Essex County, New York
Town of Keene is a town in Essex County, New York. Septic permits inside Town of Keene come from Town of Keene. 9 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Essex County page.
Erection, construction, enlargement, alteration, removal, improvement, movement, demolition, conversion, occupancy change, plumbing installation, and heating-equipment installation within Keene town.
“No person, firm or corporation shall commence the erection, construction, enlargement, alteration, removal, improvement, movement, demolition, conversion or change in the nature of occupancy of any building or structure; or install plumbing or heating equipment; or cause the same to be done, without first having applied for and obtained a permit from the Code Enforcement Official of the Town.”
Completion of new home construction within Keene town.
“A Certificate of Occupancy is required upon completion of new home construction.”
Septic work within Keene town.
“Town of Keene Building & Fire Codes Department [...] Note 2: Permits and fees are required for septic, fuel burning devices and Chimneys.”
Septic work within Keene town.
“Note 2: Permits and fees are required for septic, fuel burning devices and Chimneys.”
On-lot sewage disposal systems within Keene town.
shoreline setback for sewage tile field, seepage pit, septic tank, or holding tank: >= 100 feet (Measured from the normal annual high water mark of the water body.)
“No on-site sewage tile field or seepage pit shall be located within one hundred (100) feet of any shoreline and no septic or other holding tank shall be located within one hundred (100) feet of any shoreline, as measured from the normal annual high water mark of the water body.”
Division of land within Keene town.
maximum lots for minor division: <= 6 lots (Also subject to the definition's road, municipal-facility, Critical Environmental Area, and impact conditions.)
“Any division of a parcel of land into two (2) or more lots, parcels or sites, whether adjoining or not, for the purpose of sale, lease, license or any form of separate ownership or occupancy save by devise.”
New driveways entering a town, county, or state road within Keene town.
“Any access permits necessary from the County of Essex, Town of Keene or State of New York as a result of access causing entry to a state, town or county highway shall be obtained by the applicant to compliance with the terms of this section.”
Building-permit applications within Keene town.
building permit application fee: 40 USD (Non-refundable permit application fee.)
“NON-REFUNDABLE PERMIT APPLICATION FEE......$40.00”
Building permit applications within Keene town.
“Responsibility for obtaining a building permit, any required inspections and any necessary certificates upon completion shall be that of the owner of record.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Keene or Essex County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Keene publishes no rule on the point, not that none exists. Essex County’s page lists the county offices to call.