Bolthole Index

Onondaga County, New York

Zoning, building permits and septic rules in Town of Manlius, New York

Town of Manlius is a town in Onondaga County, New York. Town of Manlius adopts its own zoning, so inside its limits Town of Manlius’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Onondaga County page.

Answers from the rulebook for Town of Manlius

Town of Manlius’s own rules

  • Building permitLimited

    Small detached sheds and playscapes inside the Town of Manlius (under 144 square feet).

    • Sheds and playscapes under 144 square feet do not need a building permit under the town exemption.
    • Setback requirements for each zone still apply to these structures.
    • The exemption in § 59-4(b)(1) covers one-story detached tool/storage sheds, playhouses or similar uses with gross floor area not exceeding 144 square feet.

    gross floor area maximum for permit-exempt shed: <= 144 square feet (one-story detached structures associated with one- or two-family dwellings or townhouses)

    “provided the gross floor area is does not exceed 144 square feet”
    One more reviewed finding on this topic
    • Required — Work inside the Town of Manlius that must conform to the uniform code or energy code, including construction, enlargement, alteration, removal, relocation or demolition.
      “Building permits required. Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation, or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney, or flue in any dwelling unit.”
  • Building code adoptedAdopted

    All buildings, structures and premises inside the Town of Manlius that are subject to the town building chapter (Chapter 59).

    • Adoption is of the New York State Uniform Fire Prevention and Building Code and the Energy Code as administered by the town code enforcement officer.
    • The adoption clause also covers the NYS Stretch Energy Code 2020 and the International Residential Code as set forth in 19 NYCRR parts 1219 through 1227.
    “the uniform code, the energy code, nystretch energy code 2020, and the international residential code, and all appendixes, supplements and the like, set forth in title 19 nycrr parts 1219 through 1227, are hereby adopted by the town of manlius.”
  • InspectionsRequired

    Permitted construction work inside the Town of Manlius before a certificate of occupancy or certificate of compliance is issued.

    • Inspections must be requested with 24 hours' notice and made with town personnel (town planning page).
    • Phone voice-system scheduling is not honored (town planning page).
    • Inspection is required before the certificate of occupancy is issued.

    inspection notice: >= 24 hours

    “The Code Enforcement Officer or an inspector authorized by the Code Enforcement Officer shall inspect the building, structure, or work prior to the issuance of a certificate of occupancy or certificate of compliance.”
  • Certificate of occupancyRequired

    Use or occupancy of work inside the Town of Manlius that was the subject of a building permit, and conversions of use.

    • Occupancy is allowed only after a certificate of occupancy or certificate of compliance is issued.
    • A fee in § 59-23 is paid when the application is submitted.
    • Applies to all structures or portions converted from one use or occupancy classification to another.
    “Certificates of occupancy and certificates of compliance required. A certificate of occupancy or certificate of compliance shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof which are converted from one use or occupancy classification or subclassification to another.”
    One more reviewed finding on this topic
    • Limited — Temporary occupancy of a building or part of a building in the Town of Manlius before the permitted work is complete.
      “A temporary certificate of occupancy shall be effective for a period of time, not to exceed six months, which shall be determined by the Code Enforcement Officer and specified in the temporary certificate of occupancy.”
  • Local zoningPresent (with conditions)

    Land inside the Town of Manlius limits (outside the incorporated villages of Fayetteville, Manlius and Minoa). The town administers its own zoning ordinance, Chapter 155 of the town code.

    • The town planning page refers to the town zoning ordinance as town code chapter 155, and the zoning chapter itself is hosted on eCode360 as Chapter 155 Zoning.
    • District-level rules are in Chapter 155; the zoning map is kept by the Town Clerk per secondary copies, not verified here.
    “The Town of Manlius Zoning Ordinance (Town Code Chapter 155-22) allows for the parking/storage in the open of one unlicensed operative motor vehicle.”
  • SetbacksDistrict specific (with conditions)

    Structures inside the Town of Manlius, with setbacks set by each zoning district; the shed exemption does not remove setbacks.

    • Specific setback distances per district (R-1 and R-A) were not read on an official page; see followup.
    “Any shed or playscapes less than 144 square foot do not need a building permit, however, the setback requirements for each zone are still applicable.”
  • Manufactured homesLimited

    Individual mobile homes on conforming sites in the Restricted Agricultural (R-A) district of the Town of Manlius.

    • Permitted only after the Town Board issues a mobile home permit under § 155-21.
    • Other conditions in § 155-21 (ownership, public hearing, one unit per site, skirting, certificate of occupancy, NYS code) appear in secondary copies but were not verified on the official page and are not recorded here.
    “individual mobile homes on sites conforming to this section shall be permitted in restricted agricultural (r-a) districts only after the issuance of a mobile home permit by the town board as enumerated in this section.”
    One more reviewed finding on this topic
    • Prohibited — Mobile home camps and mobile home parks inside the Town of Manlius, outside the incorporated Villages of Fayetteville, Manlius and Minoa.
      “mobile home camps or mobile home parks are hereby prohibited in all zoning districts in the entire town of manlius outside of the incorporated villages of fayetteville, manlius and minoa.”
  • Building in a floodplainLimited

    Construction or development on land inside a designated flood zone in the Town of Manlius only.

    • Applies only to properties in designated flood zones; flood hazard maps are kept at town hall.
    • Flood damage prevention chapter not opened; specific permit requirements remain unverified. Followup queued.
    “Properties located within designated flood zones are subject to special building and development requirements.”
  • Permit feesPublished

    Building permit and certificate of occupancy fees inside the Town of Manlius

    • The town planning page lists a 2026 fee schedule, but the schedule itself was not opened; its amounts are not recorded here.
    • Chapter 59 § 59-23 sets the fees; the fee is paid when the certificate application is submitted.
    “2026 fee schedule construction documents single family homes only”
  • Permit processPartial

    Building permit process for work inside the Town of Manlius

    • Application forms are listed by the town (new single-family home, commercial, other building applications), but the forms themselves were not opened.
    • Inspections require 24 hours' notice to town personnel.
    “All inspections require 24 hour notice and must be made with Town personnel.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Manlius or Onondaga County directly.

  • Owner-builder exemption — Owner-built construction inside the Town of Manlius
  • Zoning districts — Zoning district map and list for land inside the Town of Manlius
  • Minimum dwelling size — Minimum dwelling floor area inside the Town of Manlius
  • Minimum lot size — Minimum lot size for the main single-family residential district (R-1) and the restricted agricultural district (R-A) inside the Town of Manlius
  • Lot coverage — Lot coverage limits inside the Town of Manlius
15 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Manlius publishes no rule on the point, not that none exists. Onondaga County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Manlius means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Onondaga County: county rules, score and offices