Perry County, Pennsylvania
Saville Township is a township in Perry County, Pennsylvania. 8 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Perry County page.
New homes and structures or changes to outside dimensions inside Saville township
“as a general rule, building permits are required for any construction which changes the outside dimensions of an existing structure or adds a new structure”
Agriculture projects inside Saville township under the township permit process
“exception: agriculture or non-inspectable projects do not get a folder to take to biu.”
Division of land and land development inside Saville township
“1979-10 subdivision and land development updated 2007-05 – see below”
Building permit application fees for projects inside Saville township
building permit fee, first thousand of project amount: 5 USD (for the first thousand of project amount) · building permit fee, each additional thousand: per 1 USD (for each thousand after the first thousand)
“this application has a fee based on the amount of the project. $5 for the first thousand and $1 for each thousand after that.”
Building permit application process for projects inside Saville township
“to complete an application and to receive a biu packet, please contact the saville township secretary by calling 717-438-3536 to make an appointment.”
Saville Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction inside Saville township, Perry County, Pennsylvania
“the new uniform construction code (ucc) regulations are now in effect throughout all of pennsylvania, which includes saville township.”
Inspectable construction inside Saville township, including projects over 1,000 square feet, additions, load-bearing wall changes, and pools
“all projects greater than 1000 square feet require a permit and inspections from building inspection underwriters (biu) of new bloomfield per the statewide building codes.”
New homes and certain remodeling or repairs of on-lot sewage systems inside Saville township
“sewage permits are required before a building permit will be issued for new homes.”
We looked and could not find an official answer yet. Silence is not permission; ask Saville Township or Perry County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Saville Township publishes no rule on the point, not that none exists. Perry County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Saville Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.