Steuben County, New York
Town of Campbell is a town in Steuben County, New York. 13 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Steuben County page.
Buildings or structures erected, added to, or structurally altered inside Campbell town.
“No building or structure shall be erected, added to, or structurally altered until a permit thereof has been issued by the Code Enforcement Officer.”
Development performed in a Campbell town special flood hazard area.
“The Local Floodplain Administrator and /or the developer’s engineer or architect shall make periodic inspections at appropriate times throughout the period of construction in order to monitor compliance with permit conditions”
Recreational vehicles in Campbell town special flood hazard areas.
continuous stay threshold: >= 180 days (unless fully licensed and ready for highway use)
“A certificate of elevation must also be submitted for a recreational vehicle if it remains on a site for one hundred eighty (180) consecutive days or longer (unless it is fully licensed and ready for highway use).”
Campgrounds for recreational camping in Campbell town.
“Campgrounds may be located in agricultural and residential districts only. The potential developer of such a facility shall prepare a concept plan for submission to the Planning Board.”
Habitable structures and development in Campbell town.
“Provisions for water supply and sewage disposal shall comply with requirements of the Town of Campbell, N.Y.S. Health Department, and/or N.Y.S. Department of Environmental Conservation. All habitable structures shall meet minimum requirements as identified by the Town or N.Y.S. Health Department.”
Subdivision-related residential cluster development in Campbell town.
“The applicant shall submit at successive stages a sketch plan, preliminary layout, and subdivision plat in accordance with the requirements of the subdivision regulations.”
Construction and other development in Campbell town special flood hazard areas shown on the Flood Insurance Rate Map.
“It shall be unlawful to undertake any development in a special flood hazard area, as shown on the Flood Insurance Rate Map enumerated in Section 6.4.2, without a valid floodplain development permit.”
Zoning variance applications in Campbell town.
use variance fee: 75 USD · area variance fee: 75 USD
“Zoning Board Fees 10/30/2021 Use Variance: $75.00 Area Variance: $75.00”
Town of Campbell building-permit applications administered by Steuben County.
application review period: <= 30 days (Before a building permit is issued and work can be started.)
“Code Enforcement Officer has up to 30 days to review the Application before a Building Permit is issued and work can be started.”
Town of Campbell does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential use in Campbell town AR Agricultural Residential and R1 Rural Residential zoning districts.
AR minimum land area per dwelling unit: 50000 square feet (May be reduced to 20,000 square feet under the schedule footnote.) · R1 minimum land area per dwelling unit: 20000 square feet
“Residential AR* 50,000*** - 250' 75' 20' 80' 10% 35' R1* 20,000 - 100' 35' 20' 50' 25% 35'”
Residential use in Campbell town AR Agricultural Residential and R1 Rural Residential zoning districts.
AR front/side/rear yard: 75/20/80 feet · R1 front/side/rear yard: 35/20/50 feet
“Residential AR* 50,000*** - 250' 75' 20' 80' 10% 35' R1* 20,000 - 100' 35' 20' 50' 25% 35'”
Residential use in Campbell town AR Agricultural Residential and R1 Rural Residential zoning districts.
AR maximum lot coverage: <= 10 percent (Includes all accessory buildings.) · R1 maximum lot coverage: <= 25 percent (Includes all accessory buildings.)
“Maximum Lot Coverage (Inc. all Accessory Bldgs.) **”
Residential use in Campbell town AR Agricultural Residential and R1 Rural Residential zoning districts.
AR maximum height: <= 35 feet · R1 maximum height: <= 35 feet
“For all districts, exempt small scale wind energy systems from height restrictions up to 85 feet.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Campbell or Steuben County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Campbell publishes no rule on the point, not that none exists. Steuben County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Campbell means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.