Zoning, building permits and septic rules in Borough of Hollidaysburg, Pennsylvania

Borough of Hollidaysburg is a borough in Blair County, Pennsylvania. Borough of Hollidaysburg adopts its own zoning, so inside its limits Borough of Hollidaysburg’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Blair County page.

Answers from the rulebook for Borough of Hollidaysburg

Borough of Hollidaysburg’s own rules

  • Local zoningPresent

    Land inside Hollidaysburg borough, Blair County

    • Borough site says the online code reflects updates only through May 11, 2001 (per page; not re-verified); later amendments exist (e.g. Ord. 880, 881, 894, 913).
    “this chapter shall be known and may be cited as the "hollidaysburg borough zoning ordinance,"”
  • Zoning districtsPublished

    Zoning districts inside Hollidaysburg borough

    • District list from the chapter's table of contents; also includes C-1, C-2, C-3, I-1, I-2, RB, Highland Hall special district, and historic resources and floodplain overlays.
    “cr conservation/recreation districts r-1 single family residential districts r-2 general residential districts r-3 general residential districts planned residential districts”
  • Minimum lot sizeDistrict specific (with conditions)

    Single-family lots in the R-2 General Residential district inside Hollidaysburg borough

    • Two-family 3,000 sq ft per dwelling unit; townhouse 2,500; multifamily 1,800; other principal uses 10,000 sq ft.
    • Lot width single/two-family 50 ft.

    minimum lot area single-family: >= 6000 sq ft

    “(1) single-family - 6,000 sq. ft. (2) two-family - 3,000 sq. ft./dwelling unit.”
  • SetbacksDistrict specific (with conditions)

    Single-family dwellings in the R-1 district inside Hollidaysburg borough

    • All other uses: front 40 ft, side 15 ft per yard, rear 30 ft.

    front yard: >= 30 ft · side yards total: >= 24 ft (none less than 10 ft) · rear yard: >= 30 ft

    “use front side rear single family 30 ft. 2 yards totaling 24 ft.; none less than 10 ft. 30 ft. all other uses 40 ft. 15 ft./yard 30 ft.”
  • Lot coverageDistrict specific (with conditions)

    R-1 district inside Hollidaysburg borough

    maximum lot coverage: <= 30 percent

    “maximum lot coverage. 30% for all uses. e. maximum height. principal structure - 35 feet or two and 2 1/2 stories; accessory structure - see part 5.”
  • Building heightDistrict specific (with conditions)

    Principal structures in the R-1 district inside Hollidaysburg borough

    • Accessory structures governed by Part 5.
    • R-2 principal structure limit is 40 feet.

    maximum principal structure height: <= 35 ft (or two and 2 1/2 stories)

    “maximum height. principal structure - 35 feet or two and 2 1/2 stories; accessory structure - see part 5.”
  • Mandatory utility hookupSewer (with conditions)

    New buildings on premises accessible to the Hollidaysburg public sanitary sewer

    • Operative text of §122 was not opened; only the table-of-contents heading and the definition of accessible were quoted.
    • Water connection rule not found (Chapter 26).

    accessible distance via private sewer: <= 100 ft

    “all persons owning any premises with the borough accessible to the public sanitary sewerage system upon which a building is hereinafter erected shall, at the time of erection of such building, and at their own expense, make the connection with the public sanitary sewerage system.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Hollidaysburg borough

    • Separate Chapter 22 (Subdivision and Land Development) exists; its text was not opened.
    “in case of a subdivision or combination of lots, no lot shall be created which does not meet the requirements of this chapter.”
  • Permit processPartial

    Zoning permits inside Hollidaysburg borough

    • Only the zoning permit step was read; building-code permit process not found.
    “a zoning permit shall be obtained from the zoning officer before any person may: (1) occupy or use any vacant land or structure.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Borough of Hollidaysburg or Blair County directly.

  • Building permit — Building permits inside Hollidaysburg borough
  • Owner-builder exemption — Owner-builder exemption inside Hollidaysburg borough
  • Building code adopted — Building code inside Hollidaysburg borough
  • Inspections — Building inspection inside Hollidaysburg borough
  • Certificate of occupancy — Certificate of occupancy inside Hollidaysburg borough
16 more unanswered
  • Minimum dwelling size
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Borough of Hollidaysburg publishes no rule on the point, not that none exists. Blair County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Borough of Hollidaysburg means bringing your own water and power. The kit we’d start with: