Sullivan County, Pennsylvania
Cherry Township is a township in Sullivan County, Pennsylvania. 9 rules below are quoted from official sources and independently re-checked, most recently on November 8, 2026. Rules for unincorporated land are on the Sullivan County page.
Cherry Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction or building work in Cherry Township subject to the Pennsylvania UCC.
“The UCC requires property owners to obtain a construction or building permit before starting any work.”
Buildings in Cherry Township subject to the Pennsylvania Uniform Construction Code.
“The Uniform Construction Code applies to the construction, alteration, repair, movement, equipment, removal, demolition, location, maintenance, occupancy or change of occupancy of every building or structure which occurs on or after April 9, 2004, and all existing structures that are not legally occupied.”
UCC-covered work in Cherry Township.
“Inspections are also necessary in several cases, including construction or changes to commercial or residential buildings, electrical, gas, mechanical or plumbing systems, and the installation of swimming pools or hot tubs.”
Residential buildings in Cherry Township governed by the Pennsylvania UCC.
“A residential building may not be used or occupied without a certificate of occupancy issued by a building code official.”
Individual or community on-lot sewage systems and buildings served by them inside Cherry Township.
“No person may install, award a contract for construction or construct an individual or community onlot sewage system, or install, construct, occupy or use a building to be served by that system without first obtaining a permit from the local agency, except as provided in subsections (c)—(e).”
Composting, incinerating, recycling, or other water-conservation toilets in Cherry Township.
“A permit is not required for the installation of a recycling toilet, incinerating toilet, composting toilet or other type of water conservation device where the existing onlot system will not be altered.”
Agricultural-purpose leased subdivisions inside Cherry Township where the County subdivision ordinance applies.
minimum parcel area: > 10 acres (Agricultural-purpose subdivision by lease; no new street or easement of access and no residential dwelling.)
“Provided, however, that the subdivision by lease of land for agricultural purposes into parcels of more than 10 acres, not involving any new street or easement of access or any residential dwelling, shall be exempted.”
Subdivision and land development inside Cherry Township, unless Cherry Township has adopted its own subdivision and land development ordinance.
“The provisions of this Ordinance shall be limited to those municipalities within Sullivan County with no Subdivision or Land Development Ordinance in effect.”
County subdivision and land-development applications affecting Cherry Township where County subdivision jurisdiction applies.
“Here are the applications and checklists you need. In order to apply, please download the appropriate forms, fill them out and submit them to the address above.”
We looked and could not find an official answer yet. Silence is not permission; ask Cherry Township or Sullivan County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Cherry Township publishes no rule on the point, not that none exists. Sullivan County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Cherry Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.