Bolthole Index

Chester County, Pennsylvania

Building permits, zoning and septic in New London Township, PA

New London Township, Pennsylvania requires building permits for residential work covered by the Uniform Construction Code and administers its own zoning.12 In Chester County, septic permits inside New London Township come from the Chester County Health Department, which also requires well-construction permits.34 RV restrictions are confirmed for identified floodplain areas; ask the Township about residential RV use elsewhere.5

At a glance

Building permits
Required for UCC-covered residential construction; start with the Township office16
Zoning
Township zoning districts and conservation overlays apply7
Septic permits
Chester County Health Department; installation, repair and modification require approval38
RV living
Prohibited in identified floodplain areas unless a variance is obtained; ask the Township about other locations5
Tiny homes
Distinct tiny-home occupancy rules unconfirmed; accessory dwellings have a 400-square-foot minimum9
Residential lot size
R-Residential detached homes ordinarily need 1 acre of net lot area; conditional reductions exist10
Wells
County construction permit required; application by an appropriately licensed contractor4
Owner-builder
State contractor-license relief does not establish a local building-permit exemption111

Who to call

Building permits

New London Township Office

Starting contact for Township building and zoning applications, fee schedules and driveway forms

(610) 869-8658

[email protected]

902 State Road, West Grove, PA 19390

Building permits

New London Township Building Permit Process

Published workflow for zoning approval, building-related applications and driveway access

Septic permits

Chester County Health Department — Sewage & Water

On-lot sewage and well construction permits inside New London Township

610-344-6225

601 Westtown Road, Suite 295

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in New London Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does New London Township have zoning, lot-size rules and setbacks?

New London Township has municipal zoning, with R-Residential, C-Commercial, LI-Limited Industrial, NLV-New London Village and I-Institutional base districts, plus flood-hazard, steep-slope and riparian-buffer overlays.7 Ask the Township to identify the parcel’s district and overlays before choosing a house site.2

For single-family detached homes in the R-Residential District, the ordinary minimum net lot area is 1 acre, with a conditional reduction to 0.75 acres tied to water, sewage, stormwater, conservation and common-open-space requirements.10 R-Residential front setbacks are 40 feet along residential roads, 50 feet along collector roads and 60 feet along arterial roads; side yards are 25 feet each and the rear yard is 50 feet.12 Maximum building coverage is 15% and maximum impervious coverage is 25% of net lot area in that district.13

Do you need a building permit in New London Township, and who handles it?

New London Township residential construction covered by Pennsylvania’s Uniform Construction Code requires a building permit before construction, enlargement, alteration, repair, moving, demolition or a change of occupancy, subject to applicable exclusions.1 Start with the New London Township Office: the Township publishes building and electrical applications, a building-permit workflow, zoning applications and its permit-cost schedule.6

The Township’s workflow says a change in use, creation of a new use or expansion of an existing use requires a zoning permit.14 Township zoning-chapter fees are set by Board of Supervisors resolution, available to the public and payable in advance; request the applicable schedule before submitting.15 Pennsylvania’s owner-builder contractor-license provisions do not establish an exemption from the residential building-permit requirement; ask the Township about local contractor requirements.111

How do septic and well permits work inside New London Township?

Chester County Health Department administers on-lot sewage permitting inside New London Township; installing, repairing or modifying a system requires a septic permit.38 The application process requires an acceptable percolation test and acceptable test pits, so arrange the site evaluation with the Health Department before committing to a house layout.8 No part of the system may be covered before final inspection and written approval from the County’s Sewage Enforcement Officer.16

Chester County also requires construction permits for private water-supply wells, geothermal wells, monitoring wells and test wells, with applications made by appropriately licensed contractors.4 For new construction, a well-permit application requires public sewerage or a valid sewage permit.4 An accessory dwelling must connect to an available community or public sewage system.17

Can you live in an RV or tiny home in New London Township?

In New London Township’s identified floodplain areas, recreational vehicles are prohibited unless a variance is obtained.5 A variance carries additional duration, licensing and highway-readiness conditions in the specified flood zones; ask the Township to evaluate the parcel and proposed RV use before relying on that exception.5 We could not confirm residential RV occupancy outside the floodplain or a distinct tiny-home occupancy category; ask the Township zoning office about the proposed location, foundation and duration.6

New London Township’s accessory-dwelling rules require at least 400 square feet of gross habitable area and cap the unit at 33% of the principal dwelling’s gross habitable area.9 Those accessory-unit limits do not establish a townshipwide minimum for every new principal home.9 Manufactured homes are also prohibited in identified floodplain areas unless a qualifying variance is obtained, followed by foundation, elevation, anchoring and installation requirements.18

Building a home in New London Township: what are the steps?

  1. Ask the Township to confirm the zoning district, conservation overlays, allowed use and house setbacks for the parcel; flood-hazard construction or development requires zoning approval before commencement.71219
  2. Contact Chester County Health Department for sewage testing and septic approval, then arrange the well application through a licensed contractor where needed.84
  3. Submit the Township’s applicable zoning and building applications and request the current fee schedule.615
  4. Resolve driveway access: the Township workflow requires a driveway permit for new access to a public street or driveway expansion, and work on state highway land requires PennDOT approval.1420
  5. Schedule required construction inspections and obtain the building code official’s certificate of occupancy before using a UCC-covered residential building.2122

What stays with Chester County, and what should you check before buying?

Inside New London Township, Chester County Health Department remains the septic and well permitting contact; Township zoning approval does not replace those approvals.34 For land elsewhere in the county, consult the Chester County guide and identify the municipality whose zoning ordinance applies.23

For a New London Township homestead, agricultural use requires at least 4 acres, while intensive agricultural operations require at least 25 acres of net tract area.24 Farm dwellings and their accessory buildings require at least 50 feet from property lines; barns and similar agricultural structures generally require 100 feet from property lines, street rights-of-way or streams.25 Pennsylvania excludes qualifying nonhabitable agricultural buildings from the Construction Code Act, but municipal land-use and other applicable requirements can still apply.26 Ask the Township to review the actual farm use and structure before treating a barn as exempt.26

Watch-outs

  • New London Township’s RV floodplain restriction does not confirm permission to live in an RV on other land; ask the Township zoning office about the specific parcel.56
  • The 400-square-foot accessory-dwelling minimum is not a confirmed minimum for all principal homes in New London Township.9
  • New London Township flood-hazard development requires a zoning permit before commencement; check the overlay before choosing a building site.19

Sources

  1. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  2. New London Township Subdivision & Land Development and Zoning Ordinances (New London Township), quoted and re-checked
  3. Sewage Permitting (New London Township), quoted and re-checked
  4. Chester County Health Department Rules and Regulations, quoted and re-checked
  5. §1-1121 Special Requirements for Recreational Vehicles (New London Township), quoted and re-checked
  6. New London Township Office (newlondontwp.net)
  7. Compilation of Land Use Ordinances of the Township of New London, Chapter 1: Zoning (New London Township), quoted and re-checked
  8. Application and Permit Procedure for On Lot Sewage Systems (New London Township), quoted and re-checked
  9. §1-1429 Accessory Dwelling Units (New London Township), quoted and re-checked
  10. §1-404 Area and Bulk Regulations (New London Township), quoted and re-checked
  11. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  12. §1-404 Area and Bulk Regulations (New London Township), quoted and re-checked
  13. §1-404 Area and Bulk Regulations (New London Township), quoted and re-checked
  14. New London Township Building Permit Process (newlondontwp.net)
  15. Compilation of Land Use Ordinances of the Township of New London, Chapter 1: Zoning (New London Township), quoted and re-checked
  16. Application and Permit Procedure for On Lot Sewage Systems, quoted and re-checked
  17. §1-1429 Accessory Dwelling Units (New London Township), quoted and re-checked
  18. §1-1120 Special Requirements for Manufactured Homes (New London Township), quoted and re-checked
  19. Compilation of Land Use Ordinances of the Township of New London, Chapter 1: Zoning (New London Township), quoted and re-checked
  20. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  21. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  22. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  23. Planning in Pennsylvania, quoted and re-checked
  24. §1-1435 Agricultural Regulations (New London Township), quoted and re-checked
  25. §1-1435 Agricultural Regulations (New London Township), quoted and re-checked
  26. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for New London Township

New London Township’s own rules

  • Local zoningPresent

    All land inside New London Township subject to the Township zoning ordinance.

    • The Township zoning map establishes district boundaries.
    “For the purposes of this Chapter, New London Township is hereby divided into base zoning districts which shall be designated as follows:”
  • Zoning districtsPublished

    Zoning districts and overlays inside New London Township.

    • Base districts are R-Residential, C-Commercial, LI-Limited Industrial, NLV-New London Village, and I-Institutional.
    • Overlay districts include Flood Hazard, Steep Slope Conservation, and Riparian Buffer Conservation.
    “For the purposes of this Chapter, New London Township is hereby divided into base zoning districts which shall be designated as follows: A. Part 4: R-Residential District B. Part 7: C-Commercial District C. Part 8: LI-Limited Industrial District D. Part 9: NLV-New London Village District E. Part 10: I-Institutional District”
  • Minimum dwelling sizeSpecified

    Accessory dwelling units inside New London Township.

    • The 400-square-foot minimum applies to an accessory dwelling unit.
    • The maximum is not more than 33% of the principal dwelling's gross habitable area.

    minimum gross habitable area: >= 400 square feet (Accessory dwelling units.)

    “The minimum size of an accessory dwelling shall be 400 square feet”
  • Minimum lot sizeDistrict specific (with conditions)

    Single-family detached dwellings in the R-Residential District inside New London Township.

    • The ordinary minimum net lot area is 1 acre.
    • An alternative 3/4-acre opportunity exists when the stated central-water, sewage, stormwater, conservation, and common-open-space conditions are met.

    minimum net lot area: 1 acre (Lots meeting §1-404.4 may be reduced to 3/4 acre.)

    “Minimum net lot area 1 acre. […] Opportunities for Reduction in Residential Net Lot Area. Regardless of the net tract area or number of residential lots proposed, the net lot area of proposed lots may be reduced to not less than 0.75 acres when the following conditions are met.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Agricultural uses inside New London Township.
      “To qualify as agricultural use, the minimum lot area shall be 4 acres. […] Any intensive agricultural operations shall have a minimum net tract area of twenty-five (25) acres.”
  • SetbacksSpecified

    Single-family detached dwellings in the R-Residential District inside New London Township.

    • Front building setback is 40 feet from residential roads, 50 feet from collector roads, and 60 feet from arterial roads.
    • Side yards are 25 feet each and rear yard is 50 feet.
    • Accessory structures require a 10-foot side and rear setback.

    front setback residential road: 40 feet · front setback collector road: 50 feet · front setback arterial road: 60 feet · minimum side yard each: 25 feet · minimum rear yard: 50 feet

    “Minimum building setback line: a. Residential road frontage 40 feet. b. Collector road frontage 50 feet. c. Arterial road frontage 60 feet. D. Minimum side yard 25 feet each. E. Minimum rear yard 50 feet.”
    One more reviewed finding on this topic
    • Specified — Farm dwellings and agricultural buildings inside New London Township.
      “Farm dwellings and buildings accessory thereto shall not be constructed less than fifty (50) feet from all property lines.”
  • Lot coverageSpecified

    Single-family detached dwellings in the R-Residential District inside New London Township.

    • Maximum building coverage is 15% of net lot area.
    • Maximum impervious surface is 25% of net lot area.

    maximum building coverage: <= 15 percent of net lot area · maximum impervious surface: <= 25 percent of net lot area

    “Maximum building coverage 15% of net lot area”
  • Living in an RVLimited

    Recreational vehicles within an Identified Floodplain Area inside New London Township.

    • A variance may be obtained.
    • After a variance, RVs in Zones A, Al-30, AH, and AE must be on site fewer than 180 consecutive days and fully licensed and ready for highway use.

    maximum consecutive days after variance: < 180 days (Applies in Zones A, Al-30, AH and AE.)

    “recreational vehicles shall be prohibited.”
  • Camping on your landLimited

    Overnight outdoor camping on premises of a public gathering inside New London Township.

    • Permanent residents and their guests are excepted.
    • Overnight camping or other facilities require Township approval under the public-gathering permit process.
    “unless overnight camping or other facilities were approved by the Township”
  • Manufactured homesLimited

    Manufactured homes within an Identified Floodplain Area inside New London Township.

    • A variance may be available under the flood-hazard variance provisions.
    • If permitted after variance, foundation, elevation, anchoring, equipment, and installation requirements apply.
    “Within any Identified Floodplain Area, manufactured homes shall be prohibited. If a variance is obtained in accordance with the criteria in §1-1115 and §1-1116 and Part 19, then the following provisions apply.”
  • Who permits septicCounty

    On-lot sewage permitting inside New London Township.

    • The Chester County Health Department administers sewage permitting and applies Chester County and Pennsylvania requirements.
    “The Chester County Health Department is responsible for preventing or minimizing public health hazards caused by malfunctioning on-lot sewage disposal systems.”
  • Septic permitRequired

    Installation, repair, or modification of an on-lot sewage disposal system inside New London Township.

    • The application process requires at least one acceptable percolation test and at least two acceptable test pits.
    • The permit is subject to County Health Department rules in effect when filed.
    “Permits are required for the installation, repair or modification”
  • Off-grid sanitationLimited

    Individual on-site sewage disposal systems inside New London Township.

    • An on-lot system may be used only under the Chester County Health Department permitting and inspection process.
    • Accessory dwelling units must connect to a community or public sewage system when available.
    “Permits are required for the installation, repair or modification of on-lot sewage disposal systems.”
  • Mandatory utility hookupSewer (with conditions)

    Accessory dwelling units inside New London Township where a community or public sewage system is available.

    • The accessory dwelling unit must connect to and be served by the available community or public sewage system.
    “shall be connected to and served by such system.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside New London Township.

    • The Township publishes a Chapter 2 Subdivision and Land Development ordinance.
    “Chapter 2 Subdivision and Land Development”
  • Building in a floodplainRequired

    Construction, development, use, or activity subject to the Flood Hazard District inside New London Township.

    • A zoning permit is required before commencement.
    • Flood-hazard district use regulations, special exceptions, variances, and applicable state requirements also apply.
    “A zoning permit shall be required prior to commencement”
  • Permit feesPublished (with conditions)

    Permits issued under the New London Township zoning chapter.

    • Fees are determined by Board of Supervisors resolution.
    • The fee schedule must be made available to the general public.
    • Fees must be paid in advance.
    “All permit fees under this Chapter shall be determined by resolution of the Board of Supervisors, and a schedule of such shall be made available to the general public. Fees shall cover the cost of administrating this Chapter. Permit fees shall be paid in advance in accordance with such fee schedule.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask New London Township or Chester County directly.

  • Owner-builder exemption — Owner-builder exemption for construction inside New London Township.
  • Tiny homes — Tiny-home occupancy inside New London Township.
  • Well permit — Private wells inside New London Township.
  • Agricultural exemption — Agricultural construction exemption from building or zoning permits inside New London Township.
  • Driveway access — Driveway access for development inside New London Township.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that New London Township publishes no rule on the point, not that none exists. Chester County’s page lists the county offices to call.

← All of Chester County: county rules, score and offices