Butler County, Pennsylvania
Clearfield Township is a township in Butler County, Pennsylvania. Clearfield Township has not adopted its own zoning; the county’s or state’s rules apply inside its limits. Septic permits inside Clearfield Township come from Clearfield Township. 11 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Butler County page.
Construction, relocation, enlargement, alteration, or demolition of residential dwellings and commercial buildings inside Clearfield Township.
“A permit is required whenever an owner or agent intends to construct, move, re-locate, enlarge, alter, or demolish any residential dwelling. This includes Commercial buildings.”
Work inside Clearfield Township that triggers PA UCC inspection requirements.
“No, but any change of trusses requires UCC inspections.”
Land inside Clearfield Township, Butler County, Pennsylvania.
“No, but there is a Subdivision and Land Development Ordinance we follow.”
Township zoning districts inside Clearfield Township.
“No, but there is a Subdivision and Land Development Ordinance we follow.”
Buildings and structures inside Clearfield Township.
property-line setback: 20 feet (All buildings or structures.) · right-of-way setback: 40 feet (All buildings or structures; applies to all rights of way and road rights of way.)
“All buildings or structures are required to be 20’ from all property lines and 40’ from all Right of Ways and Road Right of Ways.”
Sewage-system questions and applications for land inside Clearfield Township.
“To obtain a sewage application, call the Township Office at 724-283-7701. For questions regarding sewage, call Sewage Enforcement Officer: Patrick West: 724-996-4753”
New sewage testing and repairs to existing sewage systems inside Clearfield Township.
“Sewage applications are required for all new testing and repairs to existing systems.”
Subdivision and land development inside Clearfield Township.
“No, but there is a Subdivision and Land Development Ordinance we follow.”
Construction, development, or location of a driveway providing access to a public street inside Clearfield Township.
“Any person desiring to construct, develop or locate a driveway shall first obtain a permit from the Township.”
Township building, UCC, occupancy, driveway, sewage, and listed permit applications inside Clearfield Township.
residential house/modular/mobile UCC building permit: 100 USD (Additional UCC fee may apply.) · residential occupancy permit: per 100 USD (Per application.) · driveway permit: per 85 USD (Per application.) · single-family-residence sewage permit: 1035 USD (Other rates are per SEO schedule.)
“Driveway Permit $85.00 - per application (Application fee is non-refundable and expires 1 year) Sewage Permits $1,035.00 Single Family Residence Other rates as per SEO schedule”
Sewage-permit application process inside Clearfield Township.
“To obtain a sewage application, call the Township Office at 724-283-7701.”
We looked and could not find an official answer yet. Silence is not permission; ask Clearfield Township or Butler County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Clearfield Township publishes no rule on the point, not that none exists. Butler County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Clearfield Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.