Dutchess County, New York
Village of Red Hook is a village in Dutchess County, New York. Village of Red Hook adopts its own zoning, so inside its limits Village of Red Hook’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Dutchess County page.
Construction, alteration or moving of buildings/structures (including accessory buildings) inside Red Hook village; the quoted rule is the zoning permit issued by the code enforcement officer
zoning permit term: 6 months (renewable once for six months)
“it shall be unlawful to commence the excavation for or the construction of any building or structure, including accessory buildings, or to commence the moving or alteration of any building or structure, including accessory buildings, until the code enforcement officer has issued a permit for such work.”
Inspections by the code enforcement officer inside Red Hook village under the zoning chapter
“who shall have the power to make inspections of buildings or premises necessary to carry out his duties in the enforcement of this chapter.”
Land, buildings or structures erected or altered in use inside Red Hook village
CEO final inspection after notice: <= 5 days
“within five days after notification that a building or structure or premises or part thereof is ready for occupancy or use, it shall be the duty of the code enforcement officer to make a final inspection thereof and issue a certificate of occupancy”
All land inside Red Hook village (Dutchess County) limits
“the provisions of this chapter shall be administered and enforced by the code enforcement officer appointed by the village board”
Zoning districts inside Red Hook village
“§ 200-8 residential district r20,000. § 200-9 residential district r10,000. § 200-10 general business district gb.”
Accessory dwelling units only (§ 200-19) inside Red Hook village; no minimum for principal dwellings located
minimum habitable space, accessory dwelling: >= 500 sq ft
“and shall provide not less than 500 square feet of habitable space.”
Residential District R10,000 (§ 200-9) inside Red Hook village
minimum area per dwelling unit, central sewer: >= 10000 sq ft · minimum area per dwelling unit, no central sewer: >= 20000 sq ft
“(3) area per dwelling unit not served by central sewer. the minimum area per dwelling unit not served by central sewer shall be 20,000 square feet.”
“the minimum lot area per dwelling unit shall be 20,000 square feet.”
Residential Districts R20,000 (§ 200-8 D(11)) and R10,000 (§ 200-9 D(11)) inside Red Hook village; identical text in both
maximum lot coverage: <= 15 percent
“(11) coverage. the maximum coverage of a lot shall be 15%.”
Residential Districts R20,000 (§ 200-8 D(10)) and R10,000 (§ 200-9 D(10)) inside Red Hook village; identical text in both
maximum height: <= 35 ft or 2 1/2 stories, whichever is less
“(10) height. no building or structure shall exceed 35 feet in height or 2 1/2 stories, whichever is less.”
Accessory dwelling on a lot with a one-family dwelling in the R20,000 and R10,000 districts inside Red Hook village (§ 200-19)
accessory dwellings per lot: <= 1 dwelling · maximum size vs principal dwelling habitable floor space: <= 35 percent · minimum habitable space: >= 500 sq ft
“(1) only one accessory dwelling shall be permitted on a lot as an accessory use to a one-family dwelling unit.”
Driveway location in R20,000 and R10,000 districts inside Red Hook village
driveway center line distance from street-line intersection: >= 70 ft
“no driveway center line shall intersect a street line less than 70 feet from the intersection of any two street lines.”
Zoning permit and certificate of occupancy procedure inside Red Hook village
“if a zoning permit is refused, the code enforcement officer shall state such refusal, in writing, with the cause”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Red Hook or Dutchess County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Red Hook publishes no rule on the point, not that none exists. Dutchess County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Red Hook means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.