Town of Conesville is a town in Schoharie County, New York. Septic permits inside Town of Conesville come from Schoharie County (Schoharie County Public Health — Environmental Health · 518-295-8705). 9 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Schoharie County page.
Construction, enlargement, alteration, repair, removal, or demolition of a building or other structure inside Conesville town.
“The Town of Conesville requires the issuance of a building permit for the construction, enlargement, alteration, repair, removal or demolition of any building or other structure”
Construction inside Conesville town.
“The Town of Conesville duly adopted the "NYS Fire Prevention and Building Construction" code to provide minimum requirements to safeguard the public safety”
Structures inside Conesville town before use.
“Certificate of Occupancy Required before any structure can be used, and issued after compliance with laws is checked Town”
Subdivision of land inside Conesville town.
“Subdivision Approval For subdivision of land Towns of Conesville and Gilboa”
Eligible solar photovoltaic installations inside Conesville town.
permit determination timeline: <= 30 calendar days (Upon receipt of a complete and accurate application.)
“Permit determinations will be issued within 30 calendar days upon receipt of complete and accurate applications. The municipality will provide feedback within 30 calendar days of receiving incomplete or inaccurate applications.”
Town of Conesville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Sewage-system applications inside Conesville town, which is in Schoharie County.
“In order to process an application for a sewage system within Schoharie County you are required to submit two copies of stamped and signed plans prepared by a New York State (NYS) Licensed Professional Engineer or Registered Architect to the Schoharie County Department of Health for review and approval.”
Sewage systems inside Conesville town.
“Once the plans have been approved, a Permit to Construct a Sewage Treatment System will be issued and the system may be installed.”
New sewage systems inside Conesville town.
“Once the system is installed and prior to being buried, a final inspection is required to be completed by your engineer to ensure that the system was installed to the planned specifications.”
Construction or reconstruction of a driveway within the right-of-way of a public highway inside Conesville town.
“Construction in Highway Right-of-Way Construction, reconstruction within the right-of-way of a public highway, including construction and repair of driveways, side roads, utility lines, drainage facilities Schoharie County, Town Highway Department”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Conesville or Schoharie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Conesville publishes no rule on the point, not that none exists. Schoharie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Conesville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.