Borough of Troy, Pennsylvania requires a building permit for residential work covered by the Pennsylvania Uniform Construction Code.1 Troy, in Bradford County, also has borough zoning enforced by its zoning officer.2 Borough hall provides zoning-review applications and directs building-permit inquiries to Code Inspections; on-lot septic permits, where applicable, come from the responsible local sewage agency.34
At a glance
- Building permit
- Required for UCC-regulated residential work1
- Zoning
- Borough zoning; confirm the parcel’s district25
- Septic
- Local agency approval for applicable on-lot systems4
- R-A lot coverage
- Building area cannot exceed 33.33% of lot area6
- R-A setbacks
- Detached homes: front 30 feet; each side 6 feet, combined 16 feet; rear 15 feet, with exceptions7
- Occupancy
- Certificate of occupancy required for UCC-regulated residential buildings8
Who to call
Zoning
Borough zoning-review applications, application submission and referral for building-permit information; ask for the zoning officer and current sewage enforcement contact.
49 Elmira Street Troy, PA 16947
Septic permits
Pennsylvania DEP Sewage Enforcement Officer Program
State sewage-enforcement certification information and active SEO lookup; local sewage agencies issue applicable on-lot permits.
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Borough of Troy means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Borough of Troy, PA?
A new home in Borough of Troy needs a building permit when the work is governed by Pennsylvania’s Uniform Construction Code; the residential rule also covers regulated alterations and building systems.1 Troy Borough’s application page lists a Zoning Review Application for building permits and directs readers to Code Inspections for building-permit information.3 Return completed borough applications to borough hall with any applicable fees for final approval.3 Ask the Borough Office to confirm the current building-code official and fee schedule for your project.3
Does Borough of Troy have zoning and residential setbacks?
Borough of Troy has local zoning, enforced by the borough zoning officer, with appeals to the zoning hearing board.2 Troy’s districts are R-A residence, R-B residence, C business and I manufacturing and industrial; establish the parcel’s district before designing a home.5 In R-A, building area cannot exceed 33.33% of lot area.6 For an R-A detached dwelling, the front yard is at least 30 feet, each side yard at least 6 feet with both totaling at least 16 feet, and the rear yard at least 15 feet, subject to the stated exceptions.7 A rear yard may be 12 feet on a lot less than 150 feet deep; narrow lots and taller buildings also have special provisions.7
How do septic permits work inside Borough of Troy?
For an applicable on-lot sewage system in Borough of Troy, the responsible local or joint local agency issues the septic permit; the state framework does not make the county planning office the septic permit counter.4 Pennsylvania requires local-agency approval before installing or contracting for construction of an on-lot system, subject to statutory exceptions.9 Troy Borough provides a Water/Sewer Account Application; ask borough hall whether the parcel must use public sewer and, if not, which sewage enforcement officer handles it.3 A composting toilet for a new residence does not remove the need for approved washwater or excess-liquid disposal.10
Can you live in an RV or tiny home in Borough of Troy?
We could not confirm permission for residential RV use, temporary camping while building, or tiny-home occupancy in Borough of Troy; ask the borough zoning officer about the proposed use and parcel before buying.2 Troy’s published zoning districts distinguish residential, business and industrial land, so an RV or tiny-home proposal needs a district-specific answer.5 A small residential building governed by the UCC still needs a certificate of occupancy before use.8 For an off-grid dwelling, Pennsylvania’s sanitation rules require approved disposal of washwater and excess liquid as well as the toilet arrangement.10
Building a home in Borough of Troy: what are the steps?
- Ask the borough zoning officer to confirm the district and whether the proposed dwelling fits Troy’s zoning requirements.25
- Obtain the borough’s zoning-review application and return completed borough applications to borough hall with applicable fees.3
- Resolve public-sewer service with borough hall, or obtain the required local-agency on-lot sewage approval before contracting for septic construction.39
- Obtain the UCC building permit before beginning regulated construction and arrange the required inspections.11
- Keep permitted work accessible for inspections and obtain the residential certificate of occupancy before moving in.128
What should you check before buying in Borough of Troy?
Ask Troy Borough to determine whether proposed development is in a Special Flood Hazard Area: Pennsylvania municipalities review and issue or deny permits for development in those areas.13 A driveway built or changed on state highway land, or connected to a PennDOT drainage facility, needs a PennDOT highway occupancy permit.14 Subdivision review depends on the applicable municipal ordinance and county review provisions, so ask borough hall about Troy’s subdivision application before dividing land.153 For land outside borough limits, use the Bradford County guide and confirm the actual municipality’s zoning rather than applying Troy’s borough rules.16
Watch-outs
- Troy’s R-A setbacks and lot-coverage limits are district-specific; do not apply them to R-B, C or I parcels.76
- We could not confirm borough minimum dwelling size, RV occupancy or tiny-home permission; ask the Troy zoning officer before committing to a design.2
- Confirm public water and sewer availability and connection requirements with the Borough Office before assuming a private well or septic system is an option.3
Sources
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- Troy Borough Code Chapter 27 Zoning, Parts 1-3 (districts, R-A residence districts) (Borough of Troy), quoted and re-checked
- Troy Borough Office (troyborough.com)
- Municipal On Lot Sewage Service Areas | Commonwealth of Pennsylvania, quoted and re-checked
- Troy Borough Code Chapter 27 Zoning, Parts 1-3 (districts, R-A residence districts) (Borough of Troy), quoted and re-checked
- Troy Borough Code Chapter 27 Zoning, Parts 1-3 (districts, R-A residence districts) (Borough of Troy), quoted and re-checked
- Troy Borough Code Chapter 27 Zoning, Parts 1-3 (districts, R-A residence districts) (Borough of Troy), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
- 25 Pa. Code § 73.65. Recycling toilet, incinerating toilet or composting toilet (Pennsylvania statewide rule), quoted and re-checked
- Apply for a Uniform Construction Code Building Permit (Pennsylvania statewide rule), quoted and re-checked
- Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
- PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
- Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
- Pennsylvania Municipalities Planning Code (Pennsylvania statewide rule), quoted and re-checked
- Local Registrations, Permits, Zoning (Pennsylvania statewide rule), quoted and re-checked
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.