Cumberland County, Pennsylvania
Cooke Township is a township in Cumberland County, Pennsylvania. Septic permits inside Cooke Township come from Cooke Township. 12 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Cumberland County page.
Construction, reconstruction, restoration or structural alteration of any building or structure in Cooke township
valuation permit threshold: > 500 square feet (accessory structures exempt from UCC inspection; no permit if cost does not exceed $500)
“no building or structure in the township shall be constructed, erected, reconstructed or restored, or structurally altered (hereafter, “constructed” and “construction”) without either a building permit, or if applicable a township valuation permit as defined in this ordinance, duly issued upon application to the township”
New construction, alteration and occupancy of buildings inside Cooke township
“in order to comply with the provisions of the pennsylvania construction code act, act 45 of 1999, 35 p.s. 7210.101 - 7210.1103, as amended from time to time, and its regulations of construction”
Construction covered by the statewide Uniform Construction Code inside Cooke township
“construction that is covered under the statewide uniform construction code will require a building permit and inspection by the uniform construction code official(s) designated by the township.”
Occupancy or change of use of buildings and land in Cooke township covered by the UCC
occupancy permit fee (2007 schedule): 10 USD (2007 resolution; current fee not verified)
“for ucc-regulated activities, a certificate of compliance issued by the uniform construction code official(s) must be presented prior to issuance of a certificate of occupancy.”
On-lot sewage (septic) permitting for land inside Cooke township
“seo – vince c. elbel. rates established under resolution 2018-07.”
New construction or additions on lots inside Cooke township
“a. no permit will be issued for new construction or additions unless a valid sewage permit adequate for the final structure has been issued.”
Agricultural land divisions exempt from Cooke township subdivision regulations (exemption from subdivision rules only; no building-permit exemption found)
minimum parcel size: > 10 acres (agricultural division exemption; no new street or easement of access)
“provided, however, that divisions of land for agricultural purposes in parcels of more than ten acres, not invloving any new street or easement of access, shall be exempt.”
Division of land inside Cooke township
“section 33. no lot in a subdivision may be sold and no building may be erected in a subdivision unless and until a subdivision plan has been approved and recorded.”
New or relocated driveways entering a Cooke township road
“a. prior to the new construction (or relocation) of any driveway that enters or exits to a township road, or any inadequate existing driveway, a new culvert pipe shall be installed.”
New construction and substantial improvements in identified floodplains and within 50 feet landward of a watercourse top-of-bank in Cooke township
setback from watercourse top-of-bank: >= 50 feet (unless DEP regional office permit obtained)
“c. no new construction or substantial improvements to existing structures shall be located within the area measured fifty (50) feet landward from the top-of-bank of any watercourse, unless a permit is obtained from the department of environmental protection regional office.”
Building and township valuation permit fees for construction inside Cooke township
building/valuation permit fee, projects over $500 to under $1,000: 20 USD (small projects; 2019 resolution) · building/valuation permit fee, projects at $1,000: 25 USD (2019 resolution) · building/valuation permit fee, each additional $1,000: 5 USD (2019 resolution)
“twenty ($20.00) dollars for small projects costing greater than five hundred ($500.00) dollars, but less than one thousand ($1000.00) dollars.”
Building permit application process in Cooke township
decision deadline: 10 working days (after filing a complete and properly prepared application)
“h. the township shall, within ten working days after the filing of a complete and properly prepared application, either issue or deny a permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Cooke Township or Cumberland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Cooke Township publishes no rule on the point, not that none exists. Cumberland County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Cooke Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.