Zoning, building permits and septic rules in Town of Butternuts, New York

Town of Butternuts is a town in Otsego County, New York. 4 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Otsego County page.

Answers from the rulebook for Town of Butternuts

Town of Butternuts’s own rules

  • SetbacksSpecified

    Structures subject to the Town's Site Plan Review Law inside the Town of Butternuts.

    • The limits appear in the Town Site Plan Review Law and apply to structures subject to that law.

    property-line setback: >= 10 feet · road setback: >= 30 feet

    “Structures shall not be placed within ten (10) feet of any property line and must be set back a minimum of 30 feet from the road.”
  • Manufactured homesLimited

    Manufactured homes in commercial manufactured-home parks inside the Town of Butternuts.

    • Each manufactured-home lot must have a concrete-pad stand that provides stable placement and retention of the home.
    • All projects must comply with Otsego County Codes.
    “Each manufactured home lot shall have a manufactured home stand (concrete pad) [...] All projects must comply with Otsego County Codes.”
  • Driveway accessLimited

    Driveway location and design for site-plan development inside the Town of Butternuts.

    • Approval must be obtained from the owner of the affected road.
    • The road owner may be the Town Highway Superintendent, Otsego County, or New York State Department of Transportation.
    • The purpose is safe sight distance and safe emergency access.
    “Driveway location and Driveway Design will require the approval of the road owner [...] to ensure safe sight distances”
  • Permit feesPublished (with conditions)

    Town site-plan applications inside the Town of Butternuts.

    • The $10 fee applies where the application is filed before construction starts.
    • The law separately states a $50 fee for applications after construction starts and $500 for each repeated offense.
    • Consultation and extraordinary review expenses are charged to the applicant.

    site-plan application fee before construction: 10 USD (Application filed prior to start of construction.) · site-plan application fee after construction begins: 50 USD (Application filed after construction has already started.) · repeated-offense fee: per 500 USD (For each repeated offense.)

    “$10 –application is filed prior to start of construction $50- application is filed after construction has already started $500 -for each repeated offense”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Butternuts or Otsego County directly.

  • Building permit — Residential building construction inside the Town of Butternuts.
  • Owner-builder exemption — Owner-built residences inside the Town of Butternuts.
  • Building code adopted — Building construction inside the Town of Butternuts.
  • Certificate of occupancy — Occupancy of buildings inside the Town of Butternuts.
  • Local zoning — Land inside the Town of Butternuts, Otsego County, New York.
14 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Lot coverage
  • Building height
  • Living in an RV
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Butternuts publishes no rule on the point, not that none exists. Otsego County’s page lists the county offices to call.

← All of Otsego County: county rules, score and offices