Upper Yoder Township is a township in Cambria County, Pennsylvania. Upper Yoder Township adopts its own zoning, so inside its limits Upper Yoder Township’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Cambria County page.

Answers from the rulebook for Upper Yoder Township

Upper Yoder Township’s own rules

  • Building permitRequired

    A building or structure erected, added to, or structurally altered in Upper Yoder Township.

    • A permit may not issue where the activity does not conform to the ordinance, except after a variance or special exception by the Board of Adjustment.
    “No building or structure shall be erected, added to, or structurally altered until a permit therefore has been issued by the Zoning Officer.”
  • Building code adoptedAdopted (with conditions)

    Buildings and structures in Upper Yoder Township.

    • The Township states that it entered an agreement under which the Cambria-Somerset Council of Governments is authorized to administer and enforce the IBC and Township Zoning Ordinance.
    “On January 23, 2003, Upper Yoder Township adopted the “International Building Code Enforcement Ordinance.””
  • InspectionsRequired

    Building projects for which a certificate of occupancy is required in Upper Yoder Township.

    • The two stated inspections are one after foundation completion and one when construction is approximately 75 percent complete; swimming pools and garages also require two construction-period inspections.

    required inspections: 2 inspections (One when foundation is completed and one when the building is approximately 75% completed.)

    “There must be 2 inspections made of any building project; one when the foundation is completed and one when the building is approximately 75% completed.”
  • Certificate of occupancyLimited

    Buildings or structures for which the Township zoning ordinance requires a certificate of occupancy.

    • The certificate must be applied for at the same time as the building-permit application and is issued within 10 days after erection or alteration and inspection if the building or use accords with all codes and ordinances.

    issuance period: <= 10 days (After erection or alteration and inspection, if the building or use is in accordance with all codes and ordinances.)

    “Whenever a certificate of occupancy is required, it shall be applied for at the same time as the application for a building permit.”
  • Local zoningPresent (with conditions)

    Land within Upper Yoder Township, Cambria County, Pennsylvania.

    • The Township ordinance index identifies Zoning Ordinance No. 287-A as amended December 19, 2024; district-specific requirements must be checked against that amendment.
    “This ordinance shall be known as the Upper Yoder Township Zoning Ordinance, and the map referred to herein and made a part of this ordinance shall be known as the Zoning Ordinance Map.”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Upper Yoder Township.

    • The zoning ordinance and map are on file at Township offices; Ordinance 287-A, amended December 19, 2024, is listed by the Township.
    “The Township of Upper Yoder is hereby classified and divided into 12 Districts designated as follows:”
  • Minimum lot sizeSpecified

    One-family detached dwellings in the zoning district governed by the cited residential schedule in Upper Yoder Township.

    • The cited schedule also requires 150 feet of width at the building line; verify current district designation and Ordinance 287-A amendments before parcel-level use.

    minimum lot area: >= 43560 square feet (One-family detached dwelling, convent, monastery, rectory, or parish house.) · minimum width at building line: >= 150 feet (One-family detached dwelling, convent, monastery, rectory, or parish house.)

    “One-family detached dwelling, convent, monastery, rectory, or parish house – a minimum of 43,560 square feet and a width at the building line of 150 feet.”
  • SetbacksSpecified

    Buildings, structures, or enlargements in the zoning district governed by the cited residential schedule in Upper Yoder Township.

    • Interior and corner lots have combined-side-yard requirements; a lot less than 150 feet wide at the building line has a separate stated side-yard rule.

    minimum front yard: >= 75 feet · minimum side yard each side: >= 20 feet (Combined side-yard requirements also apply.)

    “Front yard - not less than 75 feet Side yard - on each side, not less than 20 feet.”
  • Building heightSpecified

    One-family detached dwellings in the zoning district governed by the cited residential schedule in Upper Yoder Township.

    • Different limits are stated for churches, steeples or towers, accessory buildings, and other permitted buildings.

    maximum height: <= 35 feet (One-family detached dwelling; alternatively 2-1/2 stories.)

    “One-family detached dwelling – 35 feet or 2-1/2 stories”
  • Living in an RVLimited

    Recreational vehicles in zoning districts containing the cited accessory-use provision in Upper Yoder Township.

    • The cited provision allows parking only when recreational vehicles are not used as dwellings; other district provisions and the 2024 amendment may apply.
    “Parking of accessory vehicles, such as boats, boat trailers and house trailers, or campers, not used as dwellings on the premises”
  • Manufactured homesLimited

    Manufactured home parks in the R-6 Residential District of Upper Yoder Township.

    • The ordinance restricts manufactured home parks to the R-6 Residential District; its park-restriction section sets a five-acre minimum park area.

    minimum manufactured-home park area: >= 5 acres (Applies to every manufactured home park hereafter developed.)

    “Manufactured Home Parks shall be permitted in an R-6 Residential District only. B. Lot Area – The minimum area for every manufactured home park hereafter developed shall be 5 acres.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Upper Yoder Township.

    • Plans are reviewed by the Township Planning Commission, Township Engineer, and Township Supervisors; applicable fees apply and approved plans receive signatures for recording at Cambria County Court House if applicable.
    “This includes any land development projects as well as any subdivision of land.”
  • Permit feesVariable (with conditions)

    Zoning applications, building permits, and occupancy certificates in Upper Yoder Township.

    • Fees are established by Board of Supervisors resolution; application fees are due at application, while building-permit and occupancy fees are due at issuance. A refused building-permit application forfeits its application fee, and renewal or extension is charged at the original permit rate.
    “The application and building permit fees [...] shall be established by Resolution adopted by the Board of Supervisors.”
  • Permit processPublished (with conditions)

    Building-permit and certificate-of-occupancy applications in Upper Yoder Township.

    • Applications must be accompanied by required fees and lot plans, plus other district-regulation data; the Zoning Officer may require a property survey where property lines are not clearly identifiable.

    site or plot plan copies: 2 copies (Submitted with all building-permit applications.)

    “There shall be submitted with all applications for building permits 2 copies of a site or plot plan drawn to scale”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Upper Yoder Township or Cambria County directly.

  • Owner-builder exemption — Owner-built residential construction in Upper Yoder Township.
  • Minimum dwelling size — Single-family dwellings inside Upper Yoder Township.
  • Camping on your land — Temporary camping on private land inside Upper Yoder Township.
  • Tiny homes — Tiny-home occupancy inside Upper Yoder Township.
  • Accessory dwellings — Accessory dwelling units inside Upper Yoder Township.
11 more unanswered
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Upper Yoder Township publishes no rule on the point, not that none exists. Cambria County’s page lists the county offices to call.

← All of Cambria County: county rules, score and offices