Bolthole Index

Westchester County, New York

Zoning, building permits and septic rules in Village of Pleasantville, New York

Village of Pleasantville is a village in Westchester County, New York. Village of Pleasantville adopts its own zoning, so inside its limits Village of Pleasantville’s rules apply, not the county’s. Septic permits inside Village of Pleasantville come from Westchester County (Westchester County Department of Health, Septic System Management · (914) 995-7285). 8 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Westchester County page.

Answers from the rulebook for Village of Pleasantville

Village of Pleasantville’s own rules

  • Building permitRequired

    Work in Pleasantville village that must conform to the Uniform Code or Energy Code, including new residential construction.

    • The listed exemptions in § 98-13B apply.
    • A permit must be obtained from the Building Inspector before work begins.
    “Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a building system, solid-fuel-burning heating appliance, chimney or flue in any dwelling unit.”
  • Building code adoptedAdopted (with conditions)

    Buildings and structures located in Pleasantville village.

    • The Village adopted the Uniform Code, Energy Code, and subsequent amendments.
    “The Village Board of the Village hereby adopts the New York State Uniform Fire Prevention and Building Code (the "Uniform Code") and the State Energy Conservation Construction Code (the "Energy Code"), henceforth collectively referred to as the "Codes of the State of New York," and all subsequent amendments thereto.”
  • InspectionsRequired

    Permitted work in Pleasantville village.

    • Work must remain accessible and exposed until inspected and accepted.
    • The permit holder must notify the Building Inspector when work is ready for inspection.
    “All work for which permits are issued under the provisions of this chapter and the Codes of the State of New York shall be inspected at various intervals during the progress of the work involved.”
  • Certificate of occupancyRequired

    Any work within Pleasantville village that is the subject of a building permit, and changes of use or occupancy.

    • A final inspection and applicable Master Fee Schedule fee are required before issuance.
    • The Building Inspector must find compliance with applicable codes.
    “Required. A certificate of occupancy shall be required for any work which is the subject of a building permit. Permission to use or occupy a building or structure, or portion thereof, for which a building permit was previously issued shall be granted only by issuance of a certificate of occupancy.”
  • Local zoningPresent (with conditions)

    Land within Pleasantville village limits.

    • Zoning controls are subject to Chapter 185 and its amendments.
    “[HISTORY: Adopted by the Village Board of Trustees of the Village of Pleasantville 3-22-1999 by L.L. No. 2-1999. Amendments noted where applicable.]”
  • Permit processPublished (with conditions)

    Building-permit applications inside Pleasantville village.

    • The Building Inspector may require information sufficient to determine code compliance.
    • Applications must include the required fee.

    permit decision period after compliance determination: <= 30 calendar days (Action is withheld if another authority's required approval has not been obtained.)

    “The Building Inspector shall approve the application and issue a written permit for the proposed work within 30 calendar days after determining that such application complies with the applicable requirements of this Code and the Codes of the State of New York. The Building Inspector shall withhold action upon any plan or application which requires the approval of any other municipal officer or other person, department or agency having jurisdiction thereof, until such approval is obtained.”

Rules another office applies inside Village of Pleasantville

Village of Pleasantville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private septic or other private sewage-disposal systems serving proposed buildings inside Pleasantville village.

    • The condition applies where the building sanitary system will not connect to the Village sanitary sewer system.
    “Approval of certain plans by Westchester County Department of Health. In any case in which the sanitary system in the building proposed to be erected will not be connected to the sanitary sewer system of the Village, but will be connected to a septic tank or other private sewage disposal system, no building permit shall be issued until the plans for such septic tank or other private sewage disposal system shall have been approved by the Westchester County Department of Health.”
  • Off-grid sanitationLimited

    Private sewage disposal for a proposed building inside Pleasantville village when the building will not connect to the Village sanitary sewer.

    • Private-system plans require Westchester County Department of Health approval before a Village building permit issues.
    “In any case in which the sanitary system in the building proposed to be erected will not be connected to the sanitary sewer system of the Village, but will be connected to a septic tank or other private sewage disposal system, no building permit shall be issued until the plans for such septic tank or other private sewage disposal system shall have been approved by the Westchester County Department of Health.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Pleasantville or Westchester County directly.

  • Owner-builder exemption — Owner-built residential construction within Pleasantville village.
  • Living in an RV — Long-term recreational-vehicle occupancy on private land inside Pleasantville village.
  • Camping on your land — Temporary camping on private land inside Pleasantville village.
  • Tiny homes — Tiny-home occupancy inside Pleasantville village.
  • Manufactured homes — Manufactured-home occupancy inside Pleasantville village.
8 more unanswered
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Pleasantville publishes no rule on the point, not that none exists. Westchester County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of Pleasantville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Westchester County: county rules, score and offices