Town of Sheridan is a town in Chautauqua County, New York. 10 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Chautauqua County page.
Building projects inside Sheridan town.
inspections during April through September: >= 2 inspections · inspections during remaining months: >= 1 inspection
“It shall be the duty of the Building Inspector or other authorized officer to make at least two (2) inspections of all building projects during the months of April, May, June, July, August and September of each year and at least one occasion during the remaining months.”
New construction, substantial improvements, subdivision proposals, new developments, and new or replacement water-supply or sanitary-sewage systems in Sheridan's Flood Hazard Area District.
“It shall be required that all new construction, substantial improvements, subdivision proposals, new developments and new or replacement water supply/sanitary sewage systems will come under the following permit system if it falls within the Flood Hazard Area (FHA) District.”
Town zoning and short-term-rental permits inside Sheridan town.
“A fee schedule shall be established by resolution of the Town Board of this Town and may thereafter be amended from time to time by resolution.”
Town zoning-permit applications inside Sheridan town.
application decision period: <= 15 days (application, plan, or amendment filed pursuant to the zoning ordinance)
“The Building Inspector shall approve or reject any application, plan or amendment thereto, filed pursuant to the provisions of this ordinance, within fifteen (15) days and if approved, shall issue a permit. All denials shall be in writing with the reasons for the action taken stated.”
Town of Sheridan does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Lots inside Sheridan town on which a household sewage treatment system is installed; this is a Health District sanitation standard, not a Town zoning-district standard.
minimum lot size: 15000 square feet (where public water is available and public sewer is not available) · minimum lot size: 40000 square feet (where neither public water nor public sewer is available)
“Where public water is available and a public sewer is not available the minimum lot size shall be 15,000 square feet. Where neither public water nor public sewer is available the minimum lot size shall be 40,000 square feet.”
Construction, installation, connection, alteration, or extension of a household sewage treatment system inside Sheridan town.
permit expiration: 1 year after issuance (unless an extension has been granted in writing)
“No person shall construct, install, connect, alter or extend a household sewage treatment system within the Chautauqua County Health District without having first applied for and received a written permit from the Public Health Director. No permit is required for minor repairs.”
New or modified household sewage treatment systems inside Sheridan town.
inspection request notice: >= 48 hours
“A property owner shall request an inspection of his or her household sewage treatment system at least 48 hours in advance of expected time of completion. The household sewage treatment system shall not be covered or placed into operation until the system has been inspected and approved by the Public Health Director.”
Private off-grid sanitation systems inside Sheridan town where no approved public sanitary sewerage system is available.
“Pit privies are not to be utilized, and privies are to be Watertight Vault Privies.”
Dwellings and structures requiring potable water inside Sheridan town when public systems are available and accessible.
existing-water-supply connection period: <= 90 days (when ordered because the other supply fails stated standards)
“For all new construction of dwellings or other structures requiring potable water where a municipal public water system is available and accessible, the source of potable water serving said dwelling or structure shall be from the municipal public water system.”
Individual household sewage systems in approved subdivisions inside Sheridan town.
“Individual household sewage treatment systems in approved subdivisions shall follow the provisions of this Article and the approved requirements contained on the plans filed in the office of the Chautauqua County Clerk.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Sheridan or Chautauqua County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Sheridan publishes no rule on the point, not that none exists. Chautauqua County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Sheridan means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.