Baker County, Oregon
Halfway is a city in Baker County, Oregon. Halfway adopts its own zoning, so inside its limits Halfway’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Baker County page.
Erection, movement, reconstruction, extension, enlargement or alteration of buildings inside Halfway city
“an authorization permit for such erection, movement, reconstruction, extension, enlargement, or alteration shall be obtained from the city recorder after discussing with the ordinance officer. the applicant shall pay a fee as established by city ordinance at the time the application is filed.”
Land inside Halfway city limits (Baker County, OR)
“the land may be used and a building or structure or part of a building or structure may be constructed, reconstructed, altered, occupied or used only as this chapter shall permit.”
Halfway city zoning districts R, CR and P
“this chapter hereby establishes the following land use zones for the city. zone abbreviated designations residential r commercial-residential cr public p”
Residential Zone R inside Halfway city (single, two family and mobile home dwellings)
minimum lot area single/two-family: >= 5000 sq ft
“in the "r" zone the minimum lot or parcel size shall be as follows. a. single, two family, and mobile home dwellings: 5,000 square feet.”
Residential Zone R inside Halfway city
front yard: >= 10 feet · interior side yard: >= 5 feet from drip-line · rear yard: >= 5 feet from drip-line
“there shall be a rear yard of not less than five feet from the drip-line in depth.”
Residential Zone R inside Halfway city
max height: <= 28 feet or two stories, whichever is less
“buildings, structures, or portions thereof shall not be erected to exceed a height of two stories or 28 feet at grade of front door, or whichever is less.”
Manufactured homes on individual lots in residential zones inside Halfway city
“manufactured homes meeting the following criteria are allowed on individual lots in specified residential zones. only those manufactured homes are used as permanent residences.”
Land partitioning and subdivisions inside Halfway city
“any person proposing a subdivision, or their authorized agent or representative shall submit an application for a subdivision to the city recorder.”
Land use authorization inside Halfway city
“once authorized by the city, the applicant will consult with the baker county building department. if a building permit is required, it will be obtained from the baker county building department.”
We looked and could not find an official answer yet. Silence is not permission; ask Halfway or Baker County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Halfway publishes no rule on the point, not that none exists. Baker County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Halfway means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.