Wasco County, Oregon
Mosier is a city in Wasco County, Oregon. Mosier adopts its own zoning, so inside its limits Mosier’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Wasco County page.
Land inside Mosier city limits
“title 15 - zoning 15.01 introductory provisions 15.02 basic provisions and land use zones 15.03 supplemental provisions”
Zones inside Mosier city; only commercial (C) and industrial (I) confirmed
“the city of mosier has two business-related zones, c (commercial) and i (industrial).”
New construction inside Mosier city
“you will apply for a water/sewer connection and pay the sdc fees before you receive approval for your site development permit.”
Land divisions inside Mosier city
“title 16 - land divisions 16.01 general provisions and administration of land divisions 16.02 minimum improvements and design standards for land divisions 16.03 subdivisions - process and standards 16.04 partition”
New driveway connecting to a public street inside Mosier city
“construction of a driveway connecting to a public street within the city limits.”
City system development charges for new construction in Mosier
total SDC: 15118 USD (plus Mosier Bluffs water SDC $4,032 in that development)
“parks $1,495.00 water $3,866.00 stormwater $1,499.00 transportation $4,154.00 stormwater $4,104.00 total: $15,118.00”
City site development permit process inside Mosier
“applicant downloads sdp packet from city website: cityofmosier.com/permits and reviews all requirements.”
Mosier does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Structural, electrical and plumbing permits issued by Wasco County Building Codes for structures inside Mosier city
“wasco county building codes in the dalles will be permitting your actual structure: electrical, plumbing, structural.”
We looked and could not find an official answer yet. Silence is not permission; ask Mosier or Wasco County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Mosier publishes no rule on the point, not that none exists. Wasco County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Mosier means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.