Lewis County, New York
Town of Turin is a town in Lewis County, New York. Town of Turin adopts its own zoning, so inside its limits Town of Turin’s rules apply, not the county’s. Septic permits inside Town of Turin come from Town of Turin. 19 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Lewis County page.
Structures for which a Lewis County building permit is sought inside Turin town.
“You will need an approved Town of Turin Land Use Permit (from this office) in order to obtain a Lewis County Building Permit (for the structure).”
Land-use-permitted development inside Turin town.
“The enforcement officer shall be empowered to make site inspections as necessary to assure compliance with this law. lt shall be the mutual responsibility of permit applicants and the enforcement officer to arrange for inspection of premises prior to permit issuance.”
A use or structure requiring a Turin land-use permit.
“No use or structure requiring a land use permit shall be occupied, used, or changed in use until a certificate of conipliance has been issued by the enforcementofficerstatingthat the use or structure complies with the provisions of thi law.”
Land inside the Town of Turin, Lewis County, New York.
“The town shall be dìvided into the following land use districts, which are shown on the attached map and schedule which are kcluded in this law by reference.”
Land inside Turin town.
districts: A, B, C, D, F, W Overlay, MW Overlay
“A District B District C District D District F District W Overlay District-Water Supply Protection Overlay District (see Section 360) MW Overlay District - Municipal Water Overlay District (see Section 365)”
Lots and structures in the Town's mapped A, B, C, D, F, W-overlay, and MW-overlay districts.
“All principal and accessory uses and structures, other than signs, shall meet the following totfrontage and setback requirements for the district in which it is situated: [...] Lot frontage mìnimum 300 200 200 600, or 400lwith a 15- acre minimum lotsize 600, or 400with a 15- acre minimum lotsize”
Principal and accessory uses and structures, other than signs, in Turin town.
“Setback minimums: [...] from centerline of state highways [...] from centerline of other roads [...] from side and rear lot lines [...] from well to septic absorption field [...] from well or septic absorption field to any lot line”
Structures inside Turin town.
general maximum structure height: <= 40 feet (Listed exemptions and special-use approval for taller structures.)
“No structure shail exceed 40 feet in height except agricultural structures, chimneys, communication towers, television and radio masts and antennas, water tanks, spires, and wind towers. Structures excecding 40 feet in height shall be allowed only upon approval of a special use review”
Overnight occupancy of recreational camping vehicles inside Turin town.
maximum consecutive days at an existing single-family dwelling: <= 14 days (Requires owner consent and must be accessory to the dwelling.)
“Recreational camping vehicles shall not be occupied on an overnight basis except in the following circumstances: i. When located in a campground which has been approved pursuantto Section 415 ofthis law; or 2. When located on the site of an existing single-family dwelling as an accessory use ofthe dwelling, with the consent ofthe owner, and is not occupied for more than 14 consecutive days.”
Campsites and camping vehicles inside Turin town.
“Campsite: A campsite is a seasonal, interim use and not intended to be a permanent livable residence and lacks the physical featuresofa dwelling.Campsites are temporary and shall not be used as a residence and must be mobile and moved without any additional structural features. FEMA trailers are temporary housing units and are not allowed.”
Temporary agricultural placement of manufactured homes in Turin town.
maximum manufactured homes: <= 2 homes (Temporary agricultural special-necessity approval.) · removal period after special necessity ends: <= 6 months (Temporary agricultural special-necessity approval.)
“the planning board may grant a special use approval for the installation of a maximum of two manufactured homes [...] 1) the manufactured homes shall not be occupied by persons other than employee or family mertibers, and 2} the manufactured hornes shall be removed within six months from the date when the special necessity ceases.”
Accessory apartments inside Turin town.
“1. No more than one accessory apartment shall be allowed for each dwelling unit 2. Each accessory apartment shall be a maximum of 600 square feet. 3. Lot size and dimensions shall conform to the district in which the dwelling is situated.”
On-site sewage-disposal systems inside Turin town.
“No land ue activity as listed below, otherthan those specifically exempted in Section 1007 ofthis law, shall be carried out until land use permit has been issued by the enforcement officer [...] 8. Construction, replacementor major modification ofanyon-site sewage disposal system;”
Construction, replacement, or major modification of an on-site sewage-disposal system inside Turin town.
“No land ue activity as listed below, otherthan those specifically exempted in Section 1007 ofthis law, shall be carried out until land use permit has been issued by the enforcement officer [...] 8. Construction, replacementor major modification ofanyon-site sewage disposal system;”
On-site sewage-disposal work requiring a Town land-use permit inside Turin town.
“The enforcement officer shall be empowered to make site inspections as necessary to assure compliance with this law. lt shall be the mutual responsibility of permit applicants and the enforcement officer to arrange for inspection of premises prior to permit issuance.”
Driveway installation associated with a Turin land-use permit application.
“Driveways may be subject to regulation; applicant is responsible to contact entity that controls Right of Way prior to installation.”
Floodplain development inside Turin town.
“Administer and enforce Local Flood Damage Prevention Laws. [...] Issue Building, Zoning and Flood plain Development Permits.”
Town of Turin land-use permits.
“Permit fees shall be established by town board resolution. The cost of any additional site inspections, tests, or professional consulting needed to comply with the regulations of this law shall be paid by the applicant.”
Town of Turin land-use permit applications.
plot plan copies: 2 copies (Required with all land-use permit applications.)
“Permit applications shall be filed with the town clerk, who shall refer them to the enforcement offlcer. [...] Two copies af a plot plan drawn to scale shall be submitted with all applicationsfor land use permits.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Turin or Lewis County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Turin publishes no rule on the point, not that none exists. Lewis County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Turin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.