Chemung County, New York
Town of Catlin is a town in Chemung County, New York. Town of Catlin adopts its own zoning, so inside its limits Town of Catlin’s rules apply, not the county’s. Septic permits inside Town of Catlin come from Chemung County (Chemung County Health Department, Environmental Health Services · 607-737-2019). 20 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Chemung County page.
Structures or land uses inside Catlin town.
“No STRUCTURES or land shall be USED, no BUILDING or STRUCTURE shall be erected, added to, or structurally altered until a permit therefore as specified herein has been issued by the CODE ENFORCEMENT OFFICER.”
New, structurally altered, extended, or changed-use buildings or structures inside Catlin town.
issuance period: <= 30 days (after erection or alteration has been approved as complying with the law)
“No building or STRUCTURE hereafter erected, structurally altered, or extended shall be USED, or changed in USE until a NOTICE OF COMPLIANCE or Occupancy shall have been issued by the CODE ENFORCEMENT OFFICER in accordance with this Law.”
Land inside the Town of Catlin, Chemung County, New York.
“This Law shall be known as the "Zoning Law of the Town of Catlin, N.Y.", and may be cited as “TOWN OF CATLIN ZONING LAW”.”
Zoning districts inside Catlin town.
base districts: Agricultural Residential (AR); Residential (R1); Neighborhood Business (NB); General Business (GB)
“In order to fulfill the purpose of this Law, the Town of Catlin establishes and is hereby divided into the following 4 districts: Agricultural Residential (AR) Residential (R1) Neighborhood Business (NB) General Business (GB)”
Flea-market sites inside Catlin town.
“No overnight camping or permanent occupancy shall be permitted unless specifically authorized in an approved SITE PLAN.”
Driveway entrances or exits into a road in Catlin town.
“No new DRIVEWAY or alteration or relocation made to an existing DRIVEWAY shall be made without first securing permission from the Highway Superintendent.”
Building permits inside Catlin town.
“Building Permit Fee effective 6-1-2025 (pdf)Download”
Zoning/building-permit applications inside Catlin town.
plot-plan copies: 2 copies
“There shall be submitted, with each application for a Zoning Permit, a fee as established by Town Board and two copies of a layout or plot plan drawn to scale showing the actual dimensions of the LOT to be built upon, the exact size and location on the LOT of any existing and/or proposed BUILDING and ACCESSORY STRUCTURES to be erected, and such other information as may be necessary to determine and provide for the enforcement of this Law.”
Town of Catlin does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building construction inside Catlin town.
“The Uniform Code is applicable in every part of the State (except the City of New York, which was permitted to retain its own code).”
Uniform-Code work inside Catlin town.
“Construction Inspections. Inspections of certain specified elements of the construction process must be required. Building permits holders must keep work accessible and exposed until inspected and accepted by the municipality.”
One-unit dwellings in Catlin's Agricultural Residential district.
minimum habitable dwelling area: >= 1200 square feet
“ONE UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 1,200 with no overall exterior dimension less than 20'*”
One-unit dwellings in Catlin's R-1 Residential district.
minimum lot area: >= 3 acres (one-unit dwelling with 30 minutes or less percolation: 1 acre)
“ONE-UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 ONE-UNIT DWELLING (with 30 min or less percolation) 1 Acre 150 50 25 75 25 35 2”
“ONE UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 1,200 with no overall exterior dimension less than 20'*”
One-unit dwellings in Catlin's Agricultural Residential district.
front setback: >= 75 feet · side setback: >= 50 feet · rear setback: >= 75 feet
“ONE UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 1,200 with no overall exterior dimension less than 20'*”
One-unit dwellings in Catlin's Agricultural Residential district.
maximum lot coverage: <= 10 percent
“ONE UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 1,200 with no overall exterior dimension less than 20'*”
One-unit dwellings in Catlin's Agricultural Residential district.
maximum building height: <= 35 feet · maximum stories: <= 2 stories
“ONE UNIT DWELLING 3 Acres 250 75 50 75 10 35 2 1,200 with no overall exterior dimension less than 20'*”
Agriculture/crops or agriculture/livestock uses with an accessory dwelling unit in Catlin's Agricultural Residential district.
“AGRICULTURE/LIVESTOCK - ACCESSORY DU 10 Acres 500 75 50 75 10 35 2 same as above AGRICULTURE/CROPS - ACCESSORY DU 5 Acres 300 75 50 75 10 35 2 same as above”
Private wastewater systems serving buildings, dwellings, or premises inside Catlin town.
“No person shall construct a system or facilities for the private treatment of waterborne sewage, domestic, or trade wastes, to serve any building, dwelling, or premises in or from which such wastes may be discharged without first having obtained a "Construction Permit" from the Chemung County Health Department.”
Land in Catlin's Flood Damage Prevention Overlay district.
“FDPO Flood Damage Prevention Overlay which shall conform to and meet all of the requirements of Local law # 1 of 1987, Town of Catlin Flood Damage Prevention Local Law.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Catlin or Chemung County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Catlin publishes no rule on the point, not that none exists. Chemung County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Catlin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.