Steuben County, New York
Town of West Union is a town in Steuben County, New York. Septic permits inside Town of West Union come from the county and state together. 6 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Steuben County page.
Town of West Union does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Work inside West Union that is required to conform to the New York Uniform Code
“Building permits must be required for any work which is required to conform to the Uniform Code. Certain exceptions are permitted.”
Building construction inside the Town of West Union, which is outside New York City
uniform-code-version: 2025 Uniform Code of New York State
“The Uniform Code is automatically in effect in each city, town, and village in the State (except New York City) by directive of the State Legislature. An individual city, town, or village cannot choose to exclude itself from all or any part of the Uniform Code.”
Uniform-Code construction work inside West Union for which inspections are specified
“Inspections of certain specified elements of the construction process must be required. Building permits holders must keep work accessible and exposed until inspected and accepted by the municipality.”
Work inside West Union for which a building permit was required, and changes in general occupancy classification
“A certificate of occupancy or a certificate of compliance must be required (1) for all work for which a building permit was required and (2) whenever the general occupancy classification of a building is changed.”
Onsite wastewater systems inside West Union that discharge less than 1,000 gallons per day to groundwater and contain no industrial or other non-sewage wastes
groundwater-discharge: < 1000 gallons per day (No industrial or other non-sewage wastes)
“Wastewater treatment systems that discharges less than 1,000 gallons per day to groundwater, and that have no industrial or other non-sewage wastes will require approval from the appropriate city or county health department, or the appropriate district office of the New York State Department of Health.”
Ordinary private water-well drilling inside West Union
Long Island well production: > 45 gallons per minute (DEC exception stated for Long Island water wells) · geothermal well depth: > 500 feet (DEC exception for geothermal wells)
“A: A DEC permit is not required except for Long Island water wells that produce more than 45 gallons per minute, and geothermal wells more than 500 feet deep. However, a local permit is needed in some counties.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of West Union or Steuben County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of West Union publishes no rule on the point, not that none exists. Steuben County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of West Union means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.