Montgomery County, Pennsylvania

Zoning, building permits and septic rules in Upper Salford Township, Pennsylvania

Upper Salford Township is a township in Montgomery County, Pennsylvania. Upper Salford Township adopts its own zoning, so inside its limits Upper Salford Township’s rules apply, not the county’s. Septic permits inside Upper Salford Township come from Montgomery County (Montgomery County Office of Public Health (OPH) · 610-278-5117). 15 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Montgomery County page.

Answers from the rulebook for Upper Salford Township

Upper Salford Township’s own rules

  • Building permitRequired

    New construction, additions, alterations and listed accessory work inside Upper Salford township

    • Construction may not begin until a building permit has been issued.
    • Accessory buildings under 600 square feet use a zoning permit form instead of a residential building permit; structures over 600 square feet need a residential building permit.
    • Agricultural buildings may use an agricultural UCC exemption form instead.
    “permits are required for, but not limited to, all new construction, additions and/or structural alterations, decks, patios, sheds, above ground and in-ground pools, solar panel arrays, generators, outdoor furnaces, temporary and permanent signs, road occupancy and driveways.”
  • Building code adoptedAdopted

    New construction and alterations inside Upper Salford township

    • The township adopted the Pennsylvania Uniform Construction Code by board action; the page lists related International Codes adopted at the same time.

    adoption date: 2004-07-08 date

    “on july 8, 2004, the upper salford township board of supervisors adopted the pennsylvania uniform construction code as the building code for the township of upper salford.”
  • InspectionsRequired

    Permitted residential construction inside Upper Salford township

    • Inspections must be scheduled at least 24 hours in advance.
    • Six stage inspections are listed in the packet: footings, prepour, foundation backfill, rough framing, wallboard or lath, and final.
    • Electrical inspections are performed by Technicon Enterprises Inc. II as the third-party agency.
    “inspections by the code enforcement officer must be approved before you proceed to the next stage of construction.”
  • Certificate of occupancyRequired

    New residential construction in Upper Salford township

    • The township says use and occupancy permits are only required for residences that are new construction.
    • Septic approval and a potable water test (if well) must be submitted before a use and occupancy certificate is issued.
    “note: no dwelling or structure may be occupied in any manner until the issuance of a final use and occupancy permit.”
    One more reviewed finding on this topic
    • Required — Non-residential properties inside Upper Salford township when the use, operator or tenant changes
      “a use and occupancy permit is required for all non-residential properties when the use, operator, and/or tenant is changed.”
  • Local zoningPresent (with conditions)

    Land inside Upper Salford township, Montgomery County, PA. The township administers its own zoning ordinance through a zoning officer and zoning hearing board.

    • Uses listed as conditional uses in the township zoning ordinance require a conditional use hearing before the board of supervisors.
    • Special exceptions and variances go to the zoning hearing board.
    “a conditional use hearing is required when a desired use is listed as a conditional use in the township zoning ordinance.”
  • Agricultural exemptionConditional

    Agricultural buildings inside Upper Salford township

    • The township offers an agricultural building UCC permit exemption form.
    • The exemption covers only structures used for farm storage or housing livestock, poultry, and milk houses; it does not cover places of occupancy by the general public.
    • A plot plan is required.
    “this is for a structure utilized to store farm implements, hay, feed, grain or other agricultural or horticultural products or to house poultry, livestock, or other farm animals and milk house.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside Upper Salford township

    • Applications go to the planning commission, which meets the third Tuesday monthly.
    • Submissions require 14 paper plan sets plus electronic copies, due 14 business days before the meeting.
    “for all subdivision and/or land development questions, please refer to the township subdivision and land development ordinance for direction and requirements.”
  • Driveway accessRequired

    New homes inside Upper Salford township

    • Applies to new home applications; the packet does not state a separate driveway permit rule for additions.
    • Township road occupancy work is governed by Chapter 21, Part 1 of the township code.
    “if this application is for a new home, a driveway permit is required.”
  • Permit feesPublished (with conditions)

    Building and zoning permit fees inside Upper Salford township

    • Permit fees are calculated during review and collected at pickup; payment is by cash or check only.
    • Application fees are non-refundable once plan review begins.
    • Zoning hearing and conditional use applications carry a fixed fee.

    zoning hearing or conditional use application fee: 850 USD (Applies to zoning hearing and conditional use applications, not building permits)

    “an application for a conditional use hearing must be filed with the township secretary, along with the appropriate fee ($850.00).”
  • Permit processPublished (with conditions)

    Permit applications for projects inside Upper Salford township

    • All permit applications must be received by the township secretary or assistant secretary.
    • Applications sent directly to the outside plan reviewer are delayed.

    residential permit review period: 15 business days · commercial permit review period: 30 business days

    “according to the pennsylvania code, a code official has (15) business days to review and grant or deny a residential permit application and (30) business days to review and grant or deny a commercial permit application.”

Rules another office applies inside Upper Salford Township

Upper Salford Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Septic systems for land inside Upper Salford township; the Montgomery County Health Department administers the permits

    • Scope recorded as countywide because the schema does not allow a county authority with township-specific geography; the township page names the county health department for this service.
    “well and septic permits are handled by the montgomery county health department.”
  • Septic permitRequired

    New homes inside Upper Salford township that use an on-lot septic system

    • A copy of the septic system permit must accompany the building permit application for a new home with an on-lot septic system.
    • A septic approval and potable water test are required before a use and occupancy certificate.
    “if this application is for a new home requiring an on-lot septic system, a copy of the septic system permit must be submitted.”
  • Septic inspectionRequired

    New homes on septic inside Upper Salford township, before a use and occupancy certificate

    • This is a septic approval submitted before occupancy, not a confirmed field-inspection stage; the county's own inspection procedure was not opened.
    “septic approval and potable water test (if well) is required to be submitted before a use & occupancy certificate will be issued.”
  • Well permitRequired

    New homes inside Upper Salford township that use a private water supply

    • Requires a copy of the issued individual water supply installation permit before a building permit is issued.
    • Applies to new homes; additions with bedrooms use an MCHD septic adequacy check.
    “if this application is for a new home, a copy of the issued permit for individual water supply installation from the montgomery county health department is required prior to a building permit being issued.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Upper Salford Township or Montgomery County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside Upper Salford township
  • Minimum dwelling size — Minimum dwelling size inside Upper Salford township
  • Minimum lot size — Minimum lot size for the main single-family residential district inside Upper Salford township
  • Setbacks — Front, rear and side setbacks for residential districts inside Upper Salford township
  • Lot coverage — Maximum lot coverage inside Upper Salford township
8 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Off-grid sanitation
  • Mandatory utility hookup
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Upper Salford Township publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.