Tioga County, New York
Town of Candor is a town in Tioga County, New York. 11 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Tioga County page.
Work in Candor town that must conform to the Uniform Code or Energy Code, including construction, enlargement, alteration, improvement, removal, relocation, demolition, and specified solid-fuel equipment work.
“Except as otherwise provided in subsection B of this section, a Building Permit shall be required for any work which must conform to the Uniform Code and/or Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a solid fuel burning heating appliance, chimney or flue in any dwelling unit.”
Buildings, structures, and premises in the Town of Candor.
“This local law provides for the administration and enforcement of the New York State Uniform Fire Prevention and Building Code (the Uniform Code) and the State Energy Conservation Construction Code (the Energy Code) in this Town.”
Permit work in Candor town where the listed construction elements are applicable.
“Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an Inspector authorized by the Code Enforcement Officer. The Permit Holder shall notify the Code Enforcement Officer when any element of work described in subsection B of this section is ready for inspection.”
Work subject to a building permit and conversions between use or occupancy classifications in Candor town.
“A Certificate of Occupancy/Certificate of Compliance shall be required for any work which is the subject of a Building Permit and for all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or sub-classification to another.”
Building-permit applications in Candor town.
minimum lot size: >= 1 acre (Must also have 50 feet of road frontage and capability of proper water and septic operation.) · minimum road frontage: >= 50 feet (For the permit standard.)
“Minimum lot size will be one acre and a minimum 50 feet of road frontage with the capability of proper water and septic operation;”
Buildings and structures subject to the Candor building-permit standards.
street-or-road-centerline setback: >= 75 feet (Measured from the centerline of any street or road.) · side and rear lot-line setback: >= 10 feet
“Each building or structure shall be set back at least 75 feet from the centerline of any street or road and a minimum of 10 feet from side and rear lot lines;”
Manufactured homes used as dwellings inside or outside manufactured-home parks in Candor town.
“No manufactured home park shall be constructed within the Town of Candor without first obtaining a permit for such construction nor shall any manufactured home park be operated within the Town of Candor without first securing a license therefor and renewing such license each year in compliance with the requirements of this local law, and no manufactured home shall be placed or used for dwelling purposes inside or outside a manufactured home park except upon securing a permit therefor and upon complying with the relevant provisions of this Local Law and the New York state Environmental Quality Review Act.”
Driveway construction associated with Candor building-permit standards.
“All driveway construction will conform to Town, County or State requirements, whichever is applicable;”
Construction and other development in areas of special flood hazard within Candor town.
floodplain-development-permit fee: 100 USD (Town Fee Schedule 2024.4.) · additional-cost deposit: <= 500 USD (May be required by the Local Administrator.)
“without a valid floodplain development permit”
Town of Candor building, manufactured-home, floodplain, and related permits and licenses.
first 1,500 square feet fee for one- or two-family dwellings: 150 USD (New construction; each additional 100 square feet is $10.) · floodplain development permit fee: 100 USD · manufactured home placement on private lot: 150 USD (Single/double manufactured home.)
“Building Permit and License Fee Schedule”
Building-permit applications in Candor town.
“Applications for a Building Permit shall be made in writing on a form provided by or otherwise acceptable to the Code Enforcement Officer. The application shall be signed by the owner of the property where the work is to be performed or an authorized agent of the owner.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Candor or Tioga County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Candor publishes no rule on the point, not that none exists. Tioga County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Candor means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.