Livingston County, New York
Town of Lima is a town in Livingston County, New York. Town of Lima adopts its own zoning, so inside its limits Town of Lima’s rules apply, not the county’s. Septic permits inside Town of Lima come from Livingston County (Livingston County Department of Health - Environmental Health · 585-243-7280). 6 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Livingston County page.
Projects inside the Town of Lima for which permits have been issued.
“The Code Enforcement Officer inspects projects for which permits have been issued to ensure that construction complies with approved plans and regulations.”
Land inside the Town of Lima, Livingston County, New York.
“[HISTORY: Adopted by the Town Board of the Town of Lima 3-4-2010 by L.L. No. 1-2010. Amendments noted where applicable.]”
Town of Lima does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual sewage treatment systems inside the Town of Lima, which is within Livingston County.
maximum sewage flow for cited county applicability: < 1000 gallons per day (Other establishments under the cited applicability provision)
“This article shall apply to the construction and maintenance of all individual sewage treatment systems located within Livingston County which are designed and installed to discharge sewage without admixture of industrial or other waste to the ground waters of New York State, from a dwelling designed to house less than three families, or any other establishment from which the sewage flow is determined to be less than one thousand gallons per day.”
Construction, installation, or modification of an individual sewage treatment system inside the Town of Lima.
permit construction period: 2 years (Good cause may support an additional period not exceeding one year)
“No person shall construct, install, or modify an individual sewage treatment system within Livingston County without having filed for and received a written permit from the Chief Executive Officer.”
Individual sewage treatment systems inside the Town of Lima subject to the Livingston County sanitary code.
“A final inspection of the individual sewage treatment system must be conducted to verify correct installation in accordance with plan requirements and permit conditions. The inspection must be performed by a professional engineer or Department of Health representative.”
Residences in Lima town without an approved community sanitary sewerage system that have water supply, plumbing fixtures, or a receptacle creating sanitary flow.
“Where no approved community sanitary sewerage system is available, each residence provided with a water supply, plumbing fixtures, or with a receptacle to create a sanitary flow, shall be equipped with an individual sewage treatment system. Greywater systems shall not be excluded.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Lima or Livingston County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Lima publishes no rule on the point, not that none exists. Livingston County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Lima means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.