Cortland County, New York
Town of Taylor is a town in Cortland County, New York. Town of Taylor has not adopted its own zoning; the county’s or state’s rules apply inside its limits. Septic permits inside Town of Taylor come from Cortland County (Cortland County Environmental Health Division · 607-753-5035). 15 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Cortland County page.
Erection of any structure on land within Taylor town.
“No person, being the owner or occupant of any land within the Town of Taylor, shall use or permit the use of such land for the erecting of any structure without first obtaining the appropriate permit(s) as hereinafter provided.”
Structures installed in Taylor town.
“All structures installed in the Town of Taylor shall be installed in compliance with the applicable provisions of ARTICLE 19AA of NYS Executive Law and related State Codes for construction and installation of residential, nonresidential, habitable, uninhabitable, and accessory structures.”
Construction conducted under a Taylor town building permit.
“If permit is approved, the applicant meets with the Building Inspector to establish a schedule of inspections. Applicant shall notify Building Inspector at each specified phase of construction.”
Completed permitted construction in Taylor town.
“After his inspection, and if he has received proof of final electrical and septic inspections, or any other agency approval as may be required, he will issue a Certificate of Occupancy or of Compliance, whichever is applicable.”
Land inside the Town of Taylor, Cortland County, New York.
“Adopted regulations include Mobile Home Ordinance and Subdivision Control. Does not have a Comprehensive Plan, Site Plan Review or Zoning Ordinance”
Taylor town zoning districts.
“Adopted regulations include Mobile Home Ordinance and Subdivision Control. Does not have a Comprehensive Plan, Site Plan Review or Zoning Ordinance”
Parking, storage, or use of an individual mobile/manufactured home in Taylor town.
“No person, being the owner or occupant of any land within the Town of Taylor, shall use or permit the use of such land for the parking, storage, or use of a mobile/manufactured home without first obtaining the appropriate permit(s) as hereinafter provided.”
Subdivisions inside Taylor town.
“The Planning Board coordinates the planning of subdivisions and approves any subdivision in the town. Property owners must consult with the Planning Board before subdividing”
Taylor town subdivision applications.
simple subdivision fee: 20 USD · minor subdivision fee: 40 USD · major subdivision fee: 80 USD
“Fee Schedule: Simple Subdivision: $20.00 Minor Subdivision: $40.00 Major Subdivision: $80.00 Checks made payable to: Town of Taylor”
Taylor town building permits.
“APPLICANT RETURNS COMPLETED APPLICATION along with all required information to the Town Clerk. Application fee is paid at that time. Checks should be made out to the Town of Taylor. Clerk then forwards the application to the Code Enforcement Officer.”
Town of Taylor does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual sewage-treatment systems inside Taylor town, which is within Cortland County.
“The provisions of this Code shall be in force throughout the Health District.”
New or modified individual sewage-treatment systems for dwellings in Taylor town.
“No person shall undertake to construct an individual sewage treatment system, or modify an existing individual sewage treatment system, without having first obtained a permit to construct an individual sewage treatment system issued by the Commissioner.”
Completed individual sewage-treatment systems in Taylor town.
“After construction, alteration or extension of an individual sewage treatment system has been completed, no portion of the system shall be covered with soil or placed in operation until it is first inspected by a NYS licensed professional engineer.”
On-site sewage disposal in Taylor town.
“No person shall construct, maintain, or use any pipe, drain, sewage treatment system or privy so as to expose or discharge sewage to the atmosphere, onto the ground surface or into any storm sewer, drain, roadside ditch or into any water course or body of water within the Health District unless approval for such exposure or discharge has been issued in accordance with the provisions of the State Environmental Conservation Law.”
New construction and replacement private drinking-water wells in Taylor town.
“A permit is needed for all new construction and replacement wells.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Taylor or Cortland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Taylor publishes no rule on the point, not that none exists. Cortland County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Taylor means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.