Licking County, Ohio
Bowling Green Township is a township in Licking County, Ohio. Bowling Green Township adopts its own zoning, so inside its limits Bowling Green Township’s rules apply, not the county’s. Septic permits inside Bowling Green Township come from Bowling Green Township. 9 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Licking County page.
Land inside Bowling Green Township, Licking County.
“In Licking County, zoning is administered at the township level.”
Bowling Green Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Installation of a household or small-flow sewage system inside Bowling Green Township.
“A sewage system installation permit and operating permit must be obtained from the Health Department prior to installation.”
New, altered, or replacement sewage systems inside Bowling Green Township.
follow-up inspection: 12 months after completion · operation and maintenance inspection: per 1 year (Off-lot discharging and drip-irrigation systems) · operation and maintenance inspection: per 5 years (Soil-absorption systems)
“The installer must call to schedule an inspection prior to backfilling the system. LCHD performs a follow-up inspection on all new system installations 12 months after the system is completed to evaluate system performance and provide homeowner education.”
On-lot sewage treatment systems inside Bowling Green Township.
“Not all lots can be developed and served by an on-lot sewage treatment system. Limiting factors like flood plains, saturated soils, excessive slopes can make system design impossible or impractical.”
Private water systems, including wells, inside Bowling Green Township.
“A permit must be issued by the health department prior to installing or altering a private water system.”
Subdivisions and new lots in Bowling Green Township that are not served by public water and sewer.
“Additionally, the department reviews all subdivisions in the county developed in areas not served by public water and sewer.”
Building-permit applicants inside Bowling Green Township subject to Licking County Building Code Department jurisdiction.
“These attachments include an Application for Permit, Fee Schedule, various checklists and procedures for obtaining permits and plan approvals, and supplemental handouts that you may find useful.”
Building-permit applicants inside Bowling Green Township subject to Licking County Building Code Department jurisdiction.
“To submit for a building permit, please provide a completed Application, a copy of the Zoning Certificate (or Health Department Approval for areas without zoning) and two complete sets construction plans and specifications for the project.”
We looked and could not find an official answer yet. Silence is not permission; ask Bowling Green Township or Licking County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Bowling Green Township publishes no rule on the point, not that none exists. Licking County’s page lists the county offices to call.