Zoning, building permits and septic rules in Anthony Township, Pennsylvania
Anthony Township is a township in Montour County, Pennsylvania. Septic permits inside Anthony Township come from Anthony Township. 13 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Montour County page.
Answers from the rulebook for Anthony Township
Anthony Township’s own rules
Who permits septicLocal (with conditions)
On-lot sewage systems for new homes inside Anthony township, through the township sewage enforcement officer.
The township page says the requirements include PA Department of Environmental Protection planning approvals for the site.
Township on-lot sewage program text is a 2024 draft copy (see septic_inspection claim).
“this permit is obtained from the township sewage enforcement officer (seo).”
Septic permitRequired
New homes inside Anthony township served by an on-lot sewage system.
The sewage permit must be obtained first, before the driveway and zoning permits and before building permits.
The site must be tested and found acceptable for an on-lot system and have an approved design, per the township page.
“if you are building a new home, the first permit you should obtain is the sewage permit.”
Septic inspectionRequired
Owners of buildings served by on-lot sewage systems inside Anthony township.
The township news notice says the septic pumping program was changed from three years to five years at an April 3, 2024 meeting.
The inspection requirement is quoted from a PDF marked 'DRAFT' (Revised 2024); the final adopted text was not confirmed.
The draft provides that a waiver from pumping and basic inspection may be granted by the certified SEO in some cases.
pumping and inspection interval: 5 years (per township resolution schedule and draft section 408; initial pumping within three years of effective date in draft)
“anthony township has a mandatory septic pumping ordinance for all residents. at our april 3, 2024 meeting we revised it to be changed from a three (3) year program to a five (5) year program.”
Driveway accessRequired
New driveway access from private property to a road inside Anthony township.
For a driveway that accesses a state road, the township page directs the owner to PennDOT for a highway occupancy permit.
Driveway permit must be obtained before construction.
“if you plan on creating any new access from your property to the road, a driveway permit must be obtained prior to construction.”
Permit processPublished (with conditions)
Permit sequence for new homes and structures inside Anthony township.
Sequence on the township page: sewage permit, then driveway permit, then zoning permit (after erosion and sedimentation plan review by Montour County Conservation District), then building permits through Central Keystone COG.
Projects must begin within 6 months of permit issue and be completed within 2 years, per the township page.
project start deadline: <= 6 months (from date of zoning permit issue) · project completion deadline: <= 2 years (from date of zoning permit issue)
“projects must begin within 6 months from the date of issue and be completed within 2 years of issue date.”
Rules another office applies inside Anthony Township
Anthony Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building permitRequired
New home construction, additions and major alterations inside Anthony township; building permits are processed by Central Keystone COG (Lewisburg) per the township permit page.
The township page says the zoning officer will advise whether building permits may be required for other construction; those are reviewed case by case.
Construction may begin only after all required permits are obtained.
“new home construction, additions, major alterations will definitely require building permits.”
Local zoningPresent (with conditions)
Land inside Anthony township (Montour County, PA) is zoned under the Montour County Zoning Ordinance; the county zoning office issues zoning permits for Anthony township. No Anthony township-adopted zoning ordinance was found.
The county office states it issues zoning permits for Anthony Township; the township's own permit page says zoning permits are reviewed by the zoning officer for compliance with township/county subdivision/land development/zoning ordinances.
The Anthony township water conservation overlay is stated to be for use in conjunction with the Montour County Zoning Ordinance of 1972, adopted March 23, 2010.
Whether Anthony township has adopted any zoning ordinance of its own was not confirmed by an official statement; this claim relies on the county as the zoning administrator.
“the montour county zoning office issues zoning permits for the following montour county municipalities: anthony township, liberty township, mayberry township and the borough of washingtonville.”
Zoning districtsPartial
Zoning districts that apply inside Anthony township under the Montour County Zoning Ordinance (only some are named in the sources read).
The fee schedule lists district names with section references (sections 302 to 309); the ordinance text for those sections was not read.
The water conservation overlay refers to the Agricultural-Conservation district (Article VI-B, A-C) of the county zoning ordinance for underlying uses.
“zoning district rural residential suburban residential village center commercial industrial public / semi public agriculture woodland minimum lot size 1 acres – see section 302 7,5k – 30k square feet per – section 303”
Minimum lot sizeSpecified
Suburban residential district under the Montour County Zoning Ordinance, applying in Anthony township (main single-family residential district by name).
Source is the county zoning fee schedule's summary table, which cites section 303; the ordinance text itself was not read.
The schedule writes the range as 7,5k – 30k square feet; the lower bound is read as 7,500 square feet.
minimum lot size: 7.5k-30k square feet (per section 303 of the Montour County Zoning Ordinance (as summarized in fee schedule))
“zoning district rural residential suburban residential village center commercial industrial public / semi public agriculture woodland minimum lot size 1 acres – see section 302 7,5k – 30k square feet per – section 303”
One more reviewed finding on this topic
Specified — Rural residential district under the Montour County Zoning Ordinance, applying in Anthony township.
“zoning district rural residential suburban residential village center commercial industrial public / semi public agriculture woodland minimum lot size 1 acres – see section 302 7,5k – 30k square feet per – section 303”
Lot coverageSpecified
Suburban residential district under the Montour County Zoning Ordinance, applying in Anthony township.
Maximum coverage is taken from the county fee schedule's summary table, aligned by column order; verify against the ordinance text.
The schedule states that when calculating lot coverage there are 43,560 square feet per acre and gives a worked example.
maximum lot coverage: 30 percent (as summarized in county fee schedule)
“2-5 acres – see section 309 questions concerning fee application should be directed to the zoning officer. max coverage 30% 30% 40% 50% 60% 20% 20% 15%”
One more reviewed finding on this topic
Specified — Rural residential district under the Montour County Zoning Ordinance, applying in Anthony township.
“2-5 acres – see section 309 questions concerning fee application should be directed to the zoning officer. max coverage 30% 30% 40% 50% 60% 20% 20% 15%”
Permit feesPublished (with conditions)
Zoning permit fees for work inside Anthony township, administered by the Montour County Zoning Office.
The schedule is dated 'october 28, 2025' on its face; the PDF file name says 6-2022, and no effective date was confirmed.
Table layout is ambiguous in text extraction; the fee amounts were not split into per-category values and must be read from the PDF.
Schedule notes that no single action fee (private or commercial) will exceed $10,000.00 and that multiple actions on one permit each carry the full fee.
“no single action fee (private or commercial) will exceed $10,000.00.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Anthony Township or Montour County directly.
Owner-builder exemption — Owner-builder exemption for permits inside Anthony township.
Building code adopted — Which building code is adopted for construction inside Anthony township.
Inspections — Building inspections for construction inside Anthony township.
Certificate of occupancy — Certificate of occupancy for new homes inside Anthony township.
Minimum dwelling size — Minimum dwelling size inside Anthony township.
13 more unanswered
Setbacks
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Building in a floodplain
Short-term rentals
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Anthony Township publishes no rule on the point, not that none exists. Montour County’s page lists the county offices to call.