Tioga County, New York
Town of Nichols is a town in Tioga County, New York. Town of Nichols adopts its own zoning, so inside its limits Town of Nichols’s rules apply, not the county’s. Septic permits inside Town of Nichols come from Town of Nichols. 12 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Tioga County page.
New construction, additions, structural refurbishing, and similar work inside Nichols town.
“All new construction, additions, structural refurbishing, and the like require a building permit and are subject to the rules and regulations of the New York State Uniform Fire Prevention and Building Code.”
Work authorized by the Town building-permit application, including permanent structures and mobile homes.
“We hereby agree to notify the Inspector for the following inspections: Sewer Systems Inspections (septic systems). Water supply inspections. Completion of Construction or Installation of Mobile Home and the required inspections.”
A building built, altered, or mobile home installed under the Town building-permit application.
“That the Building(s) will not be occupied until a Certificate of Occupancy is issued.”
Land inside the Town of Nichols, Tioga County, New York.
“This chapter is designed to regulate land use in the Town of Nichols.”
Land inside Nichols town.
zoning districts: Agricultural; Business; Industrial; Residential
“For the purposes of this chapter, the Town of Nichols is hereby divided into the following zoning districts and combinations thereof: (1) Agricultural districts. (2) Business districts. (3) Industrial districts. (4) Residential districts.”
All building lots inside Nichols town.
minimum lot size: 2 to 5 acres (Depending on percolator test results; less than two acres may be permitted when percolator results so indicate and/or a special waste disposal system is designed and approved by the Code Enforcement Officer, when approved by the Town Board.)
“The minimum lot size for all buildings shall be two acres to five acres depending on percolator test results. Where the results of percolator tests so indicate and/or a special waste disposal system is designed and approved by the Code Enforcement Officer, lot sizes of less than two acres may be permitted when approved by the Town Board.”
Buildings in nonindustrial, nonbusiness residential districts inside Nichols town.
street-centerline setback: >= 75 feet (Nonindustrial, nonbusiness residential districts; corner-lot exception applies.) · side and rear setback: >= 40 feet (Nonhabitable accessory buildings such as detached garages and tool sheds may be 20 feet or more from side and rear lot lines.)
“In nonindustrial, nonbusiness residential districts, each building shall be set back at least 75 feet from the center line of any public street or road, except for corner lots where the seventy-five-foot setback will apply to the front of the building only. All structures must be a minimum of 40 feet from side and rear lot lines. However, nonhabitable (animal or human) accessory buildings such as detached garages and tool sheds may be located 20 feet or more from the side and rear lot lines.”
Buildings and structures in every district or zone inside Nichols town.
maximum height: <= 35 feet (Except by special permit granted by the Town of Nichols Zoning Board of Appeals.)
“No building or structure of any type, in any district or zone, shall exceed 35 feet in height, except by special permit granted by the Town of Nichols Zoning Board of Appeals. Permit procedures shall be those specified in § 194-45 of this chapter.”
Septic-system inspections associated with the Town building-permit application inside Nichols town.
“We hereby agree to notify the Inspector for the following inspections: Sewer Systems Inspections (septic systems).”
Septic systems included in a Town building-permit application inside Nichols town.
“We hereby agree to notify the Inspector for the following inspections: Sewer Systems Inspections (septic systems).”
Structures and land excavation or filling in areas of special flood hazard within Nichols town.
“A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and insuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any development in an area of special flood hazard, as shown on the Flood Insurance Rate Map, enumerated in § 114-6, without a valid floodplain development permit.”
Permits to erect, alter, or install a mobile home or permanent structure inside Nichols town.
permit expiration: 1 year (Unless substantial progress is made.)
“Application is hereby made for a permit to erect, alter or install a mobile home or permanent structure described below and detailed in the plans and specifications attached hereto. [...] PERMIT EXPIRES IN ONE YEAR UNLESS SUBSTANTIAL PROGRESS IS MADE”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Nichols or Tioga County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Nichols publishes no rule on the point, not that none exists. Tioga County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Nichols means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.