Ontario County, New York
Town of Farmington is a town in Ontario County, New York. Town of Farmington adopts its own zoning, so inside its limits Town of Farmington’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Ontario County page.
Work in Farmington town that must conform to the Uniform Code or Energy Code, including residential construction.
“Building permits required. Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation, or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney, or flue in any dwelling unit.”
Permitted construction in Farmington town.
“Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer or by an inspector authorized by the Code Enforcement Officer. The permit holder shall notify the Code Enforcement Officer when any element of work described in Subsection C of this section is ready for inspection. Said notification shall be no less than 24 hours in advance of a scheduled inspection.”
Land inside the Town of Farmington.
“[HISTORY: Adopted by the Town Board of the Town of Farmington 3-24-1980 (Ch. 36 of the 1969 Code). Amendments noted where applicable.]”
Zoning districts in Farmington town.
published districts: A-80; RR-80; RS-25; R-7.2; R-1-15; R-1-10; R-2; RMF; RB; NB; GB; LI; GI; PD; WEFD; overlays
“§ 165-18 A-80 Agriculture District (80,000 square feet lot size). [...] § 165-34.2 MSOD Main Street Overlay District.”
Short-term rental of residential property inside Farmington town.
“Owners shall not use their property as a short-term residential rental without obtaining a revocable short-term residential rental permit from the Town of Farmington and a completed registration with Ontario County.”
Building permits in Farmington town.
“The fee specified in or determined in accordance with the provisions set forth in § 74-18 (Fees) of this chapter must be paid at the time of submission of an application for a building permit, for an amended building permit, or for renewal of a building permit.”
Building-permit applications in Farmington town.
“Applications for a building permit shall be made, in writing, on a form provided by or otherwise acceptable to the Code Enforcement Officer. The application shall be signed by the owner of the property where the work is to be performed or an authorized agent of the owner.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Farmington or Ontario County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Farmington publishes no rule on the point, not that none exists. Ontario County’s page lists the county offices to call.