Washington County, New York
Village of Cambridge is a village in Washington County, New York. Village of Cambridge adopts its own zoning, so inside its limits Village of Cambridge’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Washington County page.
Buildings inside Cambridge village; the village zoning law says the certificate comes from Washington County
“d. certificate of occupancy - no building may be occupied until a certificate of occupancy has been received from washington county.”
All land inside Cambridge village (Washington County), NY
“no development may commence within the village without a basic zoning permit issued by the zoning enforcement officer.”
Zoning districts inside Cambridge village: MU, GC, RT, VR, RR, I (per Appendix B)
“p = permitted, sp = special permit required, x = prohibited appendix b village dimension table mu gc rt vr rr i”
VR district: front 10 ft, side 10 ft, rear 25 ft minimum; RR district: front 10 ft, side 40 ft, rear 40 ft minimum, inside Cambridge village
VR side yard: >= 10 ft · VR rear yard: >= 25 ft · RR side yard: >= 40 ft · RR rear yard: >= 40 ft
“minimum front yard setback (feet) 0 20 10 10 10 20 maximum front yard setback (feet) 5 40 30 30 40 30 minimum side yard setback (feet) 0 10 10 10 40 20 maximum side yard setback (feet) 30 - - - - - minimum rear yard setback (feet) 15 25 25 25 40 20”
Maximum impervious surface: VR district 30%, RR district 15%, inside Cambridge village
VR max impervious: <= 30 % · RR max impervious: <= 15 %
“maximum impervious surface (%) 100% 50% 50% 30% 15% 30%”
All districts in Cambridge village including VR and RR: maximum 40 ft
maximum building height: <= 40 ft (church steeples, water towers, fixed radio antennas, public monuments)
“maximum building height (feet) * 40 40 40 40 40 40”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Cambridge or Washington County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Cambridge publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.