Columbia County, Pennsylvania
South Centre Township is a township in Columbia County, Pennsylvania. South Centre Township adopts its own zoning, so inside its limits South Centre Township’s rules apply, not the county’s. 12 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Columbia County page.
Land inside South Centre Township, Columbia County, Pennsylvania.
“This Zoning Ordinance shall become effective five (5) days after the adoption by the Board of Supervisors of the Township of South Centre, Columbia County, Pennsylvania.”
Proposed construction or development entirely or partly within an identified floodplain area inside South Centre Township.
“If any proposed construction or development is located entirely or partially within any identified floodplain area, applicants for Zoning Permits shall provide all the necessary information”
South Centre Township zoning filing fees.
“Filing fee amounts shall be established by a resolution of the Township Board of Supervisors.”
Zoning permits for construction, alteration, or changed structure or lot use inside South Centre Township.
“Persons desiring to undertake the construction, alteration, or to change the use of any structure or lot shall apply to the Zoning Officer for a Zoning Permit”
South Centre Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction or building work inside South Centre Township subject to the Pennsylvania UCC.
“The UCC requires property owners to obtain a construction or building permit before starting any work.”
Building projects inside South Centre Township under Pennsylvania's statewide UCC.
“The Pennsylvania Uniform Construction Code (UCC) regulates the codes and standards of building projects in the Commonwealth.”
Covered residential and commercial construction, systems work, and manufactured or industrialized housing projects inside South Centre Township.
“Inspections are also necessary in several cases, including construction or changes to commercial or residential buildings”
A building or facility inside South Centre Township subject to the Pennsylvania UCC.
“A UCC certificate of occupancy must be issued before a building or facility can be used.”
Dwellings over business where allowed by the Township zoning ordinance.
minimum floor area per dwelling unit: >= 750 square feet
“Such dwellings shall be designed as living quarters having at least seven hundred and fifty (750) square feet of floor area per dwelling unit”
Lots in South Centre Township's R Residential District.
maximum principal-and-accessory building coverage: <= 25 percent
“Coverage of a lot area by all principal and accessory buildings shall be not more than twenty-five percent (25%).”
Cultivation of crops and farm-use buildings in South Centre Township's A Agricultural District.
“Cultivation of Crops (no permit required);”
Commercial operations in South Centre Township's CI Commercial Industrial District.
minimum distance from public street intersection: >= 60 feet · points of ingress and egress per abutting street: <= 1
“Not more than one point of ingress and egress shall be allowed on any abutting street.”
We looked and could not find an official answer yet. Silence is not permission; ask South Centre Township or Columbia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that South Centre Township publishes no rule on the point, not that none exists. Columbia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in South Centre Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.