St. Lawrence County, New York
Town of Edwards is a town in St. Lawrence County, New York. Town of Edwards adopts its own zoning, so inside its limits Town of Edwards’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 8, 2026. Rules for unincorporated land are on the St. Lawrence County page.
Work inside the Town of Edwards that must comply with the Uniform Code.
“BUILDING PERMITS ARE REQUIRED FOR ANY WORK THAT MUST COMPLY WITH THE UNIFORM CODE, LISTED ARE A FEW OF THE REQUIRED ITEMS:”
Land inside the Town of Edwards, St. Lawrence County, New York.
“Establishment bf Districts: For the purpose of promoting the health, safety and| general welfare ofthe Town of Edwards, the town hereby creates a Residentiail/Agricultural (R/A) District which shall encompass all land within the Town of Edwards, excepting the area designated "Hamlet".”
Zoning districts inside Edwards town.
“Land Use District Map: The Edwk-ds Land Use District map shall designate the districts: Commercial, Residential, and Residential/Agricultural, and which, with all explanatory matter, is hereby made a part of these regulations.”
Mobile/manufactured homes inside Edwards town.
“Mobile Homes: Mobile homesiand mobile home parks are an allowed use in all disfricts. The following standards shall be met: Sipecial Requirements for Mobile Home: li Each mobile home shall be occupied only as a single family residence.”
Subdivision plats inside Edwards town.
“Article X Subdivision Regulations and Standards Section 1.; Application Requirements t a. Preliminary Plat b. FinarPlat Section 2. Planning Board Review and Decision”
Preliminary site-plan applications inside Edwards town.
preliminary site-plan application fee: per 50 USD (Per parcel)
“8. One-time application fee of $50.00 per parcel.”
Preliminary site-plan applications inside Edwards town.
planning-board action period: <= 62 days (From receipt of a complete preliminary application, unless a hearing is scheduled)
“1. {iProcedure: Within 62 days of receipt ofa complete preliminary application as defined in Article VII, Section 3 of this Local Law, the Plarming Board may approve the preliminary application or schedule a public hearing.”
Town of Edwards does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Newly created lots and single-family dwellings in the Residential/Agricultural District, excluding the Hamlet.
minimum lot size: 1 acre (Newly created lots in the R/A district) · minimum road frontage: 200 feet (Newly created lots in the R/A district)
“Lot and Yard Specifications- Residential/Agricultural District: Newly created lots in the R/A district require a one acre minimum, with 200 feet of road frontage. Existing lots require sufficient room to meet established setbacks.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Edwards or St. Lawrence County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Edwards publishes no rule on the point, not that none exists. St. Lawrence County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Edwards means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of St. Lawrence County: county rules, score and offices