Town of Elma is a town in Erie County, New York. Town of Elma adopts its own zoning, so inside its limits Town of Elma’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Erie County page.
Work within Elma that must conform to the Uniform Code or Energy Code.
“A building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation, or demolition of any building or structure or any portion thereof, and the installation of a solid fuel-burning heating appliance, chimney, or flue in any dwelling unit.”
Building-permit work for which a certificate of occupancy or compliance is sought in Elma.
“The Code Enforcement Officer or an inspector authorized by the Code Enforcement Officer shall inspect the building, structure, or work prior to the issuance of a certificate of Occupancy or certificate of compliance.”
Work subject to a building permit and structures converted to another use or occupancy classification in Elma.
“A certificate of occupancy or certificate of compliance shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or subclassification to another.”
Land within the Town of Elma, Erie County, New York.
“[HISTORY: Adopted by the Town Board of the Town of Elma 7-18-1950 by Ord. No. 2. Amendments noted where applicable.]”
Private wastewater disposal in Elma where public sewer is unavailable.
“Where a public sewer is not available, under the provisions of § 115-11, the building lateral shall be connected to a private wastewater disposal system complying with the provisions of the Rules and Regulations of the NYSDOH, NYSDEC, and/or the Erie County Health Department.”
Sewer service for land in Elma served by the public sewer system.
“At such time that a public sewer becomes available to a property, a direct connection shall be made to the public sewer, in compliance with this chapter, and any cesspool, septic tank, and similar wastewater disposal facilities shall be cleaned of septage, by a licensed septage hauler, and finally either filled with clean sand, bank-run gravel, or dirt, or removed and properly disposed.”
New building-permit applications in Elma.
“Before a building permit is issued, driveway culvert shall be installed, the building staked out and a copy of a certified survey submitted with the application for a building permit.”
Building-permit applications in Elma.
“Applications for a building permit shall be made, in writing, on a form provided by or otherwise acceptable to the Code Enforcement Officer.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Elma or Erie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Elma publishes no rule on the point, not that none exists. Erie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Elma means bringing your own water and power. The kit we’d start with: