Zoning, building permits and septic rules in Village of Cambridge, New York

Village of Cambridge is a village in Washington County, New York. Village of Cambridge adopts its own zoning, so inside its limits Village of Cambridge’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Washington County page.

Answers from the rulebook for Village of Cambridge

Village of Cambridge’s own rules

  • Certificate of occupancyRequired

    Buildings inside Cambridge village; the village zoning law says the certificate comes from Washington County

    • Zoning permit expires if no certificate of occupancy within 18 months of issuance or when the building permit expires, whichever is shorter
    “d. certificate of occupancy - no building may be occupied until a certificate of occupancy has been received from washington county.”
  • Local zoningPresent

    All land inside Cambridge village (Washington County), NY

    • Administered by the zoning enforcement officer, planning board and zoning board of appeals
    • Document is dated 3 June 2015; later amendments were not checked
    “no development may commence within the village without a basic zoning permit issued by the zoning enforcement officer.”
  • Zoning districtsPublished

    Zoning districts inside Cambridge village: MU, GC, RT, VR, RR, I (per Appendix B)

    • Use chart: P = permitted, SP = special permit required, X = prohibited
    • Official zoning map is kept by the village (not verified here)
    “p = permitted, sp = special permit required, x = prohibited appendix b village dimension table mu gc rt vr rr i”
  • SetbacksDistrict specific (with conditions)

    VR district: front 10 ft, side 10 ft, rear 25 ft minimum; RR district: front 10 ft, side 40 ft, rear 40 ft minimum, inside Cambridge village

    • Maximum front yard setback VR 30 ft, RR 40 ft
    • Sheds are exempt from rear/side setbacks but must be at least 5 ft from any property line and not in a front yard (Section 6.01)

    VR side yard: >= 10 ft · VR rear yard: >= 25 ft · RR side yard: >= 40 ft · RR rear yard: >= 40 ft

    “minimum front yard setback (feet) 0 20 10 10 10 20 maximum front yard setback (feet) 5 40 30 30 40 30 minimum side yard setback (feet) 0 10 10 10 40 20 maximum side yard setback (feet) 30 - - - - - minimum rear yard setback (feet) 15 25 25 25 40 20”
  • Lot coverageDistrict specific (with conditions)

    Maximum impervious surface: VR district 30%, RR district 15%, inside Cambridge village

    • Column order mu, gc, rt, vr, rr, i = 100%, 50%, 50%, 30%, 15%, 30%

    VR max impervious: <= 30 % · RR max impervious: <= 15 %

    “maximum impervious surface (%) 100% 50% 50% 30% 15% 30%”
  • Building heightSpecified

    All districts in Cambridge village including VR and RR: maximum 40 ft

    • Exempt: church steeples, water towers, fixed radio antennas, and public monuments

    maximum building height: <= 40 ft (church steeples, water towers, fixed radio antennas, public monuments)

    “maximum building height (feet) * 40 40 40 40 40 40”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Cambridge or Washington County directly.

  • Building permit — Cambridge village
  • Owner-builder exemption — Cambridge village
  • Building code adopted — Cambridge village
  • Inspections — Cambridge village
  • Minimum dwelling size — Cambridge village
18 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Cambridge publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.

← All of Washington County: county rules, score and offices