning jurisdiction.12 Great Falls has its own zoning ordinance; septic projects require state approval and a local written permit from the town superintendent where public sewer is unavailable.345
At a glance
- Building permits
- Required; Chester County Building + Zoning lists Great Falls in its jurisdiction12
- Zoning
- Town ordinance; confirm the parcel’s district before choosing a home design36
- Septic
- State approval plus a local written permit from the town superintendent45
- Sewer connection
- Required within 250 feet where gravity-flow connection is possible, following official notice7
- Lot size and setbacks
- District-specific residential requirements89
- Owner-builder
- State exemption is conditional; building codes and zoning still apply10
- Floodplain
- Town ordinance bars placing buildings in floodplains11
Who to call
Building permits
Chester County Building + Zoning
Building and zoning administration, plan review and inspections for Great Falls under the county’s stated jurisdiction
1476 J.A. Cochran Bypass Chester, SC 29706
Planning & zoning
Town of Great Falls Planning Commission / Town Hall
Town zoning and development questions; planning commission information; referral to the superintendent for local private-sewage approval
810 Dearborn Street Great Falls, SC 29055
Septic permits
South Carolina Department of Environmental Services Onsite Wastewater
Onsite wastewater application questions, permit records and final-inspection contacts
Building permits
Chester County Building + Zoning — residential application requirements
Residential building application checklist and inspection sequence; confirm application to the Great Falls parcel with Building + Zoning
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Town of Great Falls means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Town of Great Falls, SC?
Residential building permits are required in Great Falls, and Chester County Building + Zoning expressly includes the town in its building jurisdiction.12 The county department issues building, electrical, plumbing, mechanical and zoning permits.2
South Carolina allows governmental agreements for building-code enforcement, so county administration inside town limits does not mean that unincorporated-county zoning standards replace the town ordinance.123 For a Great Falls project, ask Building + Zoning to identify the required building and trade applications, and confirm the town zoning district before finalizing plans.26
Who handles building permits and zoning questions in Town of Great Falls?
Chester County Building + Zoning is the building-permit and inspection contact for Great Falls under the county’s published jurisdiction statement; the county page also provides an online permitting and plan-review service.2 The residential checklist links the Evolve application portal.13
Great Falls Town Hall is the contact for town zoning and development questions, and the town Planning Commission oversees administration of locally adopted land-development regulations.14 Start a building application with the county department and take town ordinance or planning questions to Town Hall.214 Septic approval remains a separate state process, with a local superintendent’s written permit also required by the town code.54
Does Town of Great Falls have zoning, lot-size rules and setbacks?
Great Falls has zoning, and land, buildings and structures must conform to the regulations of the district where the parcel is located.3 The official zoning map is part of the town zoning chapter and is kept at Town Hall for public inspection.6
Residential lot size, building coverage, yard setbacks and building height are governed by the town’s district-specific dimensional requirements.891516 Ask Town Hall and Building + Zoning to identify the parcel’s district and the applicable dimensions before buying a narrow lot or ordering a home.1428 Great Falls subdivision approval is also required before transferring part of a proposed subdivision or issuing a building permit there.17
How do septic permits and sewer connections work in Town of Great Falls?
Great Falls requires an owner to connect at the owner’s expense when property used for occupancy or other covered purposes is within 250 feet of a public sanitary sewer and can connect by gravity flow; connection is due within 60 days after official notice.7 South Carolina will not issue an onsite wastewater permit where public sewer is accessible.18
Where public sewer is unavailable, the Great Falls code requires a written private-sewage permit signed by the town superintendent before construction, alongside state approval for septic tanks.4 SCDES must evaluate a new-home site and issue the septic construction permit before the county can issue the building permit; the installer must arrange the state final inspection before covering the system.519 Ask Town Hall for the superintendent’s local application and SCDES for the state application.14420
Can you live in an RV or tiny home in Town of Great Falls?
We could not confirm whether Great Falls allows living in an RV on private land, temporary camping during construction, or a tiny home as a permanent dwelling; ask Town Hall and Chester County Building + Zoning about the proposed parcel and use.142 Great Falls district rules govern land and building uses, so obtain a specific zoning answer before purchasing a dwelling for the site.3
Manufactured/mobile-home permissions differ by district, and individual-lot homes and mobile-home parks are subject to separate town provisions.21 A manufactured-home provision does not establish permission for an RV or tiny home; request a determination for the actual structure and occupancy proposal.212
Building a home in Town of Great Falls: what are the steps?
- Confirm the Great Falls zoning district and proposed residential use with Town Hall and Building + Zoning; resolve subdivision approval before a building application if the site is part of a proposed subdivision.6317142
- Establish sewer availability; where septic is appropriate, obtain SCDES approval and the town superintendent’s local written permit.1854
- Ask Building + Zoning to confirm its residential checklist for the town parcel: obtain the site address, recorded plat, tax map number, plans and water/sewer documentation before building-permit issuance.132
- Apply through the county’s residential portal and arrange the required inspections; the published checklist prohibits occupancy until final inspection passes and a Certificate of Occupancy is issued.13
What should you check before buying land in Town of Great Falls?
Check floodplain status before relying on a Great Falls parcel as a homesite: the town ordinance says building-placement permits shall not be issued in floodplains and limits zoning permits there to permitted open-air uses.11 A proposed subdivision must follow the town approval process before deed transfer or building-permit issuance.17
A private residential well requires South Carolina general-permit coverage through a Notice of Intent, and that state coverage does not authorize wells prohibited by local law; ask Town Hall about any town restrictions.2214 South Carolina also requires Department approval before opening, constructing or reconstructing an entrance onto a primary highway, subject to the statute’s scope.23 For land outside town limits, use the Chester County guide to check the county’s building and zoning jurisdiction.2
Watch-outs
- Great Falls floodplain rules bar placing buildings in floodplains; confirm the proposed building footprint with Building + Zoning before buying.112
- South Carolina’s owner-builder exemption requires personal supervision, qualifying owner/family occupancy and a recorded public notice; applicable building codes and zoning still apply.10
- A qualifying farm-structure exemption does not cover a residence or a structure attached to a residence, and does not remove local authority to require building permits.24
- We could not confirm Great Falls building-permit fees or private-land RV occupancy rules; ask Building + Zoning for the current fee schedule and a parcel-specific occupancy determination.2
Sources
- Building + Zoning – Chester County, SC (2026 county census)
- Chester County Building + Zoning (chestercountysc.gov)
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Great Falls Code of Ordinances, Sec. 42-23. Private sewage disposal (Town of Great Falls), quoted and re-checked
- Septic Tanks - Residential, Single Home Builder (South Carolina statewide rule), quoted and re-checked
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Great Falls Code of Ordinances, Sec. 42-22. Use of public sewers required (Town of Great Falls), quoted and re-checked
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- South Carolina Code Title 40, Chapter 59 — Residential Home Builders (South Carolina statewide rule), quoted and re-checked
- Great Falls Zoning Ordinance, Sec. 46.118 (Town of Great Falls), quoted and re-checked
- South Carolina Code Title 6, Chapter 9 — Building Codes (South Carolina statewide rule), quoted and re-checked
- Chester County Building + Zoning — residential application requirements (chestercountysc.gov)
- Town of Great Falls Planning Commission / Town Hall (greatfallssc.gov)
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Land Development Regulations, Great Falls, South Carolina (Town of Great Falls), quoted and re-checked
- Professional Soil Classifiers - Sewer Accessibility Verification (South Carolina statewide rule), quoted and re-checked
- Septic Tanks - Frequently Asked Questions (South Carolina statewide rule), quoted and re-checked
- South Carolina Department of Environmental Services Onsite Wastewater (des.sc.gov)
- Great Falls Zoning Ordinance (Town of Great Falls), quoted and re-checked
- Private Drinking Water Wells (South Carolina statewide rule), quoted and re-checked
- scstatehouse.gov (South Carolina statewide rule), quoted and re-checked
- South Carolina Code of Laws, Section 6-9-65 (South Carolina statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.