McClain County, Oklahoma
Town of Goldsby is a town in McClain County, Oklahoma. Town of Goldsby adopts its own zoning, so inside its limits Town of Goldsby’s rules apply, not the county’s. Septic permits inside Town of Goldsby come from the state health agency. 10 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the McClain County page.
Buildings and structures inside Goldsby town limits.
minor-repair cost threshold: <= 2000 USD (Minor repairs of buildings or structures.) · accessory-building area threshold: < 100 square feet (No water, sewer, or electrical hookups; not in dedicated road or alley right-of-way; not in violation of zoning ordinance.)
“Minor repairs of buildings or structures, the cost of which shall not exceed two thousand dollars ($2,000), may be made without obtaining a building permit”
Plumbing, electrical, or mechanical work on buildings or structures inside Goldsby town limits.
“all plumbing, electrical or mechanical work covered by adopted Model Construction Codes, shall require an appropriate permit.”
Land inside Goldsby town limits.
“Zoning & code of Ordinances & Regulations for Subdivisions”
Accessory buildings inside Goldsby town limits.
accessory-building area threshold: < 100 square feet (No water, sewer, or electrical hookups; not in dedicated road or alley right-of-way; not in violation of zoning ordinance.)
“Construction of accessory buildings under one hundred (100) square feet in area may also occur without a building permit”
Forms published by Goldsby for permits and land-use applications.
“Select the correct form below and print. Any form should be filled out completely and brought into the following location:”
Town of Goldsby does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New or modified on-site sewage treatment systems inside Goldsby town limits.
“an Authorization to Construct (ATC) must be purchased and issued by DEQ.”
Installation of a new or modification of an existing on-site sewage treatment system inside Goldsby town limits.
“Before installing a new or modifying an existing on-site sewage treatment system, an Authorization to Construct (ATC) must be purchased and issued by DEQ.”
New or modified on-site sewage systems inside Goldsby town limits.
certified-installer final-inspection submission: <= 15 days (After completion.)
“All new installations or modifications to an on-site sewage system must be inspected and approved by DEQ”
On-site sewage treatment used inside Goldsby town limits.
“The Report for On-Site Sewage, commonly referred to as a 581, determines what types of on-site systems are allowed for the property.”
Groundwater wells inside Goldsby town limits.
domestic irrigation exemption limit: < 3 acres (Domestic groundwater wells.)
“Any well drilling contractor who intends to drill a groundwater well for non-domestic use must apply for authorization and receive approval from the OWRB prior to drilling.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Goldsby or McClain County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Goldsby publishes no rule on the point, not that none exists. McClain County’s page lists the county offices to call.