Beaver County, Pennsylvania
Center Township is a township in Beaver County, Pennsylvania. Center Township adopts its own zoning, so inside its limits Center Township’s rules apply, not the county’s. Septic permits inside Center Township come from Center Township. 9 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Beaver County page.
Land within Center Township, Beaver County, Pennsylvania.
“Zoning Ordinance of the Township of Center, Ordinance No. 293. as amended”
On-lot sewage disposal proposed within Center Township.
“obtained from the Township Sewage Enforcement Officer.”
Proposed construction served by an on-lot sewerage treatment system in Center Township.
“If yes, attach copy of a permit for an on-site sewage disposal system obtained from the Township Sewage Enforcement Officer.”
Proposed construction using an on-lot sewerage treatment system in Center Township.
“Applicant intends to serve the proposed construction by an on-lot sewerage treatment system.”
Proposed construction whose premises are serviced or can be practicably accommodated by the Township Water Authority and Sanitary Authority systems.
“prior to occupancy, and as a condition of the Zoning Use and Compliance Certificate for which application is made, the premises shall be connected to said water distribution system.”
Minor and major subdivisions and land development within Center Township.
“Minor Subdivision Application for Minor Subdivision Minor Subdivision Review and Approval Process Checklist”
Proposed construction involving a driveway in Center Township.
“If driveway is to be constructed, attach a copy of the Township Driveway Permit Application as per requirements of the Township Ordinance No. 173, as amended.”
Published Township subdivision, land-development, zoning, grading, highway-occupancy, and driveway applications.
minor subdivision preliminary and final approval filing fee: 500 USD (Technology Fee $10.00 also listed.) · major subdivision preliminary and final approval filing fee: per 1000 USD (Per application; additional $225.00 per parcel and $10.00 technology fee listed.)
“Minor Subdivision (Preliminary and Final Approval) $500.00 Technology Fee $10.00 Major Subdivision (Preliminary and Final Approval) $1,000.00/application”
Township development, subdivision, land-development, grading, street-opening, and driveway applications.
“Planning Submission and Review Timeline Application Matrix Pre-Application Conference Permitting Guidelines”
We looked and could not find an official answer yet. Silence is not permission; ask Center Township or Beaver County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Center Township publishes no rule on the point, not that none exists. Beaver County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Center Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.