Bolthole Index

Monroe County, New York

Zoning, building permits and septic rules in Village of East Rochester, New York

Village of East Rochester is a village in Monroe County, New York. Village of East Rochester adopts its own zoning, so inside its limits Village of East Rochester’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Monroe County page.

Answers from the rulebook for Village of East Rochester

Village of East Rochester’s own rules

  • Building permitRequired

    Erection or structural alteration of buildings/structures inside East Rochester village

    • Permit expires in one year unless project completed; void if project not initiated within six months; one extension up to one year may be requested.
    • Single- or two-family residential applications in residential districts are referred to the zoning board of appeals for architectural review (45 days; failure to act is approval).
    • Permit issued only if the proposal conforms to all other applicable laws and ordinances.
    “a building/use permit or special use permit shall be a prerequisite to the erection or structural alteration of a building, structure or use thereof.”
  • Certificate of occupancyRequired

    New structures and other listed events inside East Rochester village

    • Must be obtained within 90 days prior to completion of a new structure, occupancy of a substantially altered or moved structure or changed use, and other listed events.
    • Conditional certificates may be issued at the officer's discretion.
    • Waived for certain title transfers (estates, foreclosure, etc.).
    “the building inspector/code enforcement officer, in his discretion, may issue a conditional certificate of occupancy within 90 days prior to the occurrence of any of the events enumerated in § 193-41c”
  • Local zoningPresent

    All land inside East Rochester village (Town/Village of East Rochester, Monroe County, NY)

    • Enacted under Article 7 of the NY Village Law; administered by the building inspector/code enforcement officer with the zoning board of appeals.
    “enactment of this chapter by the town/village of east rochester is pursuant to article 7 of the village law of the state of new york.”
  • Zoning districtsPublished

    Zoning districts inside East Rochester village

    • Districts per Ch. 193 Art. X: R-1-70, R-1-48, PD, TR, LC, C/I, GC, I.
    • Dimensional values are in Schedules I and I-a attachments, not read here.
    “§ 193-53 r-1-70 and r-1-48 residential districts. § 193-54 pd planned development district. § 193-55 tr townhouse residential district. § 193-56 lc limited commercial and c/i mixed commercial/industrial districts. § 193-57 gc general commercial district. § 193-58 i industrial district.”
  • Permit processPublished

    Building/use permit and certificate of occupancy applications inside East Rochester village

    • Site plan required with application (§ 193-43).
    • Non-single/two-family uses go to site plan review; ZBA acts within 62 days.
    • Fees set by board resolution (§ 193-44, not read).
    “all applications for building/use permits shall be made to the building inspector/code enforcement officer in the detail specified in § 193-43 of this chapter.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of East Rochester or Monroe County directly.

  • Owner-builder exemption — Inside East Rochester village
  • Building code adopted — Inside East Rochester village
  • Inspections — Inside East Rochester village
  • Minimum dwelling size — R-1-70 and R-1-48 districts
  • Minimum lot size — R-1-70 and R-1-48 districts
20 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of East Rochester publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of East Rochester means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Monroe County: county rules, score and offices