Bolthole Index

Summit County, Ohio

Zoning, building permits and septic rules in Reminderville, Ohio

Reminderville is a city in Summit County, Ohio. Reminderville adopts its own zoning, so inside its limits Reminderville’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Summit County page.

Answers from the rulebook for Reminderville

Reminderville’s own rules

  • Building permitRequired

    Construction, erection, additions, alterations, repairs, moving, demolition, razing, excavation, site preparation, and work commenced inside Reminderville city limits.

    • A municipal permit must be issued before the listed work commences.
    • Permit must be obtained and applicable fees paid within 45 days after application and plans are filed with the Building Department.
    • Permit is issued only when documents conform with applicable building and zoning requirements.
    • A permit becomes null and void if the permitted work is not completed within three months of issuance.
    • Residents age 65 and older must obtain permits but are exempt from fees designated by the senior-citizen exemption.

    municipal building-and-zoning operating-cost fee: 5 percent (Additional fee for listed permit work; used exclusively for Building and Zoning Department operating costs and continuing education.)

    “except after issuance of a permit therefor by the municipality.”
  • Building code adoptedAdopted (with conditions)

    Building work inside Reminderville city limits.

    • The municipal Building Code identifies both the Ohio Building Code and the Residential Code of Ohio for one-, two-, and three-family dwellings as standards adopted.
    “TITLE ONE - Standards Adopted Chap. 1301. Ohio Building Code. Chap. 1303. Residential Code of Ohio for One, Two and Three Family Dwellings.”
  • Local zoningPresent (with conditions)

    Land inside Reminderville city limits.

    • Zoning administration and district controls are contained in the municipal Planning and Zoning Code.
    “TITLE FIVE - Zoning Administration and Districts”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Reminderville city limits.

    • The published municipal Planning and Zoning Code identifies a Class A Single-Family District and Class B Retail Business District; it also lists planned-development and environmental-conservation planned-development provisions.
    “Chap. 1139 . Class A Single-Family District. Chap. 1141 . Class B Retail Business District.”
  • Subdividing landRegulated (with conditions)

    Subdivision and platting of land inside Reminderville city limits.

    • The municipal Planning and Zoning Code includes city regulations, plat approval and enforcement, variances, and design standards and improvements.
    “TITLE THREE - Subdivision Regulations Chap. 1111 . Summit County Subdivision Regulations. Chap. 1113 . City Regulations.”
  • Driveway accessRequired

    Construction of a residential drive or apron inside Reminderville city limits.

    • The required municipal permits-and-fees schedule lists a drive and/or apron fee of $100 per drive.
    • The listed fee qualifies for the senior-citizen exemption.

    drive-and-or-apron permit fee: 100 USD per drive (Qualifies for senior citizen exemption.)

    “H. Drive and/or apron $100.00 per drive (qualifies for senior citizen exemption)”
  • Permit feesPublished (with conditions)

    Municipal construction and related permits inside Reminderville city limits.

    • Fees vary by residential, nonresidential, and miscellaneous work type.
    • For residential new construction, the listed base fee is $2,500 per structure.
    • Senior citizens may qualify for stated fee exemptions.
    • Section 1333.01 also imposes an additional 5 percent fee for specified permit work.

    residential new-construction base fee: 2500 USD per structure (Includes permits for listed specialty trades.) · residential certificate-of-occupancy fee: 50 USD each

    “The following permits and fees shall be required. (a) Nonresidential (as defined by Ohio Building Code).”
  • Permit processPublished (with conditions)

    Permit applications for regulated work inside Reminderville city limits.

    • Permit and applicable fees must be obtained within 45 days after application and plans are filed with the Building Department.
    • The Building Inspector must examine each application and may issue no permit until documents conform to applicable requirements.
    • Work must be completed within three months after permit issuance or the permit becomes null and void.

    permit application-and-plan period: <= 45 days (Measured after application and plans are filed with the Building Department.) · permit completion period: <= 3 months (Otherwise the permit becomes null and void.)

    “shall become null and void if the work [...] is not completed within three months”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Reminderville or Summit County directly.

  • Owner-builder exemption — Owner-builders inside Reminderville city limits.
  • Inspections — Building inspections for construction inside Reminderville city limits.
  • Certificate of occupancy — Occupancy of buildings inside Reminderville city limits.
  • Minimum dwelling size — Dwellings in Reminderville zoning districts.
  • Minimum lot size — Lots in Reminderville zoning districts.
17 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Reminderville publishes no rule on the point, not that none exists. Summit County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Reminderville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Summit County: county rules, score and offices