Building permits, zoning and septic rules in the Village of East Rockaway, New York

The Village of East Rockaway, in Nassau County, New York, administers its own zoning code, Chapter 288, through the village superintendent of construction1. Building work must meet the New York State Uniform Code and the village's building construction chapter2. Septic and sewage disposal approvals come from the Nassau County Department of Health, not the village3.

At a glance

Zoning
Yes: village Chapter 288, enforced by the superintendent of construction1
Building permit
Required for work covered by the NYS Uniform Code; the village building office handles it42
Permit fees
Set by Board of Trustees resolution; amount not confirmed5
Septic
Nassau County Department of Health, Bureau of Environmental Engineering3
Certificate of occupancy
Required for work that needed a building permit6

Who to call

Building permits

Village of East Rockaway Building Department

Village building and zoning office; first stop for building permits and zoning questions inside the village

(516) 887-6310

376 Atlantic Avenue, East Rockaway, New York 11518-0189

Septic permits

Nassau County Department of Health, Bureau of Environmental Engineering

On-site sewage disposal plan approvals and SPDES permits for Nassau County, including villages

516-227-9692

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Village of East Rockaway means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does East Rockaway, NY have zoning?

Yes. The Village of East Rockaway administers Chapter 288 Zoning of its village code, and the superintendent of construction enforces it1. Nassau County itself does not zone: zoning is set by each city, town and village, with the county Planning Commission reviewing certain referred zoning actions7.

We could not confirm the village's district rules on RVs, tiny homes, minimum dwelling size, lot size or setbacks. Do not assume any of those are allowed on a village lot; ask the village building office at (516) 887-6310 before you plan8.

Do you need a building permit in East Rockaway, and who issues it?

Yes for work covered by the New York State Uniform Code: a building permit is required for work that must conform to it, and the local authority administers the requirement4. In East Rockaway, the village code points to its own Chapter 101 on building construction alongside the state code2. The village building office at 376 Atlantic Avenue is the place to apply and ask8.

A certificate of occupancy is required for work that was the subject of a building permit6. The village charges inspection fees in an amount set by resolution of the Board of Trustees; we could not confirm the current amount5.

How do septic permits work in East Rockaway?

Septic and sewage disposal approvals for Nassau County are handled by the Nassau County Department of Health, Bureau of Environmental Engineering, and not by the village3. The county states that residential and commercial facilities in areas served by public sewers must connect to the sewer9.

We could not confirm whether a particular East Rockaway address is on public sewer. Ask the Bureau of Environmental Engineering at 516-227-9692 before relying on a septic system9.

Building in East Rockaway: the steps, in order

  1. Call the village building office to confirm the zoning district and what your project needs8.
  2. Confirm sewer or septic status with the Nassau County Department of Health9.
  3. Apply for a building permit from the village; work must conform to the NYS Uniform Code4.
  4. Pay the inspection fees the Board of Trustees has set5.
  5. Obtain a certificate of occupancy before use6.

What stays with Nassau County, and what to check before you buy

The village decides zoning and building permits inside its limits1. Septic and sewage disposal stay with the Nassau County Department of Health3. For land outside the village, see the Nassau County page.

In flood-mapped areas, development needs a local permit from the municipality10. Ask the village building office which flood zone a parcel is in. A driveway onto a state highway needs a New York State Department of Transportation permit11.

Watch-outs

  • We could not confirm the village's rules on RVs, tiny homes, accessory dwellings, setbacks or lot size; ask the village building office before you buy, since the village decides zoning for its own land1.
  • The village's inspection fee amount is set by Board of Trustees resolution and we could not confirm it5.
  • Nassau County Health, not the village, approves on-site sewage disposal3.

Sources

  1. Village of East Rockaway Code Ch. 288 Zoning, Art. XV Enforcement (Village of East Rockaway), quoted and re-checked
  2. Village of East Rockaway Code Ch. 288 Zoning, Art. XV Enforcement (Village of East Rockaway), quoted and re-checked
  3. On-Site Sewage Disposal System and SPDES Permit, quoted and re-checked
  4. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  5. Village of East Rockaway Code Ch. 288 Zoning, Art. XV Enforcement (Village of East Rockaway), quoted and re-checked
  6. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  7. Zoning Review, quoted and re-checked
  8. Village of East Rockaway Building Department (villageofeastrockaway.org)
  9. Nassau County Department of Health, Bureau of Environmental Engineering (nassaucountyny.gov)
  10. Floodplain Management - NYSDEC (New York statewide rule), quoted and re-checked
  11. Residential Driveway Permits (New York statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of East Rockaway

Village of East Rockaway’s own rules

  • Building code adoptedAdopted

    Construction inside East Rockaway village; village code references Chapter 101 Building Construction and the NYS Uniform Fire Prevention and Building Code

    • Chapter 101 text itself was not opened.
    “in violation of the provisions of this chapter, chapter 101, building construction, the new york state uniform fire prevention and building code and/or any other applicable provisions of the code of the village of east rockaway.”
  • Local zoningPresent

    Land inside East Rockaway village

    • Village administers Chapter 288 Zoning through the superintendent of construction.
    “this chapter shall be enforced by the superintendent of construction.”
  • Permit feesVariable (with conditions)

    Inspection fees under Chapter 288 inside East Rockaway village

    • Fee amount set by resolution of the Board of Trustees; the amount was not located.
    “the superintendent of construction may impose on and collect from the property owner a fee in an amount established from time to time by resolution of the board of trustees.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of East Rockaway or Nassau County directly.

  • Owner-builder exemption — Owner-builder exemption inside East Rockaway village
  • Inspections — Building inspections inside East Rockaway village
  • Certificate of occupancy — Certificates of occupancy inside East Rockaway village
  • Zoning districts — Zoning districts inside East Rockaway village
  • Minimum dwelling size — Minimum dwelling size inside East Rockaway village
19 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of East Rockaway publishes no rule on the point, not that none exists. Nassau County’s page lists the county offices to call.

← All of Nassau County: county rules, score and offices