Town of Addison is a town in Steuben County, New York. Septic permits inside Town of Addison come from Steuben County (New York State Department of Health, Hornell District Office · 607-324-8371). 7 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Steuben County page.
Work in the Town of Addison that must conform to the Uniform Code or Energy Code, including listed construction, alteration, demolition, relocation, and solid-fuel work.
application review period: <= 30 days (Before a building permit is issued and work can be started.)
“A Building Permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to: the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof; and the installation of a solid fuel burning device, heating appliance, chimney or flue in any dwelling unit, No Person shall commence any work for which a Building Permit is required without first having obtained a Building Permit from the Code Enforcement Officer.”
An owner-occupied one-, two-, three-, or four-family residence whose homeowner is the general contractor on the Addison building-permit application.
paid-worker aggregate hours: < 40 hours per week (Available only under the owner-occupied-residence conditions stated in the application.)
“For homeowners of a 1, 2, 3 or 4 Family, Owner-occupied Residence, proof of their exemption from the mandatory coverage provisions of the Workers' Compensation Law when applying for a building permit is to file form BP-I”
Work authorized by a Town of Addison building permit.
inspection notice: >= 48 hours
“You MUST notify the Building Inspector at least 48 hours in advance of any inspection at 607-542-2175 and Permit Holder or Contractor shall notify Building Inspector when work is ready for inspection. Work shall remain accessible and exposed until inspected and accepted by the Building Inspector!”
New or modified on-site wastewater disposal systems submitted with a Town of Addison building-permit application.
“New or modified On-site Wastewater Disposal System (Septic): MUST BE designed by NYS Registered Engineer or Architect. They must also inspect installation and certify system was installed as per original design. You shall provide a copy of design print with application to the Building Inspector and copy of engineer's certification letter to the Building Inspector after installation is complete.”
Town of Addison does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings inside the Town of Addison, New York, which is outside New York City.
“The Uniform Code is applicable in every part of the State (except the City of New York, which was permitted to retain its own code). An individual city, town, or village is not required to “adopt” the Uniform Code or to take any other affirmative step to make the Uniform Code effective within the municipality.”
Buildings or projects in Addison for which a building permit was required, and changes in general occupancy classification.
“A certificate of occupancy or a certificate of compliance must be required (1) for all work for which a building permit was required and (2) whenever the general occupancy classification of a building is changed.”
On-site wastewater disposal systems included in the Town of Addison building-permit process.
“The Code Enforcement Official (CEO) in the Town of Addison, Town of Campbell, and Town of Tuscarora, on behalf of Steuben County, is Charles Cagle.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Addison or Steuben County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Addison publishes no rule on the point, not that none exists. Steuben County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Addison means bringing your own water and power. The kit we’d start with: