Orleans County, New York
Town of Gaines is a town in Orleans County, New York. Town of Gaines adopts its own zoning, so inside its limits Town of Gaines’s rules apply, not the county’s. Septic permits inside Town of Gaines come from Orleans County (Orleans County Health Department, Environmental Health · (585) 589-3278). 18 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Orleans County page.
Establishing or erecting a use or structure, or developing land, inside the Town of Gaines.
“No use or structure shall be established or erected nor land developed until a permit has been issued by the Zoning Enforcement Officer in accordance with the provisions of this ordinance.”
Buildings, structures, and other facilities under construction inside the Town of Gaines.
“The Zoning Enforcement Officer shall make regular site visits during the period of construction of all buildings, structures or other facilities under construction in the Town of Gaines.”
A structure or use completed under an approved application inside the Town of Gaines.
“The Zoning Enforcement Officer shall issue a certificate of conformity with the Zoning Laws, granting final permission to occupy or use the structure.”
Land inside the Town of Gaines, Orleans County, New York.
“This Ordinance shall be known as and may be cited as the "Zoning Ordinance of the Town of Gaines, Orleans County, New York, 1983,"”
Zoning districts inside the Town of Gaines.
“For the purpose of promoting the public health, safety, morals and general welfare of the Town of Gaines, the Town is hereby divided into the following types of districts: RA Residential/Agricultural C Commercial CH Commercial/Historical I Industrial”
Dwellings inside the Town of Gaines.
minimum gross habitable floor area: >= 980 square feet
“DWELLING: Any building, structure or portion thereof, including a mobile home, designed, used or intended to be used exclusively as a residence or sleeping place for one (1) or more persons, with a gross habitable floor area of not less than 980 square feet.”
Travel trailers and campers on private land inside the Town of Gaines.
private-land occupancy limit without special permit: <= 10 days (Owner consent and all applicable health standards are required.)
“Travel trailers and campers shall not be occupied on an overnight basis except at an approved camping ground, or, with the consent of the owner, for a period not exceed ten (10) days on private land, provided all applicable health standards are met. Occupancy for periods longer than (10) days is permitted only upon receipt of a special permit issued by the Zoning Enforcement Officer.”
Temporary camper or travel-trailer occupancy on private land inside the Town of Gaines.
private-land occupancy limit without special permit: <= 10 days (Owner consent and all applicable health standards are required.)
“Travel trailers and campers shall not be occupied on an overnight basis except at an approved camping ground, or, with the consent of the owner, for a period not exceed ten (10) days on private land, provided all applicable health standards are met.”
A permanent tiny home proposed as a dwelling inside the Town of Gaines.
minimum gross habitable floor area for dwelling: >= 980 square feet
“DWELLING: Any building, structure or portion thereof, including a mobile home, designed, used or intended to be used exclusively as a residence or sleeping place for one (1) or more persons, with a gross habitable floor area of not less than 980 square feet.”
Individual mobile or manufactured homes inside the Town of Gaines.
single-wide minimum area: >= 980 square feet (Measured by exterior floor area dimensions.) · double-wide minimum area: >= 1200 square feet (Measured by exterior floor area dimensions.)
“Single wide mobile homes shall be placed and located only in Mobile Home Parks and/or used in agricultural operations as Farm Labor Housing. Double Wide mobile homes shall be permitted only in RA districts and Mobile Home Parks.”
Water-supply and sewage-disposal plans submitted with a Town of Gaines permit application.
“Evidence of approval of the water supply and the sewage disposal system plans by the Orleans County Health Department, or its agent or a duly appointed agent of the Town of Gaines must be submitted at the time of application.”
Water-supply and sewage-disposal plans submitted with a Town of Gaines permit application.
“Evidence of approval of the water supply and the sewage disposal system plans by the Orleans County Health Department, or its agent or a duly appointed agent of the Town of Gaines must be submitted at the time of application. Applications lacking such information shall not be accepted.”
Minor and major subdivisions inside the Town of Gaines.
“Separate regulations have been adopted for minor and major Subdivisions, which require Site Plan approval. The ZBA shall review all applications for subdivisions for compliance with the Town of Gaines Development Regulations (adopted February 12, 2002).”
Town of Gaines code-enforcement, zoning, site-plan, and permit applications listed in the Town's published fee schedule.
houses and garages fee: $30.00 plus .15 / SQ FT (The published page marks this item with an asterisk and states site-plan review is required and does not include the site-plan-review fee.)
“All fees must be paid at the time of submitting an application and are non-refundable.”
Town of Gaines zoning and building-permit applications.
issuance period after approval: <= 15 days (When all ordinance requirements have been met.)
“When all requirements of this Ordinance have been met, the Zoning Enforcement Officer shall forthwith issue a building permit and return one approved copy of the sketch plan map no later than fifteen (15) days after approval.”
Town of Gaines does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings in the RA (Residential/Agricultural) District of the Town of Gaines.
minimum lot size: >= 40000 square feet
“Minimum Lot Size: Forty thousand (40,000) square feet.”
Buildings under 4,000 square feet in the RA (Residential/Agricultural) District of the Town of Gaines.
front setback: >= 100 feet (120 feet for Ridge Road.) · side setback: >= 15 feet · rear setback: >= 15 feet
“Front: One hundred (100) feet, except for Ridge Road, which is one hundred and twenty (120) feet? Side: Fifteen (15) feet. Rear: Fifteen (15) feet.”
Buildings under 4,000 square feet in the RA (Residential/Agricultural) District of the Town of Gaines.
maximum height: <= 35 feet
“Frontage: Two hundred (200) feet. Height: Thirty-five (35) feet. Minimum Lot Size: Forty thousand (40,000) square feet.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Gaines or Orleans County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Gaines publishes no rule on the point, not that none exists. Orleans County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Gaines means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.