Columbia County, New York
Town of Livingston is a town in Columbia County, New York. Town of Livingston adopts its own zoning, so inside its limits Town of Livingston’s rules apply, not the county’s. Septic permits inside Town of Livingston come from Columbia County (Columbia County Department of Health, Environmental Health Division · 518-828-3358). 17 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Columbia County page.
Altered land uses and buildings occupied, used, or changed in use inside Livingston town.
issuance period after compliant approval: <= 10 days (After erection or alteration is approved as compliant.)
“No land use shall be altered and no building shall be occupied, used or changed in use until a certificate of occupancy has been approved by the Zoning Administrator and issued by the Building Inspector stating that the building or proposed use thereof complies with the provisions of this law and all other applicable laws and regulations.”
Land inside the Town of Livingston, Columbia County, New York.
“Said districts are bounded as shown on a map entitled "Zoning Map - Town of Livingston", last revised March 9, 2006, with explanatory matter thereon, which is hereby adopted and made a part of this Local Law.”
Zoning districts inside Livingston town.
districts: CH-2, HDR-2, LDR-2, CON-7, C-1, FAO, AD/LI-1, LC-1
“CH-2 HDR-2 LDR-2 CON-7 C-1 FAO AD/LI-1* LC-1**”
One manufactured home on a lot already improved by a one-family dwelling inside Livingston town.
minimum lot size: >= 4 acres (Lot already improved by a one-family dwelling.) · minimum separation: >= 80 feet (Between existing one-family dwelling and manufactured home.)
“Where a four (4) acre or larger lot is already improved by a one-family dwelling, a manufactured home (mobile home) may also be placed on that lot, provided that the placement of the manufactured home (mobile home) results in both the existing one-family dwelling and the manufactured home (mobile home), in relation to each other and generally, being in compliance with all applicable set back, yard frontage and other zoning and subdivision requirements”
Subdivision of land inside Livingston town.
“Where a lot is hereafter formed from the part of a lot already occupied by a building, such separation shall be effected in such manner that each lot thus created conforms to all of the requirements of this law and the Town Subdivision Regulations, except as specifically permitted elsewhere in this law.”
Building-permit applications inside Livingston town.
zoning-administrator review period: <= 30 days (Approve, disapprove, or refer application.) · permit-issuance period: <= 5 days (After approval and receipt of applicable fees.)
“The Zoning Administrator shall approve, disapprove, or refer the application to the Planning Board within thirty (30) days. Upon approval of the application and upon receipt of the applicable fees, the Building Inspector shall issue a building permit to the applicant upon the prescribed form within five (5) days”
Town of Livingston does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Low Density Residential District (LDR-2) inside Livingston town.
minimum building living area per family: >= 700 square feet (LDR-2 schedule entry.)
“District Height (acres) Coverage Width Per Family Front Side Rear [...] LDR-2 2 1/2 35 2 20 150 700 40 40 40”
Agricultural Development/Light Industrial District (AD/LI-1) inside Livingston town.
minimum lot area per family: >= 1 acres (AD/LI-1 schedule entry.)
“District Height (acres) Coverage Width Per Family Front Side Rear [...] AD/LI-1 2 1/2 35 1 65 150 700 30 20 20 20”
“District Height (acres) Coverage Width Per Family Front Side Rear [...] LDR-2 2 1/2 35 2 20 150 700 40 40 40”
Agricultural Development/Light Industrial District (AD/LI-1) inside Livingston town.
front-yard setback: >= 30 feet (AD/LI-1 schedule entry.) · side-yard setback: >= 20 feet (AD/LI-1 schedule entry.) · rear-yard setback: >= 20 feet (AD/LI-1 schedule entry.)
“AD/LI-1 2 1/2 35 1 65 150 700 30 20 20 20 [...] Setbacks are to be measured from property lines.”
“LDR-2 2 1/2 35 2 20 150 700 40 40 40 [...] Setbacks are to be measured from property lines.”
Agricultural Development/Light Industrial District (AD/LI-1) inside Livingston town.
maximum lot coverage: <= 65 percent (AD/LI-1 schedule entry.)
“District Height (acres) Coverage Width Per Family Front Side Rear [...] AD/LI-1 2 1/2 35 1 65 150 700 30 20 20 20”
“District Height (acres) Coverage Width Per Family Front Side Rear [...] LDR-2 2 1/2 35 2 20 150 700 40 40 40”
Agricultural Development/Light Industrial District (AD/LI-1) inside Livingston town.
maximum building height: <= 35 feet (AD/LI-1 schedule entry.) · maximum building height: <= 2.5 stories (AD/LI-1 schedule entry.)
“Maximum Minimum Maximum Minimum Minimum Minimum Building Building Lot Area Lot Lot Living Area Yard Setback District Height (acres) Coverage Width Per Family Front Side Rear (stories) (feet) (%) (sq.ft.) (ft.) (ft.) (ft.) [...] AD/LI-1 2 1/2 35 1 65 150 700 30 20 20 20”
“Maximum Minimum Maximum Minimum Minimum Minimum Building Building Lot Area Lot Lot Living Area Yard Setback District Height (acres) Coverage Width Per Family Front Side Rear (stories) (feet) (%) (sq.ft.) (ft.) (ft.) (ft.) [...] LDR-2 2 1/2 35 2 20 150 700 40 40 40”
Sewage facilities serving buildings seeking a certificate of occupancy inside Livingston town.
“No certificate of occupancy shall be issued without prior approval of sewage facilities by the Columbia County Department of Health.”
Development in the Flood Area Over Zone/Flood District inside Livingston town.
“Within the Flood District, no person shall erect, construct, enlarge, alter, repair, improve, or move any permitted building or structure nor shall any permitted activity such as mining, dredging, filling, grading, paving, excavation, or drilling commence without first obtaining a permit from the Zoning Administrator.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Livingston or Columbia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Livingston publishes no rule on the point, not that none exists. Columbia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Livingston means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.