Granville Township is a township in Licking County, Ohio. Granville Township adopts its own zoning, so inside its limits Granville Township’s rules apply, not the county’s. Septic permits inside Granville Township come from Granville Township. 9 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Licking County page.
Land inside Granville Township, Licking County, Ohio.
“The Township Zoning Commission has the following duties: 1. Initiate proposed amendments to the Township Zoning Resolution. 2. Consider and review all proposed amendments to the Township Zoning Resolution and make recommendations to the Board of Township Trustees.”
Township zoning/building permit applications inside Granville Township.
dwelling garage addition fee: $100 + $14.00/100 sq feet · certificate of occupancy fee: 124 USD
“Dwellings, Garages and additions: $100 + $14.00/100 sq feet”
Township zoning permits inside Granville Township.
“Q. How do I get a Zoning (Building) Permit? A. Download the form HERE or contact our Zoning Inspector, Travis Binckley, at (740) 587-0229.”
Granville Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential projects inside Granville Township that require a Licking County building permit.
“The following are common examples of work that typically requires a permit and inspections.”
Installation of an on-lot sewage system inside Granville Township.
“A sewage system installation permit and operating permit must be obtained from the Health Department prior to installation.”
New, altered, and replacement on-lot sewage systems inside Granville Township.
follow-up inspection: 12 months after completion (New system installations.) · soil-absorption inspection interval: per 5 years (Systems using soil absorption.)
“The installer must call to schedule an inspection prior to backfilling the system. LCHD performs a follow-up inspection on all new system installations 12 months after the system is completed to evaluate system performance and provide homeowner education.”
Use of an on-lot sewage treatment system instead of public sewer inside Granville Township.
“Not all lots can be developed and served by an on-lot sewage treatment system. Limiting factors like flood plains, saturated soils, excessive slopes can make system design impossible or impractical.”
Subdivisions inside Granville Township that are not served by public water and sewer.
“Additionally, the department reviews all subdivisions in the county developed in areas not served by public water and sewer.”
We looked and could not find an official answer yet. Silence is not permission; ask Granville Township or Licking County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Granville Township publishes no rule on the point, not that none exists. Licking County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Granville Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.