Adams County, Ohio
Village of West Union is a village in Adams County, Ohio. Village of West Union adopts its own zoning, so inside its limits Village of West Union’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Adams County page.
Land inside West Union village (Tiffin Township, Adams County)
“this chapter 150 as enacted by this ordinance shall be known and may be cited and referred to as the zoning ordinance of the village of west union, tiffin township, adams county, ohio.”
Zoning districts inside West Union village
“the village of west union, adams county, ohio is hereby divided into classes of districts:”
Dwelling lots in the R-1 residence district inside West Union village (district identified by position; its conditional uses include two-family duplexes)
minimum lot area per dwelling unit: >= 5000 square feet · minimum lot width at front building line: >= 50 feet
“the minimum land area or lot size per dwelling unit shall be five thousand (5,000) square feet and the minimum width of the lot at the front of the building line shall be fifty (50) feet.”
“the minimum land area or lot size per dwelling unit shall be forty three thousand five hundred sixty (43,560) square feet and the minimum width of the lot at the front building line shall be one hundred fifty (150) feet.”
R-1 residence district inside West Union village
front yard: >= 20 feet (steps, eaves, cornices and similar fixtures may extend nearer) · rear yard: >= 25 feet
“there shall be a rear yard depth of not less than twenty-five (25) feet.”
“there shall be two side yards each having a width of not less than twenty five (25) feet. on a comer lot the front yard setback shall be observed on all sides of the lot bordering on a public street.”
Driveways inside West Union village
“between private property and the travel portion of a public street, alley or other public thoroughfare. all driveways are to be permitted.”
Zoning permits inside West Union village
decision deadline: <= 10 working days
“no later than ten (10) working days after the receipt of an application and application fee, the zoning administrator shall either approve or disapprove the application in conformance with the provisions of this ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of West Union or Adams County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of West Union publishes no rule on the point, not that none exists. Adams County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of West Union means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.