Herkimer County, New York
Town of Winfield is a town in Herkimer County, New York. Town of Winfield adopts its own zoning, so inside its limits Town of Winfield’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Herkimer County page.
Buildings erected, relocated, or altered as to outside dimensions; changes in use; and excavations for a building in the Town of Winfield.
“No building shall hereafter be erected [...] unless and until a permit therefore has been issued”
Each building or lot for which the Town zoning regulations require a certificate of compliance.
inspection timing after notification of project completion: <= 10 days
“The Enforcement Officer shall make or cause to have made an inspection [...] before issuing such certificate.”
Land used or occupied, and buildings erected, altered, extended, or changed in use, in the Town of Winfield.
“No land shall be used or occupied [...] until the Enforcement Officer shall have issued a certificate of compliance.”
Land in the Town of Winfield, Herkimer County, New York.
“These regulations shall be known and may be cited as “ZONING REGULATIONS FOR THE TOWN OF WINFIELD.””
Zoning districts in the Town of Winfield.
districts: R-A Residential-Agricultural; C-H Commercial Highway; L-C Land Conservation; P-D Planned Development; R Residential
“R-A Residential-Agricultural District C-H Commercial Highway District L-C Land Conservation District P-D Planned Development District”
Lots in the Town of Winfield zoning districts, including R and R-A districts.
“Regulations governing lot area and lot width [...] are specified in Schedule A”
Front, side, and rear yards in Town of Winfield zoning districts, including R and R-A districts.
“front, side and rear yards; building coverage and building height are specified in Schedule A”
Building coverage in Town of Winfield zoning districts, including R and R-A districts.
“building coverage and building height are specified in Schedule A”
Building height in Town of Winfield zoning districts, including R and R-A districts.
“building coverage and building height are specified in Schedule A”
Building/use permits under the Town of Winfield zoning regulations.
“The fee for any such permit shall be as determined from time by the Town Board.”
Building/use-permit applications under Town of Winfield zoning regulations.
“Each application shall state the purpose for which the structure or land is to be used”
Town of Winfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Mobile homes in the R-A Residential-Agricultural District in the Town of Winfield.
minimum floor area: >= 700 square feet (Mobile homes)
“Said Mobile Home shall have a minimum floor area of 700 square feet.”
Mobile homes, as defined by the Town regulations, in the R-A Residential-Agricultural District in the Town of Winfield.
minimum mobile-home floor area: >= 700 square feet
“Uses Permitted Upon Authorization of the Planning Board: [...] 2. Mobile home”
Development in the Land Conservation District, including the mapped area 200 feet on either side of shoreline at normal water level, in the Town of Winfield.
shoreline setback for permanent buildings or structures: >= 50 feet (Unless permitted by the Planning Board in accordance with its guidelines and otherwise permitted in the district)
“No permanent building or structure shall be located within fifty (50) feet of the shoreline at normal water level, except as permitted by the Planning Board”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Winfield or Herkimer County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Winfield publishes no rule on the point, not that none exists. Herkimer County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Winfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.